RTWG Report to TAC January 6, 2010 Henry Durrwachter.

Slides:



Advertisements
Similar presentations
NARUC The 21 st Century Grid 1 Energy Consumption Ancillary Services Traditional Power Generation Solar Generation Commercial and Industrial Transmission.
Advertisements

Connection of Wind Farms to Weak AC networks – ERCOT Experience and Challenges Shun-Hsien (Fred) Huang ERCOT System Planning CIGRE WG B4.62 Meeting June.
2009 On-Farm Renewable Energy Production Survey February 25, 2011.
System Strength Discussion
Study of Using Induction Generator in Wind Energy Applications
1 RTWG Report to TAC October 1, 2009 Henry Durrwachter.
Warren Lasher Director, System Planning October 4, 2014 Our Energy Future.
1 Update to RMS February 03, January Meeting Update RMGRR126, Additional ERCOT Validations for Customer Billing Contact Information File RMGRR128,Reinstate.
Thomas DEGNER -DE- BETA SESSION 4b: Integration of RES+DG Barcelona May DISPOWER Distributed Generation with High Penetration of Renewable.
RTWG Report to TAC August 5, 2010 Howard Daniels.
1 Renewable Technology Working Group (RTWG) July 14, 2009 Henry Durrwachter.
Texas Wind Energy American Meteorological Society Summer Community Meeting – Norman Oklahoma Henry Durrwachter, P.E. August 12, 2009.
Lead from the front Texas Nodal 1 Texas Nodal Energy Management System Requirement Documents December 5, 2006 Jay Dondeti EMS Project.
VRT Study Update José Conto ERCOT System Planning.
August 30, 2012 Modeling Solar, Storage and Inverter based resources John Adams Resource Integration Planning Working Group.
1 Distributive Generation Wind Landfill Solar Fuel CellMicro-Turbine.
Transmission Outage Process April Purpose In compliance with the Protocols and the Electric Reliability Council of Texas (ERCOT) Operating Guides,
What do we mean by “Energy?
Generation Adequacy Task Force Update to WMS November 18, 2009.
Electric Reliability Council of Texas (ERCOT) A Success Story… In Progress Ingmar Sterzing United States Association of Energy Economics (USAEE) Pittsburgh.
PDCWG Report to ROS January 14, 2010 Sydney Niemeyer.
Hierarchy of Texas Laws and Rules The Texas Legislature passed Senate Bill 7 in 1999, which amended the Public Utility Regulatory Act (PURA) and restructured.
File: ERCOT DREAM TF Slide 1 DREAM TF Distribution Energy Market IDEAS_distribution_energy_market_draft1 IDEAS_distribution_energy_market_draft1.
ERCOT TAC11/2/ CREZ Study Update ERCOT TAC 11/2/2006.
Large-Scale Renewable Energy: The Top Challenges Dick Kelly Chairman, President and CEO EPRI 2008 Summer Session August 4, 2008 Dick Kelly Chairman, President.
Protocol Revision Subcommittee Rob Bevill January 5, 2012.
1 RTWG Report to TAC June 4, 2009 Henry Durrwachter.
TX SET Update to RMS Wednesday, May 9, Elimination of the Drop to AREP o RULEMAKING TO AMEND COMMISSION SUBSTANTIVE RULES CONSISTENT WITH §25.43,
Panhandle Renewable Energy Zone (PREZ) Study
Wind Turbine Power Plant. Sources ●
AN ARCHITECTURE FOR LOCAL ENERGY GENERATION, DISTRIBUTION, AND SHARING Mike M. He, Evan M. Reutzel, Xiaofan Jiang, Randy H. Katz, Seth R. Sanders, David.
ERCOT MARKET EDUCATION Retail 101. Market Rules Overview Topics in this lesson...  Introduction to Market Rules Public Utility Regulatory Act PUCT Substantive.
Long Term Transmission Integration Planning at the California ISO Intermittency Analysis Project (IAP) Energy Commission Staff Workshop February 13, 2007.
PLWG Report to RPG January 21, 2014 Presented by John Moore, PLWG Chair.
Update to RMS February 2, 2016 TX SET. Texas SET January Meeting Update Elections – Chair: Diana Rehfeldt, TNMP – Vice Chair: Kyle Patrick, NRG TMTP Changes.
Wind Energy CLAY GREGG. WET The wind industry is a young green energy industry It grows by at least two percent each year Wind power is a tiny segment.
Impact of not including proposed generators lacking RARF data in the planning models Planning Guide Section 6.9 Issues February 17, 2016.
Renewable Technology Working Group (RTWG) Report to TAC February 4, 2010 Henry Durrwachter.
What is a renewable energy resource? By: Harley Marcum.
1 RMS Update to RMWG June 6, Market Process for Solar & Wind Devices Retail customers are purchasing and installing wind and solar equipment on.
Workshop February 4, Idaho Power Smart Grid Vision At Idaho Power, our smart grid vision remains focused on seven major characteristics : 1.Enhance.
PGE Strategy for Oregon’s Energy Future Empowering customers Energy efficiency Smart meters Distributed generation Diverse power supply Maintain and make.
ERCOT Bylaws Changes for Regional Entity
SCE Energy Storage Perspective
Developing Renewable Technologies
Compliance Report to ERCOT BOD December 2006
TAC Report to the ERCOT Board
EAS Lessons Learned Summary
The National Grid Mains electricity is produced by ______________.
Technical Advisory Committee
Solar Farm Operational Procedures SWEDE 2017
Oncor Electric Delivery Company LLC
Use other resources to generate electricity
Minnesota Power Renewable Energy (& Engineering) for the 21st Century
Dr. Y F KWOK Electrical and Mechanical Services Dept.
Renewable Energy Daniel Burmester.
WIND TURBINE GENERATORS.
H.O.M.E. Home Organization and Monitoring of Energy
Hawaiian Electric Company quickly expands conservation offerings with Verizon Grid Wide. Business challenges The Hawaii Public Utilities Commission.
Karen Bartleson, President, IEEE Standards Association
Integrating Variable Renewable Energy in Seychelles and Mauritius
Electricity Demand Response and Advanced Metering for Integrated Utilities Arkansas Public Service Commission Lonni Dieck AEP May 24, 2007.
Sustainability Action Plans and Review
Power Generators EE 205, 121 Mohammed Al-Qahtani
Beth Soholt Director Wind on the Wires
Microgrid Converter Modeling and Control
Greece-Group D.
Oregon Energy Plan As of April 2005.
Renewable Resource Business Proposal
Community Solar Policies and Programs
Presentation transcript:

RTWG Report to TAC January 6, 2010 Henry Durrwachter

RTWG Meeting December 7, 2009 Presentation on Electric Energy Storage (EES) technologies focused on potential applications in ERCOT by Dr. Rahul Walawalkar, Customized Energy Solutions Updated Issues List –Identified 4 completed issues MD - 8 (Reactive and Voltage Requirements Applicable to Wind Generators) SO - 9 (SCADA Control of Generator Circuit Breakers) SO - 15 (Communications between Wind Farms and TSPs) SO - 28 (SPS Actuation for N-0 Conditions) –Added one new issue (SP - 9: Wind Turbine Model Validation)

Work Plan for 2010 Complete Texas Renewables Implementation Plan (TRIP) documentation (February) Quarterly TRIP Updates for ERCOT Board and Public Utility Commission of Texas Focus on: –solar technology integration issues –potential Protocol and Operating Guide changes related to solar technologies –potential applications for storage and associated Protocol and Operating Guide changes

Questions?