SLED scenario assessment for Montenegro László Szabó, PhD – András Mezősi PhD Regional Centre for Energy Policy Research Podgorica, Montenegro October.

Slides:



Advertisements
Similar presentations
Guatemala: El Canada Hydroelectric Project
Advertisements

ENERGY VALUE. Summary  Operational Value is a primary component in the Net Market Value (NMV) calculation used to rank competing resources in the RPS.
MultiMOD – An equilibrium model for energy market & infrastructure analysis Ruud Egging 24 th Oct 2013 CREE meets CenSES.
Toward a Sustainable Future Name of Conference, Event, or Audience Date Presenter’s Name | ©2011 Synapse Energy Economics Inc. All.
1.  Purpose  To present Staff’s Preliminary Findings on the 2012 Integrated Resource Plans of:  APS – Arizona Public Service Company  TEP – Tucson.
22 April 2010 EWEC 2010 Warsaw2 Jesper Munksgaard Ph.D., Senior Consultant Merit Order Effect of Wind Power – Impact on EU 2020 Electricity Prices.
Future role of renewable energy in Germany against the background of climate change mitigation and liberalisation Dipl.-Ing. Uwe Remme Institute of Energy.
Turning the wind into hydrogen: Long run impact on prices and capacity
BDF Summit /BASREC GSEO Stockholm 5-6 October 2009 Anders Kofoed-Wiuff, Ea Energy Analyses.
Preliminary Analysis of the SEE Future Infrastructure Development Plan and REM Benefits.
EMPIRE- modelling the future European power system under different climate policies Asgeir Tomasgard, Christian Skar, Gerard Doorman, Bjørn H. Bakken,
National Renewable Energy Laboratory Innovation for Our Energy Future * NREL July 5, 2011 Tradeoffs and Synergies between CSP and PV at High Grid Penetration.
RES Integration for Increasing of Energy Supply Security in Latvia: ENVIRONMENTAL AND ECONOMICAL FACTORS NEEDS FORUM 2 “Energy and Supply Security – Present.
WIND ENERGY Is there a Latvian Master Plan? CHRISTIAN KJÆR Chief Executive Officer European Wind Energy Association SSE Riga, 4 December 2008 © EWEA/L.
THE CHALLENGES OF EUROPEAN ENERGY SECURITY Jiří Feist, CEZ Group.
ESPON Project TERRITORIAL TRENDS OF ENERGY SERVICES AND NETWORKS AND TERRITORIAL IMPACT OF EU ENERGY POLICY Álvaro Martins/Luís Centeno CEEETA Research.
TYNDP SJWS #3 Demand TYNDP – 3 rd SJWS 08 March 2012 ENTSOG offices -- Brussels.
Estonian energy scenarios The first Balmorel model runs.
TA Project: “Improving Emissions Control” Session 2 Scenarios for Emissions Management Dr Russell C Frost Project Team Leader.
Black Sea Regional Transmission Planning Project By Predrag Mikša EKC - Electricity Coordinating Center Istanbul, March 2011.
Impact of the Netherlands Coal Tax on: - the use of power stations - costs to end-users and government revenues - support for energy transition July 20,
Alaa Alhamwi, David Kleinhans, Stefan Weitemeyer, Thomas Vogt 3rd European Energy Conference - E2C 2013 October 29 th, 2013 Optimal Mix of Renewable Power.
© ABB Group August 23,2010 | Slide 1 MBPC Study – 1 st Load Pocket Preliminary Results for Discussion only Entergy Regional State Committee (ERSC) Southwest.
World Energy Outlook 2015 Deputy Director General Petteri Kuuva WEC Finland, 23 Nov
