New Energy Centre at Megawatt Park 15 April 2014.

Slides:



Advertisements
Similar presentations
Loft Conversions - The building regulations Chris Wigley MD London Building Control Ltd
Advertisements

Facilities Management and Design Chapter 4 Safety and Security systems.
Ensuring Fire Compliance An Action Plan Clive Reilly Checkmate Fire Solutions.
Assessed to ISO 9001 Certificate No. 1038Ha. SPECIFICATIONS FIRE HOSE REEL CABINET The wall opening for recessed cabinets should be of 1cm additional.
Safety Training Safety First. EXITS All exit doors shall be maintained in operable condition. Exit doors shall not be locked, chained, bolted, barred,
Aspirated Smoke Detection
KURSUS PENGENALAN KEPADA PERKHIDMATAN MEKANIKAL DALAM BANGUNAN
1 INTRUSION ALARM TECHNOLOGY NOTIFICATION DEVICES.
Ted “Smitty” Smith  I have included in the following slides some key sections from each of the codes you will primarily encounter on the test. I recommend.
Cancer Center Training 2012 Cancer Center Training 2012 “Defend in Place” Strategy for Fire Alarm Activations Cancer Center Building #7559.
Basic Fire Alarm Systems Overview
Texas Department of Insurance State Fire Marshall’s Office Sixth Report on State University Fire Safety January 2002.
Prevent False Alarms Eugene A. Cable, P.E., M.S.F.P.E. Life Safety Consultants NEHES Honorary Member 412 Horse Heaven Road Averill Park, New York
2012 International Fire Code Adopted as the minimum fire safety standard by the State of Wyoming City of Sheridan must adopt the minimum standard to retain.
AGENDA INTRODUCTION CELLS AND COMPONENTS PV PERFORMANCE PV APPLICATIONS CODES AND STANDARDS EMERGENCY RESPONSE.
FALAR Part 3 – Post Construction  Compilation of  Maintenance records of fire protection/life safety equipment  Test records of fire protection/life.
Security Devices A modern security system, with its array of electronic components, is designed to sense, decide, and act. The security system senses events.
How to pass the test Stephen Shorrocks David Starr.
INTRUSION ALARM TECHNOLOGY
Activated by the control panel, it gives a loud audio signal to alert that an intrusion has occurred.
Fire Detection Presentation
Road Map to a Green Tag Paperwork=Time=Money. Questionnaire If you could change any one major thing inside the Fire Community Services process what would.
Business Owners and Managers and the Fire Code
INTRUSION ALARM TECHNOLOGY

Commissioning of Fire Protection and Life Safety Systems Presented by: Charles Kilfoil Bechtel National Waste Treatment Plant Richland WA.
Merseyside Fire and Rescue Service Fire Safety Inspections.
International Fire Door Inspector Association Presents New Annual Fire Door Inspections NFPA 80 – 2007, 2010, 2013 Standard for Fire Doors and Other Opening.
An Introduction to the R3 19 inch Rack The R3 control system comprises a number of different plug in modules, each of which is dedicated to a particular.
HE UTTAR PRADESH FIRE PREVENTION AND FIRE SAFETY RULES 2005
CLIC CES Meeting 14 jan 2009 A resume table for fire safety in LHC, and a possible scheme for other machine – part 1 CERN –SC Fabio Corsanego.
Lift Typical Building Floor Plan. Complete with fire walls. Click on and we will add Some of the different Passive and Active systems that you could come.
1 CXS490 - Pre-Engineered Fire Protection Systems Off-Road Vehicle Systems.
No content in the brand signature area No content in this area CYAN RGB= 000,153,255 DARK GREY RGB= 075,087,095 DRAKA BLUE RGB= 000,051,153 DRAKA Colors.
ID 308 Construction + Materials IV: Construction Documents Prof. Brody Endicott College Systems Coordination.
Fire No institution is immune from fire. Flood damage can be dried out and restored, stolen property has a chance of being recovered; damage from fire.
Chapter 5 ID 234 Building Codes Fire Resistant Materials and Assemblies.
code calculations, construction drawings
Fire Detection System General Locations and Operation.
Presented by John Lewandowski and Mike Larabel Inspection, Testing, and Maintenance of Kitchen Hood Systems Michigan Fire Inspectors Society Winter Educational.
The purpose of installing fire fighting equipments is to protect the public, property, and assets in fire emergency. Manufacturers of fire protection.
KEK, 04/28/061 Safety Plan Assumptions Break out of fire in the Beam Tunnel is negligible Cables in the Service Tunnel is main fire load They are combustible.
1 Fire Protection and Fire Stopping. 2 Module 7 - Firestopping and Comprehensive Fire Prevention Systems Identify the elements of a comprehensive fire.
Safety Rule #1 Open flames are not allowed without first obtaining a permit. The exception to this rule is during a period of closely supervised instructions,
Fire Protection Systems Chapter 9 IBC 9th Edition Amendments
Civil Courthouse 201 Caroline
Family Law Center 1115 Congress
Safety and Prevention of Typical Fire Plan
FIRE PROTECTION & SECURITY in ELI Beamlines
Enclosed Parking Ventilation 1 EK Engineering (India) CO/NO2 detection, Fan Control and automation System E: Mobile:
What Library Staff Should Know About Fire Safety
Fire Alarm Systems for Emergency Operations of Elevators
NICET Fire Alarm Tech Level 1 Practice Test # 6
Feature Benefit Feature Benefit Feature Benefit Feature Benefit
Fire Safety for MSO, Residents, Medical Students and Nursing Students
Juvenile Justice Center 1200 Congress
Fire Safety for MSO, Residents, Medical Students and Nursing Students
AGENDA INTRODUCTION CELLS AND COMPONENTS PV PERFORMANCE
NICET Fire Alarm Tech Level 1 Practice Test # 10
Learning Outcome 4 Understand the types, applications and limitations of wiring systems and associated equipment This presentation looks at emergency management.
Firefighting equipment
Fire Alarm Tech Practice Test # 16 NICET
AGENDA INTRODUCTION CELLS AND COMPONENTS PV PERFORMANCE
Home Safety and Security
Fire Safety Training 1.
Criminal Justice Center 1201 Franklin
Fire Alarm Practice Drill # 11 Denver Fire Department Journeyman Installer License Test © Ted Smith 2017.
ENGINEERING PERFORMANCE STANDARD
Fire Protection Documentation
Fire Evacuation Procedures
Presentation transcript:

