2021 Adequacy Assessment Data Requirements Resource Adequacy Advisory Committee Technical Committee Meeting March 18, 2016.

Slides:



Advertisements
Similar presentations
Hydro Peaking Capacity Analysis & Northwest Regional Forecast Comparison Resource Adequacy Technical Committee July 28, 2010.
Advertisements

CVP Cost Allocation Public Workshop – January 18, 2013 “PLEXOS Methodology and Assumptions”
Technical Conference Avoided Cost Modeling January 6, 2015.
Power Supply Adequacy Assessment Model/Methodology Review Steering Subcommittee Meeting January 29, 2010.
Preliminary Review of July 24 th Extreme Temperature Event & Implications for Pilot Capacity Standard Mary Johannis & Wally Gibson PNW Resource Adequacy.
Resource Adequacy Forum 2019 Adequacy Assessment Overview PNGC Offices June 28, 2013.
Genesys Model Enhancements October 4, 2011 NW Resource Adequacy Steering Committee Meeting Gwendolyn S Shearer.
Jim Mcintosh Director, Executive Operations Advisor California ISO Independent Energy Producers 2011 Annual Meeting - October 5, 2011 Stanford Sierra Conference.
Utah Schedule 37 Update June 25, Schedule 37 Background Schedule 37 – Published rates for standard power purchase agreements with qualifying facilities.
Joel Koepke, P.E. ERCOT Operations Support Engineer ERCOT Experiences During Summer 2011.
Draft Avoided Cost Forecast and Marginal CO 2 Offset Value of Conservation Regional Technical Forum Maury Galbraith Northwest Power and Conservation Council.
NW Resource Adequacy Forum Steering Committee Conference Call November 4, 2010.
ETAAC Energy Sector Energy Storage Smart Grid July 12, 2007 San Francisco, CA.
A Resource Adequacy Standard for the Pacific Northwest Resource Adequacy Technical Committee January 17, 2008 Portland Airport.
Sixth Northwest Conservation & Electric Power Plan Adding Incremental Flexibility to the Pacific Northwest Power System? Maury Galbraith Northwest Power.
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N 2009 Draft Resource Program Released: September 30, 2009 Accepting Comments until: November 30,
Adequacy Assessment for the 2017 Pacific Northwest Power Supply Steering Committee Meeting October 26, 2012 Portland, Oregon 1.
Revising the Pacific Northwest Resource Adequacy Standard Resource Adequacy Technical Committee June 23, 2011.
Sixth Northwest Conservation & Electric Power Plan Draft Wholesale Power Price Forecasts Maury Galbraith Northwest Power and Conservation Council Generating.
Loss of Load Probability (LOLP) Project October 16, 2009 Resource Adequacy Technical Committee Meeting.
Powered by the Loads and Resource Information System (LaRIS) Pacific Northwest Loads and Resources Operational Peaking Adjustment Council Briefing.
PJM©2013www.pjm.com Economic DR participation in energy market ERCOT April 14, 2014 Pete Langbein.
Proposed Contract to Perform Regional Sustained Hydro Peaking Capability Study Mary Johannis PNW Resource Adequacy Steering Committee January 29, 2008.
May 31, Resource Adequacy Capacity Standard Resource Adequacy Forum Technical Committee May 31, 2006 Background Image: Bennett, Christian Science.
Resource Adequacy Technical Committee Meeting April 6, 2011.
Resource Adequacy Steering Committee Meeting October 4, 2011.
Providing Resource Planning Guidance to Individual Utilities PNW Resource Adequacy Technical Committee Meeting June 20, 2007.
TAS Steering Group Meeting DWG Update July 16, 2015 Jamie Austin, PacifiCorp DWG - Chair.
1 PNW Regional Contingency Resources Resource Adequacy Technical Committee April 6 th, 2011.
Work Plan Resource Adequacy Forum Technical Committee July 29, 2009.
Capacity Metric & Hydro Capacity Assessment Decisions Mary Johannis PNW Resource Adequacy Technical Committee Meeting June 20, 2007.
Resource Adequacy Assessment for 2015 Resource Adequacy Forum Technical Committee Meeting October 1, 2010.
Pacific Northwest Resource Adequacy Assessment for 2011 and 2013 Resource Adequacy Forum Steering Committee Meeting July 21, 2008.
Sustained Hydro Peaking Capacity Contract with Don Long Finalizing Phase II SOW Mary Johannis PNW Resource Adequacy Technical Committee Mtg January 23,
Hybrid Forecast for Resource Adequacy Analysis with recommendations Massoud Jourabchi April
Defining LOLP Resource Adequacy Forum Technical Subcommittee Meeting November 14, 2008.
Steering Committee Meeting March 9, Why talk about assumptions? Garbage in, garbage out! “Let’s go dumpster diving!” Results sensitive to key.
Sixth Northwest Conservation & Electric Power Plan Draft Wholesale Power Price Forecasts Maury Galbraith Generating Resource Advisory Committee Meeting.
Economic Planning Study June 23, In this presentation  Major changes from last meeting  Results: 2010, 2014, 2019  Finish analyst  Next steps.
Power Supply Adequacy for the 2021 Operating Year Resource Adequacy Advisory Committee Steering Committee Webinar June 8, 2016.
Slide 1 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N BPA Network Open Season 2013 Cluster Study ColumbiaGrid Planning Meeting May 2, 2013.
Target Reserve Margin (TRM) and Effective Load Carrying Capability (ELCC) of Wind Plants Evaluation - Input and Methodology ERCOT Planning 03/25/2010.
GENESYS Redevelopment
EPS Updates ColumbiaGrid Planning Meeting October 13, 2016
Analysis of the Effects of a Flexible Ramping Ancillary Service Product on Power System Operations Ibrahim Krad Eduardo Ibanez Erik Ela.
DWG Meeting March 7, 2017 (Update to a Meeting held July 26, 2016)
Kevin Harris, ColumbiaGrid TEPPC\Model Work Group - Chair
GENESYS Redevelopment Strawman Proposal
Outline Background Study Assumptions Study Results To Do
Recommended Hydro Improvement April 11, 2017
Demand Response in the 7th Power Plan
penetration of wind power
Idaho Power 2017 Integrated Resource Plan
Teaching The Duck To Fly
Steering Committee Webinar March 25, 2016
Outline Modeling Issue 2017 Modeling Goals
Vetting the GENESYS Model
Out of Region Market Assumptions
Resource Adequacy Assessment for 2015 Interim Results Resource Adequacy Forum Technical Committee Meeting July 28, 2010.
GENESYS Current Functionality
Modeling Subcommittee (MS) Updates
Recommended Hydro Improvement April 11, 2017
Forecasting and Operations CAISO Case
2021 Adequacy Assessment Status Report
Technical Committee Meeting March 18, 2016
Technical Committee Meeting March 18, 2016
Steering Committee Webinar March 25, 2016
PDWG Validation of the 2028 ADS PCM V1.0
Progress on Resource Adequacy Assessment for 2017
FUNDAMENTALS OF 100%RES POWER SYSTEM
Presentation transcript:

