Muon Piquet Training: General Informations March 8-th 2016.

Slides:



Advertisements
Similar presentations
Communications Training. Agenda §Welcome & Introductions §Review of todays training §Overview/background of HURT §Whats our job? §Site photos §What to.
Advertisements

Care and Use of the Netbook September You are responsible for your netbook. Don’t leave it unattended. Only use your own.
Period Run Coordinator Shift Guide Period Run Coordinator Shift Guide Updated on PRC Guide.
Aspect-Oriented Software Development (236601) 1 Home Assignment (what, where and when)
Suggestions :  All the Webpages should possibly be visualized entirely without scrolling  The first page should be a « welcome page » with only few links.
1.Shifter Intro 1. Introduction 2. Pit Area 8 – LHCb 3. Control Room 4. Cavern 5. Access to Cavern 6. Shift Organization 7. Safety 8. Calling Experts 9.
From Olivier to commissioning team plans for the start-up of regular operations of LHCb 30/06 to 4/07 : Global commissioning week, all detectors, full.
Connecticut Emergency Medical Technicians Practical Skills Examinations.
Calo Piquet Training Session - Xvc1 ECS Overview Piquet Training Session Cuvée 2012 Xavier Vilasis.
Muon Piquet Training. Intro - Disclaimer  This presentation is not intended to be a complete description of the system but a guide, possibly simple,
WLLS 102 Class 11 4/23/2004 Professor C. Shilepsky Wells College.
PPD Computing “Business Continuity” David Kelsey 3 May 2012.
East Area Secondary Beam Control User Guide Revised version after LS1 L.Gatignon / EN-MEF 5 January 2015.
M. Joos, PH/ESE1 BeamLine for Schools Introduction.
MoEDAL MoU EDMS No Issues from LHCb & CERN  MoEDAL at IP8  Infrastructure  TimePix Deployment  Access & Safety  General Conditions MoEDAL.
A.Golunov, “Remote operational center for CMS in JINR ”, XXIII International Symposium on Nuclear Electronics and Computing, BULGARIA, VARNA, September,
ATLAS Open Days Guides Safety Training. 1. Generalities: Name and phone number of the person responsible for the ATLAS visit point: Site manager: B. Di.
Access requirements D. Caforio Università di Bologna – INFN AFP Testbeam Organization meeting – October 18 th, 2012.
Inventory of radioactive sources present in the cavern at pit 8 Gloria Corti Experimental Area Meeting 05 August 2008.
Muon Shift Organization Outline Class 1 Atlas Control Room Shifts Booking Present Status + Experience+ Feedback Class 2 reminder A. Polini & Z. Yan May.
S’Cool LAB Safety Julia Woithe 1.
Muon Piquet Training V.0 W Baldini, E.Furfaro, O. Maev June 11-th 2015.
Safety of premises P. K. Frandsen SM 18 LHC Magnet test review 21 JUN 2005.
CSC Shifter Training Course – Global Running Fred Borcherding Reach from CSCOperations Twiki page or directly:
1.Shifter Intro 1. Introduction 2. Pit Area 8 – LHCb 3. Control Room 4. Cavern 5. Access to Cavern 6. Shift Organization 7. Safety 8. Calling Experts 9.
Dave Newbold, University of Bristol14/8/2001 Testbed 1 What is it? First deployment of DataGrid middleware tools The place where we find out if it all.
DHHS Open Window Office of Procurement & Contract Services Login & Set up Profile.
20OCT2009Calo Piquet Training Session - Xvc1 ECS Overview Piquet Training Session Cuvée 2009 Xavier Vilasis.
Welcome ! Local Information.
M4 Operations ● Operational model for M4 ● Shifts and Experts ● Documentation and Checklists ● Control Room(s) ● AOB Murrough Landon 24 July 2007.
CARE CASES.
Welcome to Art Class! Mrs. Stewart Art Room: 120.
Central DQM Shift Tutorial Online/Offline
(Access system for HWC)
Test beam check list Michael JECKEL EN-EA-EC.
Teacher Gradebook Setup for Middle & High Schools
CERN Mobile network migration
Central Online DQM Shift Tutorial March 2017, CMS DQM group
Safety in the Neutrino Platform Hall
Welcome! To the ETS – Create Client Account & Maintenance
CERN Service Management
Preparations for a Formula One Race C Whiting
Delete this slide before distribution
Shift instructions August 16, 2017 Antoni Aduszkiewicz
Preparation for CERN test beam
Like a town… Like a town Easy access to services at CERN
CERN Service Management
Experience between AMORE/Offline and sub-systems
LHCb & EYETS
Bomgar Remote support software
Quicken Tech Support Phone Number One of the top software there is, the quicken software can pose a number of trouble and if you are new.
Test Information Distribution Engine (TIDE)
Delete this slide before distribution
All About Account Michael Gilman Senior Business Systems Analyst.
Welcome to Campus Enterprises.
WELCOME TO JRES & SECOND GRADE!
Boreatton Park Shropshire 18th-22nd June 2018
OSHA – 10 hour Certification
Power Connections By: Adrienne and Tessa.
Data Updates.
2018 AP® Preadministration Session
UPDATED ACES CACFP.
Mrs. Whitehead’s Fourth-Grade Class
Welcome to MIS House Of Agnew By wisdom, not by force.
Improving Hand Hygiene Compliance at INSERT FACILITY NAME Training for Interrupted Observers
SITE SPECIFIC INFORMATION Stramit Erskine Park
CERN Brief Update – April 2019
Networking for Business Development
Discovering Technology
Presentation transcript:

Muon Piquet Training: General Informations March 8-th 2016

Intro - Disclaimer  This presentation is not intended to be a complete description of the system but a guide, possibly simple, to the most-likely-used tools of the Muon System  Some of You took already Piquet shifts, in this case this could be a refresher course.  It’s of paramount importance that, for the first piquet shift, you foresee a few days of overlapping with the previous piquet, or experts. Doing things “hands on” is more efficient than any training!  Suggestions on how to improve the Piquet training are VERY welcome! 2

General Informations  LHCb Geography:  Point8  Underground area  Muon System:  UX85B Detector area  UXA: « Barracks »  B1  D2  D3 1. Introductory infos for Muon Piquet 3  Burocracy:  Access  Computer Accounts  Phone numbers Out Of detector

1. Introductory infos for Muon Piquet 4 There will be a CERN car, but in case....

LHCb Geography: Point NEW Control room NEW Conference room (daily run metings) 1. Introductory infos for Muon Piquet 5 Main Entrance Internal Parking lot OLD Conference room

Pit Area 8  The meeting point in case of emergencies (fire,...) is the building 2890 at the site’s entrance.  By night (after 19:00) and week-ends, the main gate is closed.  You need to sweep your card twice if you enter by car, first at the main gate, then at the normal barrier.  Make sure you always bring and carry your CERN Access Card !  There is a coffee, drink and food area inside building 2885 with vending machines, useful during long nights... These machines accept € and CHF. 1. Introductory infos for Muon Piquet 6

LHC UX-A (barracks) UX-B (cavern-detector) Underground Cavern – UX85 1. Introductory infos for Muon Piquet 7 Elevator B1, D2, D3

Access to point 8  As Piquet, you MUST have the appropriate trainings and access rights:  Safety courses required: 1.CERN General courses (level 1,2,3) + computing 2.CERN – Beam Facilities 3.Level 4b (LHCb)  Can ALL be followed online:  request through EDH access to: 1.LHCB_S (surface buildings) 2.LHCB_U (underground areas) R-001 (NEW Control Room)  Get a dosimeter (building 55), you need a valid medical certificate  This takes time... Please take care of it before the beginning of your shifts 1. Introductory infos for Muon Piquet 8

Computing Accesses  For a Piquet is required:  an account on the LHCb ONLINE cluster, to get it send an e- mail to  access to the e-logbook: you can create it yourself  Online network is an isolated domain (LBDAQ.CERN.CH)  Linux (lbgw) and Windows (lbts) gateways  In the Control Room You can use the CERN general wifi network 1. Introductory infos for Muon Piquet 9

Sources of general Run Infos  Daily run meeting, 9:30 in the point 8 conference room ( )  Run News are distributed on the mailing list:  Longer term informations on the mailing list:  Plan of the day on the LHCb operation info panel 1. Introductory infos for Muon Piquet 10

Phone Numbers  Emergency: from ANY phone  Muon Piquet (your number!!):  LHCb Control Room  Shift Leader: 63595(fixed), (GSM)  Data Manager:  Muon Operator: (fixed)  from out of CERN:  GSM: last 4 numbers (example piquet phone: )  Fix phone numbers: last 5 numbers 1. Introductory infos for Muon Piquet 11

Shifters training New CR fix phone numbers: 12Federico Alessio Entrance Safety exit (no entrance) Coffee

More detailed and updates can be found in the twiki pages: keep also this training piquet indico page in your bookmarks 1. Introductory infos for Muon Piquet 13