Economic Assessment of Implementing the 10/20 Goals and Energy Efficiency Recommendations – Preliminary Results Prepared for : WRAP, AP2 Forum Prepared.
The Impact of Intermittent Renewable Energy Sources on Wholesale Electricity Prices Prof. Dr. Felix Müsgens, Thomas Möbius USAEE-Conference Pittsburgh,
UNEP Collaborating Centre on Energy and Environment Use and Conceptualization of Power Sector Baselines: Methodology and Case Study from El Salvador Lasse.
SLED Electricity Modelling results – Serbia László Szabó, András Mezősi
GENERATION MARKET MODELING & INTERVIEWS ON INTEGRATION BARRIERS Péter Kaderják András Kiss Michael LaBelle Budapest, February 25, 2008.
Viability of Carbon Capture and Sequestration Retrofits for Existing Coal- fired Power Plants under an Emission Trading Scheme CEDM Annual Meeting May.
Multiscale energy models for designing energy systems with electric vehicles André Pina 16/06/2010.
GRID INTEGRATION COST OF PHOTOVOLTAIC POWER GENERATION G. Strbac, D. Pudjianto, P. Djapic, J. Dragovic Energy Futures Lab.
Socio-Economic Benefits of Renewable Energy
World Energy and Environmental Outlook to 2030
Kenya’s INDC: Actions in the Energy Sector
Pan-Canadian Wind Integration Study (PCWIS) Prepared by: GE Energy Consulting, Vaisala , EnerNex, Electranix, Knight Piésold Olga Kucherenko.
Dr. Gabrial Anandarajah, Dr. Neil Strachan King’s College London
LUCIANO LOSEKANN DIOGO LISBONA EDMAR DE ALMEIDA
Global Energy Problems and Counter Policies and Measures of Korea
RENEWABLES AND RELIABILITY
Electricity, Carbon and Competition
Betül Özer, Erdem Görgün, Selahattin İncecik
Towards a 100% Renewable Energy Supply “Renewables Working Together”
SLED scenario assessment for Albania
GSR022: Review of Security and Economy Required Transfer Conditions
State Electricity Regulatory Commission BOSNIA AND HERZEGOVINA
Matthew Wittenstein Electricity Analyst, International Energy Agency
CLIMATE CHANGE POLICY SCENARIOS - BULGARIA
What drives power prices in Croatia
Romania’s intervention (5 min)
SLED Electricity Modelling results – Serbia
The Opportunity Cost of Climate Mitigation Policy
Sustainable Energy Planning for Autonomous Power System of Crete
Markus Blesl, Tom Kober IER; University of Stuttgart
Evaluating flexibility and adequacy in future EU power systems: model coupling and long-term forecasting Sylvain Quoilin, Wouter Nijs and Andreas Zucker.
EU-IPA12/CS02 Development of the Renewable Energy Sector
Key Findings and Resource Strategy
Additional clarifications on economic and adequacy running hours
NS4960 Spring Term, 2018 China: Expanded Renewables
Short-term uncertainty in investment models
Coal – security of coal supply considerations of EURACOAL
Generation Expansion Daniel Kirschen
Energy Efficiency and Renewables role in the future energy needs
RE Grid Integration Study with India
Byron Woertz, Manager—System Adequacy Planning
Byron Woertz, Manager—System Adequacy Planning
New England Economic Partnership James Daly Vice President Energy Supply Energy Market Perspectives Reliable Energy, Competitive Prices and.
Problems identified by NRAs that may lead to new infrastructure needs
Perspectives on The Future of the Energy Sector
SLED – Electricity modelling
Presentation transcript:

