Renewable Technology Working Group (RTWG) Report to TAC February 4, 2010 Henry Durrwachter.

Slides:



Advertisements
Similar presentations
Connection of Wind Farms to Weak AC networks – ERCOT Experience and Challenges Shun-Hsien (Fred) Huang ERCOT System Planning CIGRE WG B4.62 Meeting June.
Advertisements

Economic Criteria for Transmission Planning in the ERCOT Region Public Utility Law Seminar DeAnn Walker August 3, 2012.
Chubaka Producciones Presenta :.
2012 JANUARY Sun Mon Tue Wed Thu Fri Sat
P Pathophysiology Calendar. SundayMondayTuesdayWednesdayThursdayFridaySaturday January 2012.
1 RTWG Report to TAC October 1, 2009 Henry Durrwachter.
1 TSP Nodal Engagement Market Participant Call ERCOT August 04, 2010.
RTWG Report to TAC August 5, 2010 Howard Daniels.
1 Renewable Technology Working Group (RTWG) July 14, 2009 Henry Durrwachter.
November 10, 2009 NOIE DRG Settlements TF update to COPS Settlement Discussion for ALL DG < or = 1 MW Don Tucker on behalf of the NOIE DRG Settlements.
1 Review of Aging Projects Additional Materials July 16, 2015.
Engineering a sustainable future 1 ERCOT Voltage Ride-Through Study Workshop June 26 th, 2009.
Texas Wind Energy American Meteorological Society Summer Community Meeting – Norman Oklahoma Henry Durrwachter, P.E. August 12, 2009.
Texas Regional Entity Compliance Report Board of Directors May 19, 2009.
1 Compliance Update May Control Performance Highlights  NERC CPS1 Performance Performance further declined in March  March performance comparison.
A Strawman for Discussion by Dottie Stockstill & Greg Ramon Special ERCOT Board Meeting June 24, 2003.
Report to TAC August In Brief Working Group Reports Working Group Reports CMWG CMWG DSWG (No report) DSWG (No report) MCWG MCWG MWG (No report)
Profiling Working Group 1 PWG Update Report By Ernie Podraza of Direct Energy ERCOT PWG Chair Ed Echols Of Oncor ERCOT PWG Vice Chair for COPS Meeting.
WORD JUMBLE. Months of the year Word in jumbled form e r r f b u y a Word in jumbled form e r r f b u y a february Click for the answer Next Question.
September 2008 SundayMondayTuesdayWednesdayThursdayFridaySaturday
December 18, 2014 Technical Advisory Committee (TAC) Update to RMS Kathy Scott January 6, 2015 TAC Update to RMS 1.
DATE POWER 2 INCOME JANUARY 100member X 25.00P2, FEBRUARY 200member X 25.00P5, MARCH 400member X 25.00P10, APRIL 800member.
Analysis of ERCOT Regulation Service Deployments during 2011 David Maggio Market Enhancement Task Force Meeting 3/29/
Final Report on Fast Responding Regulation Service (FRRS) Pilot Project TAC March 27th, 2014.
Electric Reliability Council of Texas (ERCOT) A Success Story… In Progress Ingmar Sterzing United States Association of Energy Economics (USAEE) Pittsburgh.
2011 Calendar Important Dates/Events/Homework. SunSatFriThursWedTuesMon January
QMWG Update to WMS S. Looney October 9, WMS Assignments NPRR564, Thirty-Minute Emergency Response Service – Discuss concerns expressed at last WMS.
Report to TAC July In Brief Working Group Reports Working Group Reports CMWG CMWG DSWG DSWG MCWG MCWG MWG MWG QMWG QMWG VCWG VCWG Task Forces Task.
PDCWG Report to ROS March 11, 2010 Sydney Niemeyer.
ERCOT PUBLIC November RPG Meeting RTP – Study Scope November 20, 2015.
1 RTWG Report to TAC June 4, 2009 Henry Durrwachter.
Lead from the front Texas Nodal 1 High-Level Overview of draft NPRR implementing PUCT Rule Posting Requirements January 8,
Wind Operations Task Force Overview for ROS Feb 2009 mtg: WOTF has drafted a scope for ROS to consider. WOTF recommendations for Chair & Vice Chair: Chair.
TEMPORAL VISUALIZATION OF DATA FROM THE FRENCH SENTINEL NETWORK.
PRR 525 Update Prepared by ERCOT Compliance December 2005.
QSE Managers Working Group Meeting Notes November 10, 2009 Report to WMS November 18, 2009 Jennifer Troutman – Vice Chair.
Transition Plan Network Operations Model Change Requests 5/26/2010.
July 2007 SundayMondayTuesdayWednesdayThursdayFridaySaturday
1 Credit Parameters Review TAC July 2, Protocol Section , “Credit Requirement for DAM Bids and Offers” specifies: Credit Requirement for.
Congestion Management Work Group 2008 Overview CMWG Marguerite Wagner, Reliant Energy Inc.
Draft NPRR Weather Sensitive ERS Loads December 2012.
Wind Operations Task Force Overview for ROS Jan 2009 mtg: WOTF is continuing work on issues #1a/b/c, 1d, 3e, and 5. The WOTF makes no recommendation to.
October 15, 2012 PV & Storage Workshop ERCOT’s Interconnection Process John Adams Principal Engineer.
RTWG Report to TAC January 6, 2010 Henry Durrwachter.
Retail Market Update November 6, Flight Time Lines Retail market has several market occurring in the second quarter Flight 0304, GISB.
Principal Load Profiling and Modeling
CSC DETERMINATION PROCESS
Compliance Report to ERCOT BOD December 2006
August 25, 2016 TAC Update to COPS
Director, Transmission Services
Technical Advisory Committee
Generation Adequacy Task Force Update to WMS
Oncor Electric Delivery Company LLC
Compliance Report to ERCOT TAC February 2007
Dictation practice 2nd Form Ms. Micaela-Ms. Verónica.
McDonald’s Kalender 2009.
McDonald’s Kalender 2009.
Out of Region Market Assumptions
Logo Calendar – January 2012 TO DO LIST 01/04/2012 Example TO DO LIST
McDonald’s Kalender 2009.
2300 (11PM) September 21 Blue line is meridian..
McDonald’s calendar 2007.
2018 RTEP Report Key Maps, Tables & Figures
February 2007 Note: Source:.
McDonald’s calendar 2007.
Production Month Sun Hours K Monthly Kwh Tou Peak Value After Kwh
Habitat Changes and Fish Migration
2015 January February March April May June July August September
Habitat Changes and Fish Migration
Presentation transcript:

