Failure Mode: CPA. Surface Finish ProblemQA (Design)QC (Production) CPA edge tube surface scratches Shipping/handling procedures Visual inspection HV.

Slides:



Advertisements
Similar presentations
Silicon Technical Specifications Review General Properties Geometrical Specifications Technology Specifications –Mask –Test Structures –Mechanical –Electrical.
Advertisements

Electrical and thermal testing at Glasgow and Liverpool.
Click Profile & U strip edging. Click Profile edging and U Strip.
( 1 ) PROCEDURE FOR FLAT HEAT PRESS OPERATION PROCEDURE FOR MULTI FUNCTION HEAT PRESS MACHINE.
TPC Proposal for the 35 Ton Liquid Argon Test Abstract We propose to equip the 35 ton cryostat with one APA and two CPA’s, and all the necessary equipment.
Startup Training – TPS3 15. Siemens TPS3 Startup Training 2 Topics Covered  Visual Inspections  Verify environmental requirements are met  TPS3 15.
1 Dayabay RPC Detector Zhang Jiawen Outline  Motivation  RPC introduce  RPC for Daya Bay  Efficiency and noise  Module structure  Module.
Pneumatic Arm Assembly Instructions. Contents of Pneumatic Arm Kit Wooden pieces (⅜” cross-section): 1 X 24”; 1 X 21⅛”; 8 X 7½”; 4 X 7⅛”; 4 X 7”; 2 X.
Plan for MRPC Production Yongjie Sun Center of Particle Science and Technology University of Science and Technology of China.
1 Hybrid & Module Testing Status Week of 6/6-6/10.
CHE/ME 109 Heat Transfer in Electronics LECTURE 7 – EXAMPLES OF CONDUCTION MODELS.
Uses of Energy.
Technology-Assisted Assessment Inquiry Part 1
The Control of Electricity in Circuits
1 SBS Spectrometer / GEP5 Conf.. 2 Tracking Requirements Requirements Tracking Technology DriftMPGDSilicon High Rate: MHz/cm 2 (Front Tracker)
Electronics Miniaturization using Fine-Feature Nanosilver conductors
Chiho Wang ATLAS TRT Duke University CERN, Feb TRT Barrel assembly status & schedule Feb. 9, 2005.
Hydro Electric Generator FEA Analysis Ryan MacTarnaghan Mechanical Engineer Department of Water Resources.
May 2001, Istanbul Workshop High Voltage Plates and Capacitor Status Jack Fowler.
Check Spark Plug Wires. Objectives Student will visually inspect and test with ohmmeter, spark plug wires, evaluate, then recommend if replacement is.
Mechanical Status of EUDET Module Marc Anduze – 05/04/07.
Bakelite surface vs Gap production Evaluation of First samples sent back from Korea Tests and QC of panels presently in GT Evaluation of second set of.
CHAMPS Technology Srl World Leader Manufacturer of INSPECTION MACHINES.
Module mounting. Status Stave 250 received… damaged – Repair now complete (see extras) Friday at 8:30 it will be collected by RAL driver and transported.
Foundations of Agriculture I Mr. DeBord.  Identify the major parts of the finishing sander.  Pass a written test on safety and operating procedures.
Strip Stave cores Stephanie Yang ATLAS upgrade Oxford activities, January 2015.
EUDET JRA3 ECAL in 2007 : towards “The EUDET module” C. de La Taille IN2P3/LAL Orsay.
Atsuhiko Ochi, Kobe University 16/04/2014 MM PCB WG CERN.
Ignition and Electrical System Service Chapter #15.
FMEA.
1 MPW Design Introduction Course - Module 4 Process Description Part II Tyre pressure sensor (SensoNor)
QA/QC in MM SM1 Mod 0 Production at INFN QA/QC MM SM1 Mod 0 - G. Maccarrone 19-Jan
CALICE SiW EcalAboud Falou/ LAL-Orsay Detector SLAB Integration EUDET Prototype Slab cross section, thickness budget Space Frame Ladder {Step.
Quality Control QC is taken very serious QC Document for Tube Production QC Document for Module Assembly QC Document for Installation.
Recent progress in large THGEM production On behalf of Trieste group and Rui de Oliveira (CERN) S. Levorato RD51 mini week1.
DUNE (SP) and SBND TPC Field Cage Designs Bo Yu Brookhaven National Lab.
CPA: Decisions, Issues, Next steps Francesco PIETROPAOLO CERN / INFN-Padova Field Cage CPA and Integration/Installation week, BNL, March 11th, 2016.
Electrostatic FEA of the Ground Plane Features Bo Yu Sept. 14, 2015.
Single Phase ProtoDUNE TPC QA/QC Plans The SP TPC Team Jan. 13, 2016.
QC Procedures of Gaps for RE4 RPCs in Upscope K. S. Lee, S.
Recent Changes to the FD TPC Design Bo Yu Oct. 20, 2015.
Single Phase ProtoDUNE TPC CERN The SP TPC Team Jan. 13, 2016.
MicroBooNE High Voltage System and Feedthrough MicroBooNE Collaboration Meeting Hans Jostlein, December 3,
Electricity & Magnetism Static, Currents, Circuits Magnetic Fields & Electro Magnets Motors & Generators.
1 Status of RPC Construction & Cassette Assembly Qingmin Zhang Argonne National Laboratory
Marc Anduze – EUDET Meeting – PARIS 08/10/07 Mechanical R&D for EUDET module.
SHEET METAL REPAIR & MAINTENANCE
ProtoDUNE High Voltage Design
Summary LBNL LSWG meeting
Quality Control Chamber Production
HO Corrector Magnets: decapole test and future plans
MODULE QUALIFICATION STATUS AT LIVERPOOL
RPC Production at GT A Mass scale RPC Production
First tests on the roll-formed field cage.
ELECTRICAL ENERGY BASED PROCESSES
Infrared Inspection Services in UAE
Cathode plane material selection
Preproduction Status & Results
ELECTRIC DISCHARGE MACHINING
Electricity and Magnetism
LST Module Installation
Discharging Electrically Charged Objects
R F Z D W X C E Y M S V N G T I A L H Q P J O U
Encapsulation Studies
EDLC(Embedded system Development Life Cycle ).
Module Failures on Rods
Limited Streamer Tube Project Summary
Hybrid & Module Testing Status
Hybrid & Module Testing Status
Presentation transcript:

Failure Mode: CPA

Surface Finish ProblemQA (Design)QC (Production) CPA edge tube surface scratches Shipping/handling procedures Visual inspection HV test HV cup surface scratches Shipping/handling procedures Visual inspection HV test Discharge along CPA hanger Design and prototype test HV test 2

Electrical Interconnect Thermal Cycle / After a Spark ProblemQA (Design)QC (Production) Connection between HV cup and HV bus Design and prototype testResistance check thermal cycle HV bus connection between modules Design and prototype testResistance check thermal cycle HV bus connection to the CPA corners Design and prototype testResistance check thermal cycle Connection between tube ends and the resistive tube Design and prototype testResistance check thermal cycle Resistor connection between main sheets and field shaping strips Design and prototype testResistance check thermal cycle Interconnect between neighboring resistive sheets Design and prototype testResistance check thermal cycle 3

Mechanical Problems ProblemQA (Design)QC (Production) Bad rounding radii on mating parts Design and prototype testVisual inspection Fasteners come loose after thermal cycling Design and prototype testThermal cycle Warping of structure after thermal cycling Design and prototype testThermal cycle Delamination of resistive film after thermal cycling Design and prototype testThermal cycle Uneven gap between modules in LAr Design and prototype test Specification 4