SLED scenario assessment for Montenegro László Szabó, PhD – András Mezősi PhD Regional Centre for Energy Policy Research Podgorica, Montenegro October 27, 2015

Outline of the presentation 1. Modelling methodology 2. Scenario definitions ‣Main assumptions on demand supply and taxation ‣Input data 3. Model results ‣Prices ‣Generation mix ‣Carbon emissions ‣RES support costs ‣Investment costs 2

Methodology The SLED analysis is based on assessing three scenarios: Reference scenario (REF); Currently Planned Policies (CPP); Ambitious Climate Scenario (AMB). Scenario assumptions were related to six dimensions: ‣carbon value; ‣energy/excise tax; ‣environmental standards; ‣deployment of renewable energy technologies; ‣deployment of conventional generation technologies; and ‣electricity demand (integrating assumptions on end-use energy efficiency improvement). Main tools: Electricity Market Model and Network model 3

1. European Electricity Market Model and EKC network model 4

Introduction Market impacts in the three analysed scenarios of SLED (REF, CPP, AMB) are modelled with REKK European Electricity Market Model (EEMM) Network impacts with EKC network model Highlights: ‣Electricity trade is modelled within the whole EU ‣Hydro generation is modelled under average rainfall conditions, but in the sensitivity assessment the impacts of dry years are also simulated ‣Benchmark costs on investment, RES supports are calculated 5

66 ► The map shows the main results of the model: ► Competitive market equilibrium prices by countries ► Electricity flows and congestions on cross- border capacities ► 36 countries are handled in the model. ► Morocco, Tunisia, Turkey, Moldova, Russia and Belarus are considered as exogenous markets ► In these markets the net export position are equal with the fact in 2013 (assumed a baseload flow) ► The model is calculating the marginal cost of around 5000 power plant blocks and sets up the merit order country by country. ► Taking into consideration the merit order and exports/import, the model calculates equilibrium prices. ► Power flow is ensured by 85 interconnectors between countries. Comments: Model functionality

7 Basic economics in the model Competitive behavior by power generators ‣„if someone is willing to pay more for my energy than what it costs me to produce it, then I will produce” Prices equalize supply and demand Efficient cross-border capacity auctions ‣„we export electricity to wherever it is more expensive and import from wherever it is cheaper” Capacity limits ‣in production and cross-border trade Large country prices around the region are exogenous to the model, the rest are determined by the model

8 Economic description and main assumptions ► The applied model is a partial equilibrium microeconomic model in which a homogeneous product is traded in several neighboring markets. ► Production and trade are perfectly competitive, there is no capacity withholding by market players. ► Production takes place in capacity-constrained plants with marginal costs and no fixed cost. ► Electricity flows are modeled as bilateral commercial arrangements between markets with a special spatial structure. ► Power flows on an interconnector are limited by NTC values in each direction. ► Fuel prices reflect power plant gate prices, transportation/ transmission costs are taken into consideration. ► Only ETS countries buy CO 2 allowances Main model assumptions Main inputs and outputs of the model ► The model calculates regional power supply – demand balance at certain capacity and import/export constraints ► Demand evolution, power plant capacities, availability and cross border power flow defines market price ► Fuel prices are estimated based on available information

9 Model characteristics In a year 90 reference hours are modelled, representing well the daily, weekly and seasonal variations Power plant data comes from international database (PLATTS), but modelled country capacity data are coming from national sources of information Future capacity expansion are from national strategic documents Fossil fuel prices are based on international forecasts of EIA and IEA. ‣ Natural gas price projections depend on the country: TTF Spot price (Western Europe) OIL index price Mix of oil index and spot price

10 Components of marginal cost

11 Efficiency parameters, utilization rates Taken from literature; dependent on the commission year and the type of the PP Availability/utilization rates: ‣Hydro availabilities: dependent on country and season (based on historical utilization rates) ‣Wind an PV: taken from JRC

12 Determining short-term marginal cost Short term marginal cost = Fuel cost + CO 2 cost + Variable part of the OPEX + Energy tax

Merit order curves - examples 13

14 Modelled baseload prices in 2015 (€/MWh), and the yearly trade flows

15 Modelled baseload prices in 2025 (€/MWh), and the yearly trade flows

16 Model output Equilibrium price in a demand period Baseload and peakload prices Electricity trade between countries ‣Price of cross border capacities Production by plants ‣Gas consumption ‣CO 2 emission

