Group 16 Ian Bray Aodhin Mc Bride John McElwee. Background Collapsed January 18 th 1978 – 5 years after construction Large snowstorm caused heavy loading.

Slides:



Advertisements
Similar presentations
Appreciation of Loads and Roof Truss Design
Advertisements

Design of Seismic-Resistant Steel Building Structures
Bracing Configurations
Introduction to Lateral Force Resisting Systems
Engineering Terms Engineers design all structures with enough strength to withstand the force and load that will be placed upon them. Generally loads are.
A World of Solutions TM Falgout Canal Floodgate Structure Unbalanced Forces and Proposed Solutions October 2013.
Structural Bracings Presentation by V. G. Abhyankar
LAYOUT OF STEEL STRUCTURES
Rigid-Frame Structures
Main Functions of Buildings 4 Provide a safe and comfortable environment for work and rest. (Protect us from wind, rain and the wild animals) 4 Two types.
Modeling for Analysis CE Design of Multi-Story Structures
CEA UNIT 3 TERMS & DEFINITIONS. BEAM A structural member, usually horizontal, that carries a load that is applied transverse to its length.
LRFD-Steel Design Dr. Ali Tayeh Second Semester
Design of Tension Members
Connections and Bracing Configurations
Design of Tension Members
COMPOSITE BEAMS-II ©Teaching Resource in Design of Steel Structures –
1 Design and drawing of RC Structures CV61 Dr. G.S.Suresh Civil Engineering Department The National Institute of Engineering Mysore Mob:
Reinforced Concrete VS Steel
The Paper River Chasm Project Team Canada ME104Q University of Rochester The Paper River Chasm is an opening that extends 8.5” over the Paper River. Several.
Cables. Principal Elements for practical suspension systems Vertical supports or towers Main cables Anchorages Stabilizers.
Approximate Analysis of Statically Indeterminate Structures
CTC / MTC 222 Strength of Materials
COLUMNS.
DESIGN OF TRUSS ROOF Chapter 7
Stresses Found In Structural Members. Forces Acting Simply Supported Beam 1.Bending.
Class Day Fourteen Class Day Fourteen. Chapter 10 Masonry Load bearing Wall Construction.
Chapter 6 Plate girder.
Lecture 5 January 31,  Sudhir K. Jain, IIT Kanpur E-Course on Seismic Design of Tanks/ January 2006 Lecture 5/ Slide 2 In this Lecture Impulsive.
Wind Turbine Support Structure
1 Presented by the Wood Truss Council of America.
ERT352 FARM STRUCTURES TRUSS DESIGN
Wind Turbine Support Structure Benjamin Boyett ET 493 Senior Design I Advisor – Dr Mohamed Zeidan Instructor - Dr. Cris Koutsougeras 05/09/2014.
7. APPROXIMATE ANALYSIS OF INDETERMINATE STRUCTURES
Duquesne University Forbes Expansion
Building Fun You will have 30 minutes to build the strongest structures you can with only the materials you are provided with. Explain to the class the.
STRUCTURAL ENGINEERING. What Does a Structural Engineer Do?
Third Avenue NY, New York Michelle L. Mentzer Structural Option.
Structural Engineering
Day 20 PRECAST AND PRE-STRESSED CONCRETE Pre Cast concrete comprise units that are made under controlled conditions, with necessary preparations for.
Presented by the Wood Truss Council of America
Hartford Civic Arena Roof Collapse
H ARTFORD C IVIC C ENTRE A RENA R OOF C OLLAPSE..
Mechanics of Materials(ME-294) Mechanics is the branch of physics that is concerned with the analysis of the action of forces on matter or material systems.
Justin Purcell Structural Option Advisor: Dr. Hanagan.
Earthquake Resistant Building designs. Buildings are designed to withstand vertical forces. Buildings are designed to withstand vertical forces. If earthquakes.
Milford Haven Bridge Collapse Cathal Kennedy Terence Meade Sara Farivarz Padraig O’Rourke.
1 Wardenier “Tubular Structures Course” Examples Hollow Section Trusses Design Procedure.
BFC (Mechanics of Materials) Chapter 7: Statically Determinate Plane Trusses Shahrul Niza Mokhatar
“Silver Bridge”, Point Pleasant, West Virginia. On December 15,1967 at approximately 5 p.m., the U.S. Highway 35 bridge connecting Point Pleasant, West.
Structures What things do I need to find out in order to predict if what I design will stand up to the use I intend to put it through?
Kansas City Hyatt Regency Walkway Collapse By: Ian Thompson Stephen Conlon David Martin Laura Devane.
Warm cryostat mechanical calculations A.Catinaccio PH-DT Engineering Office, CERN Page 1 CERN, May 27th 2015.
Hartford Arena Roof Collapse.  January 18th  Snowstorm.  Roof plummeted 83 feet to the arena floor.  What caused the 300-x 360ft. roof to collapse?
Airplane Hangar Design The design of a steel-framed airplane hangar Matthew Klein Edward F. Cross School of Engineering, Walla Walla University, College.
INTRODUCTION Due to Industrial revolution metro cities are getting very thickly populated and availability of land goes on decreasing. Due to which multistory.
Use of Resilient Channel or Hat Channel to Meet the Lateral Restraint/Bracing Requirements of the Bottom Chords of MPCWT Floor Systems Overview Revised.
Long Span Truss Installation
ERT352 FARM STRUCTURES TRUSS DESIGN
10 Columns.
Chapter-2 Parts of Steel Bridges.
Engineering Mechanics (17ME1001)
Wood Structures Topic 8 Quality Workmanship
DESIGN OF TRUSS ROOF Chapter 7
Progressive Collapse Resistant Design of Structures
DEFINITION OF TALL BUILDINGS From the structural design point of view, it is simpler to consider a building as tall when its structural analyses and.
سیستم های ساختمانی پیشرفته (2)
10 Columns.
Floor Truss Ribbon Board Load Path
Engineering Terms Engineers design all structures with enough strength to withstand the force and load that will be placed upon them. Generally loads are.
Presentation transcript:

