MSD 12711 Parbake Mezzanine Final Meeting Clem Pin (ME) Sam Phillips (ME) Graham Frasch (ME)Simon Stam (ME) Matt Lynch (EE) Stefan Colegrove(EE)

Slides:



Advertisements
Similar presentations
 1  Outline  putaway  pallet storage and retrieval  case retrieval  project.
Advertisements

Wegmans Freezer Inventory Control MSD #12714 Ben Whipple Emily Burns Tim Hogan Ben Jilson.
Intel Water Reclaim Project Final Report 5/25/05.
2014 ParBake Sanitation Project Kick-off Meeting.
Network Design and Implementation
Senior Design Review Andrew Beasten Greg Feather Alex Phillips Brendan Moran Wegmans Bread Tray Lift Assist.
D-R Compressor Cell RIT Senior Design Team P13458 Week 4 Status Report.
Chapter 15 Application of Computer Simulation and Modeling.
1 Job Element Sheet Process: Cheesecake Bake – Depanning Setup Author: Andreana Crance, RIT MSD Date/Revision: 2/14/10, Rev 0 Labor Requirements: Supervisor.
What We Believe At Wegmans, we believe that good people, working toward a common goal, can accomplish anything they set out to do. In this spirit, we set.
Andreana Crance, Industrial & Systems Engineering Matt Syska, Industrial & Systems Engineering.
Wegmans: Flip-Label Project Team Members: Brandon Sbordone (ME), George Kilger (EE), Ben Bouffard (EE), Ian Baker (ME), Charlie Nicolosi (ME), Helen Jervey.
What We Believe At Wegmans, we believe that good people, working toward a common goal, can accomplish anything they set out to do. In this spirit, we set.
P12711 Parbake Mezzanine DDR 1. Design Review Expectations Review feasibility of design Improve overall design based on feedback and discussion 2.
Rev 11.  Slides guide discussion  Inform about recent progress  Summarize make vs. buy options ◦ Aligning ◦ Labeling  Discuss next steps 
P09713 – FRESH BREAD AND ROLL SCALING ROOM Week 3 Presentation Senior Design I: Winter Cecilia Enestrom, Kate Gleason, Erik Webster, Grant Garbach,
© 2004 Kraft Senior Design Project Improvements to Juice Work Cell Team Members: Jessica Vastola - ISE James Hildick - ME Molly Kearns - ISE Michael Leiston.
Project Status Update P09457 – Process Improvement Project Eric MacCormack (IE) Colin Roy (IE)
EDGE™ Project Review P Automation/Improvement of Wegmans Cookie Line Packaging Project Team: Stephanie Rager (IE), Bruno Coelho (ME), Mark Voss (ME),
 Which of the following is CAD and CAM ?  Computer aided desk  Computer and design  Computer aided design  Computer and drawing  Computer and manufacturing.
San Diego May, PLOPS Panel Line Optimization through Predictive Scheduling.
Wegmans Frozen Cookie Capacity Increase Final Project Presentation Richard Latham, Bridget Eggers, Tyler Brent, Valeria Gonzalez.
P09713 – Bread and Roll Scaling Room Sponsored by Wegmans R Modern Food Processing and Bakery Technology for Lean Production Systems Kate Gleason.
IM MATERIAL HANDLING. Material Handling Material handling is the function of moving the right material to the right place in the right time, in the right.
Chapter 4 Process Design.
Presented by Steven P. Feltman Food Safety and Quality Specialist.
Wegmans: Flip-Label Project Team Members: Brandon Sbordone (ME), George Kilger (EE), Ben Bouffard (EE), Ian Baker (ME), Charlie Nicolosi (ME), Helen Jervey.
Wegmans Bread Tray Lift Assist By Brendan Moran,Greg Feather Alex Phillips and Andrew Beasten.
Advisor: Dr. Edwin Jones 1 Client: Paul Jewell ISU Engineering Distance Learning Facility May01-13 Design Team: David DouglasCprE Matt EngelbartEE Hank.
P09712 Commercial Roll Line Shrink Reduction Evan DeCotis Levi Stuck Ryan Dennison Joseph Fitzery Cinthia Sanchez.
DESIGN 1 DPT224 TOPIC 2: ENGINEERING DESIGN PROCESS.
through Introduction  Particle Imaging Velocimetry (PIV) uses a sheet laser beam to illuminate particles that cross the sheet.  The particles.
Senior Design Review Andrew Beasten Greg Feather Alex Phillips Brendan Moran Wegman’s Bread Tray Lift Assist.
The Recycling Robot SECON Team B Mid-Term Presentation.
P09712 Commercial Roll Line Shrink Reduction Evan DeCotis Levi Stuck Ryan Dennison Joseph FitzeryCinthia Sanchez.
DETAILED DESIGN REVIEW Matthew Jackson, Derek Kreider, Emily Smith, Tashalynn Taylor December 10, 2013.
The Recycling Robot SECON Team B Mid-Term Presentation.
IMPROVEMENT MODEL. THE MODEL FOR IMPROVEMENT There are three fundamental questions that can be used to guide improvement efforts. Then using Plan – Do.
Wegmans Swirl Cake Process Improvement Multidisciplinary Senior Design RIT Fall / Winter
Allen Luccitti (ME). Mission Statement Product Description ▫ Test stand consisting of a centrifugal pump, closed loop flow system with control through.
Definition: The physical positioning of processes, departments, equipment and work areas to optimize an organization’s effectiveness in achieving its operating.
Search-Based Peer Reviewers Recommendation in Modern Code Review 32 nd IEEE International Conference on Software Maintenance and Evolution (ICSME) 2016.
How to become paperless and achieve a fast ROI
ITEC 275 Computer Networks – Switching, Routing, and WANs
It’s…….
Best Practices Consortium
Strategic Information Initiatives
Pipe Shop Consulting Planning and Execution of an Automated Pipe Shop
Viewing Data-Driven Success Through a Capability Lens
Turbomachinery Flow Visualization P08453
P07203 Dynamometry Laboratory Infrastructure
PRODUCTION.
System Development Life Cycle (SDLC)
Component Functionality
System Development Life Cycle (SDLC)
Pipe Shop Consulting Planning and Execution of an Automated Pipe Shop
Manual Task Mapping Template
P08351: Automated Oiling System
Object Oriented Analysis and Design
Tub Lift Rev. 2 Dom Group
P16702: ABVI Fabric Shredding Process and Facility Design
World-Views of Simulation
Design for X.
System Development Life Cycle (SDLC)
P10457: D-R Process Improvement
Teaching the Class College Writing.
Scheduling is Difficult
Detailed Design Review (Phase 4)
Detailed Design Review
SCM Master Data - 2 Master Data for Distribution & Production Processes EGN 5346 Logistics Engineering Fall, 2015.
Presentation transcript:

MSD Parbake Mezzanine Final Meeting Clem Pin (ME) Sam Phillips (ME) Graham Frasch (ME)Simon Stam (ME) Matt Lynch (EE) Stefan Colegrove(EE)

Agenda Design overview Testing review Customer needs Space constraints Optimal bread sorting Next steps

Project Task To reduce the ergonomic risks associated with bread packaging in the Parbake Mezzanine ◦ Scope limited to Mezzanine room.

The Design

Testing Testing DaysTesting Hours 10/18/ /30/ /3/ /4/ /11/ /13/ /15/ /20/ /27/ /29/ /31/ /5/ /12/ /16/ Total Days: 12 Total Hours: 37 Man Hours: 185

Pane Italian

Rounds

Testing Summary ProductGuidesCounterSorter Percentage RollsMediumVery GoodGood 12.4% RoundsVery Good Good 23.5% LoafMediumVery GoodGood 49.8% BaguettesPoorVery GoodGood 14.3%

Customer Needs Customer Need # ImportanceDescriptionProgress as of 2/24/12 CN1High Reduces Ergonomic Risk Yes CN2High Fills Boxes Correctly * CN3Med Is Durable Yes CN4Med Can be Cleaned/Sterilized Yes CN5High Can Maintain Production Rate * CN6Med Can be Easily Repaired Yes CN7High Meets Food Safety Requirements Yes CN8High Handles 80% of Products * CN9Med Meets Budget/ROI * CN10High Safely Fits in Allotted Area Yes CN11High Is Reliable *

*Comments CN2 – Counter and Lane Sorter work ◦ Awaiting system integration CN5 – Not all products tested ◦ Rounds Yes ◦ Pane Italian dependant on upstream orientation CN8 – 69% Tested CN11 – Most recent testing required operator intervention once every 10 minutes

Space Constraints Bread Sorting ◦ Current approach requires more conveyor area Box Coaster ◦ Requires more space between top conveyor and bread loading area Room Layout ◦ Current empty box stacking conflicts with required space

Conditions for Optimal Bread Sorting General Product Flow  Observed to be 60/40 with right side bias  50/50 is ideal  Conveyor speed increase  Decreases instantaneous product density at guides Pane Italian  Reorientation after oven exit  Single file orientation as proposed by 5-second delay

5 Second Delay

Lessons Learned Sorting bread is a complex process Fabrication Reworks ◦ CAD drawings provided were ambiguous.  Sit down meeting might have been required Upstream Sorting ◦ Made late push which showed promise ◦ Initial focus limited to the mezzanine

Next Steps Investigate upstream orienting solutions Commit to conveyor speed increase ◦ Purchase different gear drive Bring conveyance vendor in house for assessment on box conveyor

Wegmans Recommendations Provide onsite storage for testing components Provide access to a small basic tool set ◦ Much time was spent looking for tools to use

Questions?