Network modelling EKC network model was used for the assessment Representatives hours of years 2020 and 2025 were modelled, to assess the network impacts on the whole region The following assessments were carried out: ‣Steady-state and contingency analyses ‣Evaluation of net transfer capacity ‣Transmission grid losses 17

18 2. Scenario definitions

Outline Main information sources The consultation process Scenario definitions Main input data to the models 19

Main information sources Energy Efficiency Action Plan of Montenegro for , Ministry of Economy, November 2013 NREAP of Montenegro. Ministry of Economy, 2014 Montenegrin Energy Strategy up to 2030 (Startegija Razvoja Energetike Crne Gore do GODINE (Bijela Knjiga)) 2014 Update / Upgrade Of the “Energy Development Strategy of Montenegro By 2030” (Green Book and draft White Book). Ministry of Economy, 2012 Most important information source were the two stakeholder consultation with Ministry representatives held in November 2014 and July

The consultation process A two-phase feedback-loop was built in the SLED project: 2014: consultation on main scenario assumptions 2015: preliminary results were delivered - further alignment of assumptions and data – to reflect the INDC process of the country Timeline: 21

SLED Scenario definition- Reference 22 Scenario assumptionsReference GHG scenario (REF) Taxation Introduction of EU ETS ETS to be introduced in 2025 Introduction year of minimum excise duty Year of introduction: 2020 Electricity supply Enforcement of environmental standards (LCP Directive) Due to requirement of LCPD directive Pljevlja I closes in RES-E deployment NREAPs : 826 MW Hydro, 151 MW wind, 10 MW PV and 29 MW Biomass by By 2030: 826MW Hydro, 190 MW wind, 32 PV and 39 MW Biomass Conventional capacity developments Pljevlja II comes online in 2023 (254MW) Pljevlja I closes in Maoce TPP will not be built. FOR LCPD: Pljeva I will operate till 2023 (20000 hours between 2018 and 2023) Electricity demand Electricity demand KAP According to 2014 May Strategy (KAP operates with two lines at 100% capacity from 2019) Means 100% total presently installed capacity (A and B line).

SLED Scenario definition- CPP, AMB 23 Scenario assumptions Currently planned policies GHG scenario (CPP) Ambitious GHG policy scenario (AMB) Taxation Introduction of EU ETS CO 2 cost in 2020 is 40 % of the ETS price, from 2025 ETS is introduced ETS to be introduced in 2020 Introduction year of minimum excise duty Year of introduction: 2020Year of introduction: 2018 Electricity supply Enforcement of environmental standards (LCP Directive) Due to requirement of LCPD directive Pljevlja I closes in RES-E deployment NREAPs : 826 MW Hydro, 151 MW wind, 10 MW PV and 29 MW Biomass by By 2030: 826MW Hydro, 190 MW wind, 32 PV and 39 MW Biomass NREAPs : 826 MW Hydro, 151 MW wind, 19 MW PV and 29 MW Biomass by By 2030: 1267 MW Hydro, 229 MW wind, 32 PV and 64 MW Biomass Conventional capacity developments Pljevlja II comes online in 2023 (254MW) Pljevlja I closes in For LCPD: Pljeva I will operate till 2023 (20000 hours between 2018 and 2023) Pljevlja II comes online in 2023 (254MW) Pljevlja I closes in For LCPD: Pljeva I will operate till % biomass utilisation rate is assumed for Plejva II. Electricity demand KAP: 50% of the total installed capacity, according to the agreement on July 2015 stakeholder meeting. Only one line operating at 100%.