Group 16 Ian Bray Aodhin Mc Bride John McElwee

Background Collapsed January 18 th 1978 – 5 years after construction Large snowstorm caused heavy loading Arena was not in use when roof collapsed No injuries or fatalities

Structural Design Fraoli, Blum & Yesselman, Engineers were employed to design arena. Engineers used innovative space frame design. Roof spanned 91.44m x m and at a height of 25.29m above the ground.

How was it different? The top layer of this roof did not support the roofing panels. The top horizontal bars did not intersect at the same points Four pylon legs supported the roof. The configuration of the four steel angles did not provide a good resistance to buckling.

Saving money and time... used of a state-of-the-art computer analysis to verify the safety of the building. The architect had tried twice to convince the owners to hire a qualified structural engineer for continuous on- site inspection. roof frame was completely assembled on the ground.

Warnings of Failure Excessive deflections were noticed on numerous occasions Inspection company Subcontractor Member of the public Each one was ignored

Construction Design allowable force ≠ built allowable force Mid point bracing omitted for top layer rods Spacing was double the designed amount Top bars experienced buckling as a result

Collapse Unexpected amount of snow Members of top truss buckled Resulted in all members buckling and structural collapse

Conclusion Overconfidence in Computer Analysis Roof design extremely susceptible to buckling- not analysed by computer Cut costs but at the expense of the structures stability Connections not assembled according to design No responsibility taken by contractor towards the performance of the project

Project Management No overall responsibility for the project No structural engineer hired to inspect the roof frame and connections Subcontractor questioned deflections as it was difficult to connect steel frame, “Deal with the problem or be responsible for delays” A year later, a member of public notified the engineer of his concern at the obvious downward deflection of the roof but was assured, “Everything is fine”

Recommendations The computer is only an analytical tool and it is always a good idea to inspect the building against the design criteria If the horizontal and diagonal members intersected at the same place it would have reduced the bending stresses in these members The structure should have been built with more redundancy so the failure of a few members would not cause such a catastrophic collapse

Recommendations (cont.) The responsibility of the architects, engineers and construction manager should be well defined There should be one person who ultimately is responsible for the success of the project as a whole. One should re-check design calculations when deformations occur Independent checks on design calculations should be enforced

References Rachel Martin, Case study “Hartford Civic Centre Arena Roof Collapse” J. Perf. Constr. Fac. Volume 15, Issue 1, pp (February 2001) ‘Another Look at Hartford Civic Center Coliseum Collapse’. “Structural safety and its quality assurance” By Bruce Ellingwood, Council on Tall Buildings and Urban Habitat. Committee 9A/10, Structural Engineering Institute