Single Phase ProtoDUNE TPC CERN The SP TPC Team Jan. 13, 2016.

Slides:



Advertisements
Similar presentations
Preparation for ATLAS SCT/ID Endcap Completion at CERN Jo Pater Manchester, 4 January 2006.
Advertisements

Sputter Stand Safety Specifics Electrical Hazards High Voltage : Electrical power is required for the high voltage supply, gauging, system controller and.
TPC Proposal for the 35 Ton Liquid Argon Test Abstract We propose to equip the 35 ton cryostat with one APA and two CPA’s, and all the necessary equipment.
Designs of Large Liquid Argon TPCs — from MicroBooNE to LBNE LAr40 Bo Yu Brookhaven National Laboratory On behalf of MicroBooNE and the LBNE LAr Working.
TE-MPE –TM, 16/05/2013, Mateusz Bednarek, TE/MPE-EE ELQA testing during and beyond LS1.
HL-LHC/LARP, QXF Test Facility Workshop– R. Carcagno QXF Test Requirements Ruben Carcagno BNL Workshop December 17, 2013.
ALICE-LHCC Review May 14, 2001 Thomas C. Meyer/EP-AIT1 TPC Field Cage Progress Report Project Schedule Technical Progress & Prototyping Contractual Matters.
09/03/2010 ADO-PO section meeting Beam Pipe Extraction/Insertion R. Vuillermet.
HPD Development Project is DONE! The Future is Quality assurance Database management Alignment Production of cookies and mounts Electronics interfacing.
May 2001, Istanbul Workshop High Voltage Plates and Capacitor Status Jack Fowler.
Installation Review March ‘03 TPC Thomas C. Meyer/EP-AIT 1 Pre-installation and Functional Tests StartFinish  Certification of field cage…………………
TPC Design Concept: From MicroBooNE to LAr20
Chamber construction Construction Tools Production sites Assembly Sequence (“travelers”) Manpower P. Campana LNF – LHCb Muon EDR Cern April 16 th, 2003.
1 Liquid Argon Dark Matter: Synergies with R&D for Neutrino Detectors: Chemically clean Argon for drifting electrons and light output (Oxygen and H20 relevant.
Long Bo for LAPD Hans Jostlein10/20/2011 December 15, 2015 Long Bo for LAPD 1.
Summary of the Electrical Feedthroughs. 2 SFT Channels for the 3x1x1 m 3 N. 6 cold + N. 6 warm on a D=222mm flange (each with 20x68pin connectors)
4-Jan-16S.Movchan Straw manufacturing and QC1 Straw tracker manufacturing procedure Dubna: assembly halls procedure conclusion Presented by S.Movchan.
Production Readiness Review at PNPI Chamber assembling: Main production and quality control steps 30 January 2004 – G.Alkhazov 1.Input components control.
LAr1 Plans at FNAL Bruce Baller - Fermilab. Outline LAGUNA Meeting - Mar  LBNE LAr detector overview  Prototyping plan  1 kton prototype.
Single Module Tests (electrical) Inspect connectors and cables for visible damage C-measurement: make sure all pads are correctly connected HV test (1.5.
CLAS12 Drift Chamber Prototyping
Quality Control QC is taken very serious QC Document for Tube Production QC Document for Module Assembly QC Document for Installation.
CMS Upgrade Workshop, FNAL, Oct 28-30, O.Prokofiev Update ME4/2 Chambers and Tooling A construction of new ME4/2 prototype at CERN Factory tooling,
Status of the PSD upgrade - Status of the PSD cooling and temperature stabilization system - MAPD gain monitoring system - PSD readout upgrade F.Guber,
Upgrade PO M. Tyndel, MIWG Review plans p1 Nov 1 st, CERN Module integration Review – Decision process  Information will be gathered for each concept.
Concept Design for LBNF Far detector (LAr single phase)