2021 Adequacy Assessment Data Requirements Resource Adequacy Advisory Committee Technical Committee Meeting March 18, 2016

Data Elements Hydro Sustained Peak vs. Energy curves Balancing Reserves Hourly loads Energy Efficiency Firm contracts Generating resources Independent Power Producers Market Availability Wind Solar Standby (emergency) resources Transmission 2

Hydro Summary Modified stream flows, rule curves, plant data, operating constraints Lead Pat Byrne (BPA) Source 2015 BPA HYDSIM data for 2021 OP year File Name Multiple files Format Text and binary Status Received data, processing it now Location Adequacy/2016 for 2021/Data/Hydro 3

Hydro Peak vs. Energy Curves Summary Sustained peak as function of period energy 2, 4 and 10 hour sustained peak durations 5-point piecewise-linear function End points equal low and high values Mid-points are evenly spaced Lead Ben Kujala (Council) Source Trapezoidal model and PREP program File Name SustPeak.dat Format Text file Status 7 th plan data, to be updated with new Hydro data and revised balancing reserve assumptions Location Adequacy/2016 for 2021/Data/Hydro 4

Balancing Reserves Summary Regional balancing reserves held by hydro (incorporated into the SustPeak.dat file) BPA: 400/900 MW INC/DEC April-July 900/900 MW INC/DEC August-March Rest of region: 1,829/1,799 MW INC/DEC (max) Non-hydro: 958/1,264 MW INC/DEC (max) Lead John Ollis (Council) Source Trapezoidal model and PREP program File Name SustPeak.dat Format Text file Status 7 th plan data, to be updated with new Hydro data and revised INC/DEC requirements Location Adequacy/2016 for 2021/Data/Hydro 5

Hourly Loads STM Summary 8,760 hourly loads (rows) for 80 temp years (columns) No leap year data Does include projected EE savings New codes and standards are not accounted for East/West load split factors 0.39/0.61 Lead Massoud Jourabchi (Council) Source Short-term load forecasting model File Name HourlyLoadsSTM.bin Format Binary file Status Yet to be converted into binary format Location Adequacy/2016 for 2021/Data/Loads 6