Electricity consumption Reference: consumption forecast of Energy Strategy (2014) is used In CPP and AMB scenarios KAP operates only at 50% of its total capacity (one production line) from 2018, which drives down electricity demand (asssumption agreed on the July 2015 meeting) 24

Renewable electricity assumptions Till 2020 we stick to the draft NREAP (2014) values in the various RES-E technologies Between : REF scenario: Hydro kept constant, rest of the technologies according to the Green book on Energy Strategy CPP scenario: Hydro kept constant, rest of the technologies according to the Green book on Energy Strategy AMB scenario: Hydro is allowed to further grow (Green Book assumptions), together with biomass In this way capacity development is determined, while production is forecasted by the model up till 2030 assuming country specific utilisation hour (solar and wind) and average rainfall for hydro 25

RES-E capacities 1 26 REFERENCE and Currently Planned Policy scenario (CPP) capacity values (MW) REF Scenario Hydro* Pumped storage Geotherma l Solar Wind Biomass

RES-E capacities 2 AMBITIOUS scenario capacity values (MW) 27 AMB Scenario Hydro* Pumped storage Geotherm al Solar Wind Biomass

Present cross-border capacity 28 HU RS BA MKME AL BG GR HR IT

Planned cross-border capacities 29 HU RS BA MKME AL BG GR HR IT RO Under construction and approved categories are used in the model runs till IT-AL is not realised in the modelling period.

Assumed capacities I. 30 Present installed capacity New, planned non RES-E capacities In Montenegro the Plevlja II plant is built in all scenarios with 254 MW capacities. In the AMB scenario 10 % biomass co-firing is assumed. Start year of operation: 2023.

3. Scenario Assessment Results 31

Outline Wholesale price impacts Generation mix, CO 2 impacts Impacts on system costs: ‣Investment costs, ‣RES support costs Sensitivity assessment: Impacts of reduced rainfall Network impacts ‣Contingencies ‣NTC valuations ‣Network loss impacts 32

Modelling result – baseload electricity price, €/MWh in real term 33

Modelling result – peakload price, €/MWh in real term 34

Wholesale price evolution Both baseload and peakload electricity wholesale prices have a significant drop between , followed by a slight increase in the later period. The main factors influencing the wholesale price developments in Montenegro are the followings: ‣Generation expansion in the fossil based generation in the region is high. Over 7000 MW capacity (mainly lignite and coal) is built in the countries: AL; BA; BG; GR; HR; HU; ME; MK; RS; RO according to the national plans ‣New RES capacities above MW are also contributing to the price drop till ‣Higher interconnectedness in the region also allows trade of electricity (higher NTC) These new capacity expansion is illustrated in the following slide for the region 35

New PPs in the wider region* 36 Region includes the following countries: AL; BA; BG; GR; HR;HU; ME; MK; RS; RO ; New coal-based power generation, MW New RES-E generation capacity, MW

Electricity mix 37

Generation mix and CO 2 emissions Montenegro is characterised by expanding hydro capacities and significant net import share till 2030 in REF and CPP scenarios to satisfy increasing demand for electricity Other than hydro RES-E capacities appear in the all scenario from 2020, however biomass makes their contribution significant in the AMB scenario. Changes in the AMB scenario makes Montenegro net exporter. This is mainly due to demand reduction and higher hydro contribution to the electricity mix. Significant drop in CO 2 emissions is observable only in the AMB scenario, when 10% biomass co-firing is assumed at the Pljevlja II plant. Still, Montenegro is characterised by higher carbon intensity than the ENTSO-E average in all years. 38

CO 2 emissions 39

Total investment cost of new PPs, m€, Source of investment cost: Serbian Energy Strategy and Fraunhofer (2013) There is a significant investment cost need in the various scenarios: The Reference scenario has a 1.2 Billion € investment need over the following 15 years period, increasing over 2.3 Billion in the AMB scenario due to the higher RES expansion and to the Pljevlja II plant. If this latter one is avoided. In this case investment cost would be below 2 Billion €. The main contributing part is still hydro investments, but these are still the most economical RES options in the country.