Renewable Technology Working Group (RTWG) Report to TAC February 4, 2010 Henry Durrwachter

January RTWG Meeting Reviewed 4 th Quarter TRIP Report Lively discussion on potential changes in the Texas Renewables Implementation Plan (TRIP) –Revised draft to be reviewed at next RTWG meeting –Revised TRIP to TAC in March for review and approval Discussed 2010 Work Plan

4 th Quarter TRIP Highlights Installed wind generation capacity in ERCOT at December 31, 2009 = 8,916 MW The following new wind generation was added in the 4 th Quarter of 2009: –Langford Wind Power 150 MW (Tom Green County) –Loraine Wind Park I 126 MW (Mitchell County) –Loraine Wind Park II 125 MW (Mitchell County) Total new wind generation capacity in ERCOT increased from 8,515 MW to 8,916 MW, an increase of 401 MW from the last report. One wind farm signed Generation Interconnect Agreements since the last report: –Paplote Creek Wind Farm II 198 MW (San Patricio County)

Installed Wind Generation Capacity in ERCOT

4 th Quarter TRIP Highlights Significant Issues: –In November, the ERCOT Board approved PRR Reactive Power Capability Requirement, which has been appealed to the PUCT –In December, the PUCT issued a “strawman” rulemaking for the 500 MW non-wind Renewable Portfolio Standard (RPS)

4 th Quarter TRIP Highlights Completed Issues: –MD-8: Reactive and Voltage Requirements Applicable to Wind Generators –SO-9: SCADA Control of Generator Circuit Breakers –SO-15: Communications between Wind Farms and TSPs –SO-28: SPS Actuation for N-0 Conditions –WT-2: Wind Workshop III - Summer 2009 –WT-4: Wind in the Nodal Market

4 th Quarter TRIP Highlights Completed PRRs/NPRRs: –PRR Primary Frequency Response from WGRs –PRR Reactive Power Capability Requirement –NPRR Removal of McCamey Congestion Management from Nodal Protocols New Issue: SP 9 - Wind Turbine Model Validation

Wind Statistics

ERCOT Wind Generation Facts 2009 Annual average capacity factor = 24.4% Capacity value of wind (as a % of installed capacity) –At the peak hour (July 13, HE1700) = 18.4% –During the 4 monthly summer peak load hours (June-Sept.) = 9.2%. –For all hours in the 4 summer months = 19.8% Minimum hourly wind production was 14 MW on September 11, HE1000. Maximum hourly wind production was 5,986 MW on October 28, HE Highest percentage of load served by wind was 24.6 % on October 28, HE Maximum 1-hour increase in wind generation was 2,136 MW on October 25 from 6 to 7 PM. Maximum 1-hour decrease in wind generation was 1,820 MW on June 3 from 2 to 3 AM. This is the first year that there has been wind generation in every hour of the year. Source: ERCOT

Wind Statistics

Questions?