New Energy Centre at Megawatt Park 15 April 2014

2016/07/082 Fire Engineering The following fire systems will be installed into the new Energy Centre : Smoke Detection Fire Fighting Equipment Symbolic Fire Signs Fire Sealing

2016/07/083 Fire Engineering

2016/07/084 Fire Engineering SMOKE DETECTION SYSTEM The new Ziton smoke detection system will be installed throughout the new Energy Room with a new control panel which is linked backed to the main smoke detection control panel in the existing Megawatt Park Control Room This system will consist of smoke detectors, manual break glass units, audible sirens and red strobe / flashing lights All wiring for this system to be done in PH30 fire rated cable which is housed in Bosal galvanised conduit.

2016/07/085 Fire Engineering Line relay / interface units shall be installed to : o Shut down the air-conditioning system within the respective fire zone o Sound the fire alarm with visible red strobe lights These interface units shall react from a “double knock” signal from smoke detectors and / or manual fire alarm break glass units All devices and control panels shall be the addressable type This system shall comply with the specifications detailed in the Code of Practice SANS 10139

2016/07/086 Fire Engineering Addressable Smoke Detector Addressable Manual Fire Alarm Call Point 2 Loop Addressable Fire Alarm Panel Red Addressable Horn Sounder

2016/07/087 Fire Engineering

2016/07/088 Fire Engineering FIRE FIGHTING EQUIPMENT New 30 metre hosereels and portable fire extinguishers which are mounted onto wooden backing boards shall be installed throughout the new Energy Centre 5kg Carbon Dioxide and 9kg Dry Chemical Powder fire extinguishers shall be installed This installation shall be designed and installed in accordance with the National Building Regulations SANS : 2011

2016/07/089 Fire Engineering 30 metre Hosereel Nozzle to hosereel 5kg Carbon Dioxide Fire Extinguisher 9kg Dry Chemical Powder Fire Extinguisher

2016/07/0810 Fire Engineering SYMBOLIC FIRE SIGNS New photoluminescent ‘glow in the dark’ symbolic signs which are mounted in Eskom Corporate Gold powder coated frames shall be installed to clearly indicate the positions of the fire equipment, fire escape routes and exit doors (Paint code : Pantone 8004 C; Process : 40C 40M 55Y 5K) All wall mounted signs to be concealed screw fixed and any hanging signs to be supported from steel cables This installation shall comply with SANS 1186 : Part 1 and 5. All signs to include name of manufacturer and SABS permit number

2016/07/0811 Fire Engineering Sample of signs :

2016/07/0812 Fire Engineering FIRE SEALING All service pipes, conduits, sleeves, cables, A/C ducting or other equipment that penetrates through any floor or fire wall shall be fire stopped by an approved fire retardant sealer to achieve a 60 minute fire rating

2016/07/0813 Fire Engineering FIRE DEPARTMENT SUBMISSION The fire protection plans of the new Energy Centre will be submitted to the City of Johannesburg Fire Department for approval before construction commences On completion of this project, the Fire Department will witness all fire commissioning tests and conduct an inspection of all fire installations in order to issue a fire clearance certificate for this building

2016/07/0814 Fire Engineering Thank you