Hourly Loads LTM Summary 8,760 hourly loads (rows) for 80 temp years (columns) No leap year data Does not include any projected EE savings New codes and standards are accounted for East/West load split factors 0.39/0.61 Loads stretched to user input quarterly peak/mean values Lead Massoud Jourabchi (Council) Source Long-term load forecasting model Load Stretching program File Name HourlyLoadsFE.bin Format Binary file Status Yet to be converted into binary format Location Adequacy/2016 for 2021/Data/Loads 7

Energy Efficiency Summary Energy and peak savings incorporated into the Load file Quarterly peak and mean savings from RPM Oct-Mar peak savings = 1.9 times mean savings Apr-Sep peak savings = 1.2 times mean savings Hourly savings prorated by load stretching program Lead Charlie Grist (Council) Source Load Stretching Program or STM File Name HourlyLoadsFE_EE.bin HourlyLoadsSTM.bin includes EE projections Format Binary file Status 7 th plan data, to be updated with new Hydro data Location Adequacy/2016 for 2021/Data/Loads 8

Firm Contracts Summary Firm extra-regional imports and exports Includes the Canadian entitlement Monthly energy On-peak and off-peak contributions Lead Pat Byrne (BPA) Source 2015 BPA White Book File Name Contracts.dat Format Text file Status Received data, processing now Location Adequacy/2016 for 2021/Data/Loads 9

Generating Resources Summary Capacity, heat rate, FOR, Maintenance schedule, etc. for thermal, Independent power producers, spot market imports (all hours), spot market purchase-ahead imports (off-peak hours for month, window, day), misc Lead Gillian Charles (Council) Source Council’s Generating Resources Database File Name Genres.dat Format Text file Status 7 th plan data Location Adequacy/2016 for 2021/Data/Resources 10

Independent Power Producers Summary Capacity, heat rate, FOR, Maintenance schedule, etc. for Independent power producers Full availability from Oct-Mar 1,000 MW max available from Apr-Sep Lead Gillian Charles (Council) Source Council’s Generating Resources Database File Name Genres.dat Format Text file Status 7 th plan data Should be priced at market prices for proper dispatch Location Adequacy/2016 for 2021/Data/Resources 11

Spot Market Summary Modeled as a CA resource Capacity, heat rate, FOR, Maintenance schedule, etc. 2,500 MW max in any hour Oct-Mar None available in Apr-Sep Lead Gillian Charles (Council) Source Energy GPS Report, RAAC File Name Genres.dat Format Text file Status 2015 Adequacy Assessment assumptions Location Adequacy/2016 for 2021/Data/Resources 12

Purchase Ahead Market Summary Modeled as a CA resource Capacity, heat rate, FOR, Maintenance schedule, etc. 3,000 MW max any month during off-peak hours Lead Gillian Charles (Council) Source Energy GPS Report, RAAC File Name Genres.dat Format Text file Status 2015 Adequacy Assessment assumptions Location Adequacy/2016 for 2021/Data/Resources 13

Wind Summary 8,760 hourly capacity factors (rows) for 77 temp (columns) 20 sets of 8,760 by 77 data Up to 3 sites Lead Ben Kujala (Council) Source BPA: temperature-correlated hourly capacity factors File Name BPAWind_01.bin to BPAWind_20.bin RegWind.bin, non-BPA regional wind CAWind.bin, wind dedicated to serve CA Format Binary files Status Currently only the BPA wind fleet data is available Waiting for other regional wind data Waiting for data for CA wind located in the region Waiting for code updates to handle 3 independent sites Location Adequacy/2016 for 2021/Data/Wind 14

Solar Summary 8,760 hourly capacity factors (rows) for XX years (columns) Up to 3 sites Lead Steve Simmons (Council) Source S Idaho New: NREL data S Idaho Existing: Idaho Power Existing: Generating Resource Database File Name IdSolar.bin, IPCoSolar.bin, OtherSolar.bin Data for existing wind currently resides in Genres.dat and has fixed monthly and hourly generation Format Binary file, same format as wind data Status S Idaho New: 12 years of NREL data is available Existing solar comes from Resource Database S Idaho Existing: Waiting for Idaho Power data Waiting for code updates to handle 3 independent sites Location Adequacy/2016 for 2021/Data/Solar 15

Standby Resources Summary Small dispatchable generation, new DR, Banks Lake pumped storage Implemented via post processor Monthly energy and capacity limits Lead Rob Diffely (BPA) Source Many File Name Standby.dat Format Text file Status Updated to 2016 data Waiting for code to implement seasonal use limits Location Adequacy/2016 for 2021/Data/Resources 16

Transmission Summary Inter-nodal transmission capacity limits Lead Ben Kujala (Council) Source AURORA, other sources File Name Trans.dat Format Text file Status Using 2015 data Need to ensure consistency with other models Need to add uncertainty (e.g. FOR) for NW-SW interties Waiting to update east/west NOMOGRAM from BPA Location Adequacy/2016 for 2021/Data/Transmission 17