PSL APA Update May 3, 2016 UW Physical Sciences Lab.

Slides:



Advertisements
Similar presentations
1S. Virostek - LBNL Spectrometer Solenoid Fabrication Update S. Virostek and M. Green are visiting vendor today for progress update Vendor expects to complete.
Advertisements

1S. Virostek - LBNL Spectrometer Solenoid Fabrication Update Vendor still expecting to complete first magnet by the end of November, before X-mas more.
GLAST LAT Project November 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: I&T Integration Readiness Review Integration, Facility, Configuration.
LSU 01/18/2005Project Life Cycle1 The Project Life Cycle Project Management Unit, Lecture 2.
Status Report #06 AVTS Automated Vehicle Tracking System David Brenner Caleb Douglas Ahmed Elsherif Michael W. Timme An automated license plate detection.
Electrical Integration WBS Eric J. Mannel Columbia University Electronics Project Engineer VTX and FVTX.
FAC, 10/12/06 D. Schultz 1 Readiness for 2007 Startup Linac Injector Controls ARR David Schultz.
EMDM Monolithic suspension development Activity plan Piero Rapagnani Detector meeting
Electrical Integration WBS Eric J. Mannel Columbia University Electronics Project Engineer VTX and FVTX.
1. 2 Outline Contract Status  Q.A. plan  construction plan Preparations for construction  populating the construction space Microscope electronics.
BAB 11 : Prototyping. Dira Ernawati, ST. MT - P3 2 Prototyping An approximation of the product along one or more dimensions of interest –Industrial designers.
GLAST Large Area Telescope:
4/25/11 G v3 1 Facility Modifications and Preparations (FMP) Technical Status Annual NSF Review of Advanced LIGO Project April , 2011 John.
Magellan Telescopes Observatory Report Accomplishments Problems Work in Progress Network f5 mirror coating.
Unit 5 – eProject – Project Organisation Procedures Set up and use procedures for storing and protecting project information, tracking and monitoring progress.
Status Report #1 LYRA The Remote Accessible Automated Camera Stand Developed by: Juan Cuellar, Nathan Dye, Timothy Hawley, & Matthew Hect September 17,
ASPERA-3 Apr. 25, 00 Monthly Status Report ASPERA Monthly Status ReportMonthly 4_25/ Page 1 Monthly Status Report Report due 4/25/00 Schedule statused.
E v3 aLIGO SEI Testing and Commissioning Overall Plan
Developing software and hardware in parallel Vladimir Rubanov ISP RAS.
M. Gilchriese Sector Status Module Loading Task Force Meeting November 18, 2004.
Silicon Meeting July 10, 2003 Module and Stave Production Status James Fast Fermilab.
Hall D Online Meeting 28 March 2008 Fast Electronics R. Chris Cuevas Group Leader Jefferson Lab Experimental Nuclear Physics Division System Engineering.
Ronald Lipton PMG June Layer 0 Status 48 modules, 96 SVX4 readout chips 6-fold symmetry 8 module types different in sensor and analog cable length.
THE PROJECT LIFE CYCLE PROJECT MANAGEMENT LIFE CYCLE LSU 01/18/2005 PROJECT LIFE CYCLE 1.
Chamber construction Construction Tools Production sites Assembly Sequence (“travelers”) Manpower P. Campana LNF – LHCb Muon EDR Cern April 16 th, 2003.
PHENIX WEEKLY PLANNING 2/14/2008 Don Lynch. 1/31/2008 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC supportOn GoingOn Going CM Crane.
ASPERA-3 Mar. 25, 00 Monthly Status Report ASPERA Monthly Status ReportMonthly 3_25/ Page 1 Monthly Status Report Report due 3/25/00 Schedule statused.
Global Muon Trigger / RPC Interface Warsaw and Vienna Groups RPC Electronics System Review Warsaw, 8 July 2003 presented by Claudia-Elisabeth Wulz.
CM27 – 8 th July 2010 LH2 System Progress and Future Plans M Hills T Bradshaw M Courthold I Mullacrane P Warburton.
DOE/NSF Review of U.S. ATLAS May 21-23, 2003 CSC Mechanics and Electronics Paul O’Connor Tom Muller BNL May 22, 2003.
Status Report #4 LYRA The Remote Accessible Automated Camera Stand Developed by: Juan Cuellar, Nathan Dye, Timothy Hawley, & Matthew Hect October 8, 2012.
1 SVT Status Update Yuri Gotra CLAS12 Silicon Vertex Tracker TCB Meeting March 13, 2015.
Summary Plans Content Module assembly at CERN and Dubna Readout DAQ Procurement Stacking Summary.
FourStar Status SAC Meeting 13mar2010 Persson, Murphy, Birk, Monson, Kelson, Uomoto.
Field Period Assembly Wayne Reiersen SC Project Review PPPL May 2006.
9/12/2003Ivan Hruska1 First box prototype –Box design in July ‘03 –Box produced during August ’03 Tested last week in few fingers Small changes necessary.
26-Feb-16S.Movchan Straw manufacturing and QC1 Dubna NA62 straw tracker assembly area (milestone) halls plans conclusion Presented by S.Movchan.
CMS Upgrade Workshop, FNAL, Oct 28-30, O.Prokofiev Update ME4/2 Chambers and Tooling A construction of new ME4/2 prototype at CERN Factory tooling,
Software Requirements for the Testing of Prototype Correlator Sonja Vrcic Socorro, December 11, 2007.
SPHENIX MECHANICAL D. Lynch September 11, AGENDA Global Design Concept – Updated Global Assembly Concept – Updated Inner HCal Installation concept.
Technical Board Summary Alan Bross MICE CM17 CERN February 25, 2007.
Single phase ProtoDUNE detector installation Plans and Constraints Jack Fowler Duke University 23-Feb-2016.
Single-Phase ProtoDUNE Construction Planning Jim Stewart LBNC January 11, 2016.
Stave 130 (Intermediate Thermo-mechanical Stave) Tim.
6-Mar-2016 Dan Wenman | FC Installation 1 APA installation and integration at CERN Shipment of APAs APA handling Acceptance testing Tools needed.
Proton PMG September 3 rd 2015 Cons Gattuso AD Shutdown Manager.
Drift Chamber Prototyping Plans at ODU Gail Dodge, Tom Hartlove, Mac Mestayer Nov. 18, 2005 Goals for FY06: Design 144 cell prototype of R1 Drift Chamber.
Communication Tools Used For Commissioning the 12 GeV CEBAF Accelerator Brian Freeman WAO (Mainz, Germany) October 2014.
Summary of IAPP scientific activities into 4 years P. Giannetti INFN of Pisa.
Proton PMG May 7 th 2015 Cons Gattuso AD Shutdown Manager.
ELENA installation progress F. Butin / ELENA collaboration.
LBT Q Eng/SW Review SFWG – Software Group General Norm Cushing.
Collaborating for Quality through the Project Quality Plan Matthew Conlon ESS ACCSYS QA/QC Quality Learning & Planning.
Managing the Project Lifecycle
Project definition and organization milestones & work-plan
Nodal Status Report: Program Controls Update
LARP Phase II Secondary Collimator RC1
LARP Phase II Secondary Collimator RC1
Working plan for 2017 Acquisition and Control Electronics
CMS November Upgrade Week
10/month is the present production rate 2 FTE + sporadic contributions
Camera to Top End Assembly Integration Travis Lange Camera I&T M. E
GLAST Large Area Telescope: I&T Integration Kickoff Meeting
B904 Status Report by Fred B.
Control System Summary of Changes Since PDR
Mark McKinnon EVLA Project Manager
GLAST Large Area Telescope
Status Report #5 LYRA The Remote Accessible Automated Camera Stand
X-Ray Endstations Update
Introduction and Overview
Presentation transcript:

PSL APA Update May 3, 2016 UW Physical Sciences Lab

Current work focus The focus of our work plan this year is to build a “process prototype” Anode Plane Assembly (APA), i.e. a full-scale 6x2.3m unit A key task is to design, build and commission an automated winding machine –Hardware is being assembled now and subsystem tests are underway –Z-stage hardware is together and being tested –Y-stage hardware is being assembled and will be ready for electrical integration in the next few days –PLC and software development is well underway Process prototype frame is complete The final design of the ProtoDUNE APA is nearly complete – the CR electronics boards and CE interface still need to be finalized Nearly complete draft of APA assembly procedure –APA traveler is being developed in parallel, this will be done in an electronic format (on a tablet)

Current work cont. APA production floor in the vault at SRC –Setup as a class 100k cleanroom, have up to 20k ft2 available –ProtoDUNE winder and process prototype are being set up there –Other tooling completed or in progress: transfer cart, in-process cart, interface frames and bearings, storage rack, lifting fixtures –Design for cryotest stand complete

Assembled Frame Being Surveyed

Winding Machine Vertical Loop

Winding Machine Vertical Loop in Fabrication

Wire spool transfer from one side of APA to the other during winding (AKA “Z Stage handoff”) See the movie…

Clean Room Area Under Construction

Near term plans The focus this year is to be ready to begin ProtoDune APA construction by mid-September –Winder development is behind by ~6 weeks but overall work remains on track to meet Sept start A key milestone is the APA design review to be held at PSL July –Finalize TDR document –Finalize quality and testing plans