Installation of the T600 at Fermilab CSN2, September 22,
CERN – 7 Oct 04 1 LHCb Muon Grounding Anatoli Katchouk CERN Alessandro Balla, Paolo Ciambrone, Maurizio Carletti, Giovanni Corradi, Giulietto Felici, Rosario.
Single phase ProtoDUNE detector installation Plans and Constraints Jack Fowler Duke University 23-Feb-2016.
J. Valls, CMS L2-L3 Meeting, Sept ROD Production at CERN  ROD Flow During Production  ROD Flow at CERN  ROD Testing Areas  Infrastructure  Equipment.
DUNE (SP) and SBND TPC Field Cage Designs Bo Yu Brookhaven National Lab.
AUSTRALIAN NATIONAL UNIVERSITY NUCLEAR PHYSICS DEPARTMENT  14 UD McSNICS ION SOURCE EARTH SAFETY  GASNICS CORONA DISCHARGING ISSUES Gareth Crook.
CPA: Decisions, Issues, Next steps Francesco PIETROPAOLO CERN / INFN-Padova Field Cage CPA and Integration/Installation week, BNL, March 11th, 2016.
Single-Phase ProtoDUNE Construction Planning Jim Stewart LBNC January 11, 2016.
Electrostatic FEA of the Ground Plane Features Bo Yu Sept. 14, 2015.
HGC Cassettes Jim Freeman September 17, Director's Review -- Calorimetry – HGC Cassettes Jim Freeman, 2015 Sept 17.
ProtoDUNE TPC Electrical Design Bo Yu 7-March-2016.
Single Phase ProtoDUNE TPC QA/QC Plans The SP TPC Team Jan. 13, 2016.
Overview of 35ton Phase 2 Detector Bo Yu 35t Installation Readiness Review August 25, 2014.
6-Mar-2016 Dan Wenman | FC Installation 1 APA installation and integration at CERN Shipment of APAs APA handling Acceptance testing Tools needed.
The DUNE 35ton Prototype at Fermilab. DUNE FD ND 1300 km We have learned much about neutrinos in the last 70 years, but there is still much we don’t understand.
FC: Decisions, Issues, Next steps Bo Yu BNL Field Cage CPA and Integration/Installation week, BNL, March 11th, 2016.
Recent Changes to the FD TPC Design Bo Yu Oct. 20, 2015.
Installation of the T600 at Fermilab Fermilab, February 15,
ProtoDUNE SP TPC Summary Bo Yu 12-June APA Design APA design has remained relatively stable since CD1-R 2.3m wide, 6m tall active area, 2560 readout.
Failure Mode: CPA. Surface Finish ProblemQA (Design)QC (Production) CPA edge tube surface scratches Shipping/handling procedures Visual inspection HV.
MicroBooNE High Voltage System and Feedthrough MicroBooNE Collaboration Meeting Hans Jostlein, December 3,
TOTEM CSC construction and Quality Control Status report A.Krivshich Petersburg Nuclear Physics Institute March 07, 2006 CERN.
Kitakami Side AHCAL Assembly or anywhere in any detector.
TPC Support Installation 26 Apr 2016Dan Wenman Mechanical Engineer1 Overview Installation of the support rails Details of the rail from the SAS to the.
WBS 1-7 System Assembly & Installation John Voirin August 10-11, 2011.
Planning for Proto-DUNE PD Installation and Cabling at CERN
ProtoDUNE High Voltage Design
Installation of the T600 at Fermilab
ProtoDUNE - SP SLOW CONTROLS MEETING 11/11/2016 CERN – EP/DT
Pre-installation and Functional Tests
First tests on the roll-formed field cage.
Opening Executive Session M.C.
Answers to Reviewer Questions
Warm structure requirements :
NP04 CPA/FC/HV Interfaces
TPC Field Cage Progress Report
TPC Support and Constraint TPC Support
Arch205 building construction Windows- glazed curtain wall, skylights
Horizontal Installation Overview
HCAL HV splice box.
Undulator System Components Status Dean Walters
Limited Streamer Tube Project Summary
ICARUS Internal Cryogenic Sensors
Presentation transcript:

Single Phase ProtoDUNE TPC CERN The SP TPC Team Jan. 13, 2016

QC Tasks: APAs (6 modules) Task NameWhereLaborEquipment APA frame material tolerance testPSL UK 2 persons 1 week Large flat table APA frame acceptance testPSL UK 3 persons 3 weeks Large flat table, crane, laser tracker Wire tension, pitch measurement (30 sec per wire) PSL UK 2 persons 1 month Tension meter Wire continuity testPSL UK 2 persons 1 month DVM, cable adapter CCR board leakage current test and HV test warm and cold PSL UK 1 person 1 month HV power supply, current meter APA acceptance test with cold electronics in warm and cold (1 day cool down, 1 day test, 1 day warm up) PSL UK 3 persons 1 month Large faraday cage, large cryostat, CE modules + miniDAQ PD integration test: PD insertion, cable connection test PSL UK 1 person 6 days Cable tester, mockup PD module

QC Tasks: 6 CERN Task NameWhereLaborEquipment APA unpacking, acceptance test with cold electronics in CERN to check wire integrity CERN3 persons 2 weeks Large faraday cage, CE modules+miniDAQ APA wire tension spot check: Priority to board boundary wires CERN2 persons x weeks Tension meter The tasks below are deemed to be Installation activities APA integration with full CE moduleCERN APA integration with PDsCERN APA integration with DAQCERN Cold test of fully integrated APAsCERN3 persons 3 weeks Large shielded cryostat, DAQ

QC Tasks: TPC CPAs (~15 modules) Task NameWhereLaborEquipment CPA resistive material acceptance test: measure uniformity of surface resistivity and lamination quality CPA site2 persons 1 week Custom R probe CPA module acceptance test: dimensional tolerance, electrical contact check, surface finish check on tube section CPA site2 persons 3 weeks High -R meter, large flat table CPA module cold test with HV busCPA site2 persons 2 weeks Cryostat, hi-R meter CPA assembly test 2.3m x 6m assembly CPA site3 persons 1 week High ceiling, crane CPA HV test: Testing the CPA edges in air or LAr CPA site2 persons 2 weeks HV power supply, safety cage

QC Tasks: 15 CPA CERN Task NameWhereLaborEquipment CPA unpacking and acceptance tests: Visual inspection of surfaces, electrical contact check, resistivity check CERN2 persons 1 week High-R meter Install PD flasher diffusers on CPAsCERN?

QC Tasks: TPC Field Cage (24 modules, ≥ 6 with ground planes) Task NameWhereLaborEquipment Visual inspection of the metal profiles to identify deep scratches and sharp edges FC site1 person 1 week Cold test the resistors and varistors: Bin the resistors based on their cold resistance, verify the threshold voltage and resistance at operating bias FC site1 person 1 month HV supply, Hi-R meter HV breakdown test of UHMW caps in airFC site1 person 1 week HV supply Continuity test of the field cage/R-dividerFC site2 persons 1 week HV supply Hi-R meter Visual inspection of the ground plane panels to identify sharp edges in perforations. GP site2 persons 1 week HV breakdown test of ground plane in air: HV across a thin air gap, looking for corona GP site2 persons 1 week HV supply HV breakdown test of FC/GP assembly in assembly site (FC/GP could ship separately) FC site?2 persons 1 week HV supply

QC Tasks: 24 TPC Field CERN Task NameWhereLaborEquipment Visual inspection of the assembly for shipping damages, Continuity test of the field cage/R- divider CERN2 persons 1 week HV supply Hi-R meter HV breakdown test of FC/GP assembly in air: If assembled at CERN CERN2 persons 1 week HV supply Beam window integration testCERN2 persons 1 week HV supply cryostat?

QC Tasks: TPC Integration Task NameWhereLaborEquipment TPC installation rail partial assembly with suspension feedthroughs PSL?3 persons 1 month High ceiling, crane 1/3 scale TPC integration trial: 2 APAs, 2 CPAs, 4 horizontal FCAs, 3 vertical FCAs. PSL?5 person 2 months High ceiling, crane, TPC assembly tools

QC Tasks: TPC HV System (1 feedthrough, 1 or 2 filters) Task NameWhereLaborEquipment Test the HV feedthrough in clean argon up to 250kV? HV site2 persons 1 month HV supply, large LAr dewar with purification Measure the HV filter efficiency at the frequency range of interest HV site1 person 2 days High ceiling, crane

Modular Electronics Enclosure Concept These enclosures could make bubble collection in the lower APAs more manageable. ProtoDUNE Cryostat Design Review Dec 17-18, This concept is developed to allow access to both sides of the readout electronics from one side of the TPC