Calculation of the RES-E support budget Support budget = (LCOE t -P)*Generated electricity ‣LCOE t : Levelized cost of electricity generation of technology t ~ average cost of electricity production ‣P: Modelled baseload electricity price (except PV, where peak load electricity prices are taken into account) LCOE figures are based on literature data (Ecofys, 2014) ‣55 €/MWh for hydro ‣90 €/MWh for wind ‣110 €/MWh for biomass ‣105 €/MWh for PV ‣80 €/MWh for geothermal Baseload and peakload prices are the results of the modelling RES fee = RES support budget/ electricity consumption 41

Yearly RES-E support need, m€/year 42

Unit RES-E support, €/MWh 43

RES-E support For comparison: Germany has a support level of over 60 €/MWh, Czech Republic, Portugal: over 12 €/MWh in LCOE values show that this level of support will be sufficient to cover Hydro based generation, but other types of RES-E would require higher rates. The higher rates for the AMB scenarios shown in previous figure is due to the new RES capacities in biomass, PV and wind, so careful timing of these capacities should be planned. In PV and Wind high cost saving could still appear due to the technology learning effect. 44

RES-E support vs CO 2 revenues 45

Sensitivity runs: dry years In order to check the impacts of a dry year sensitivity runs were carried out on all scenarios: A severe drought is modelled (lowest precipitation of last 8 years) Droughts assumed to take place in the whole region of South-East Europe Capacity values are the same as in the original scenarios, but hydro availability reduced according to the reduced rainfall 46

Impacts of reducing rainfall 1 47

Impacts of reducing rainfall 2 48

Impacts of reducing rainfall 3 49

Network modelling results - contingencies 50 The increasing consumption level and new generation pattern does not cause problem in the transmission network of Montenegro.

NTC change with neighbours 51 Higher RES penetration has varying impact on NTC The highest positive difference could be observed with RS, so trade opportunities increase in this directions, while in the other directions the impacts are mixed 2025 winter 2025 summer

Transmission losses An increase in capacities and consumption levels generally increases losses over the modelled period, although the results also show that the AMB scenario, with an increased level of distributed generation, will reduce the overall loss level compared to the CPP scenario WinterSummerWinterSummerWinterSummer Equivalent duration time of maximum losses [h] Transmission losses [MW] REF CPP AMB Yearly transmission losses [GWh] REF CPP AMB

Conclusions 1 The stringency of climate policy commitments has limited impact on wholesale price development. The wholesale price is dependent on regional generational capacity expansion rather than on the ambition level of climate policy. Montenegro is currently a net importer of electricity and continues to be an importing country in the REF and CPP scenarios. However, in the AMB scenario the country could become an exporter of electricity by This is due to the lower demand (KAP) and the significant increase in hydro-based generation CO 2 emission intensity remains higher than the electricity system in Europe, in spite the high share of hydro-based generation. The modelling results also show that if the country introduces a price tag for carbon emission, the government revenues could roughly finance the required RES-E support budget after Montenegro could still develop significant capacities in hydro generation, which could be a very valuable asset for the future operation of the electricity system. At present, further deployment is constrained by security of supply considerations: the country would like to reduce its dependence on hydro, which is very sensitive to meteorological conditions (precipitation levels and patterns). 53

Conclusions 2 Our sensitivity assessment confirms that Montenegro is sensitive to meteorological conditions: in the short term, severe droughts could drive up prices by EUR 8/MWh, and in the long term by EUR 3-4/MWh. In such a year the country would still rely heavily on imports, but in the AMB scenario imports could be significantly reduced. If Pljevlja II is built, the main options to reduce carbon emission are the expansion of RES based generation, and use biomass co-firing at Pljevla II. The hydro sensitivity assessment also points to an important future policy direction for the country. If further cooperation is enhanced within the region and with EU member states, the country could further utilise its hydro potential. In this case Montenegro could be very supportive towards a stricter EU renewable policy, as it would create more demand for its hydro-based generation. The assessment of network impacts shows that the Montenegrin electricity transmission system would not require further network reinforcements in the future to cope with the planned RES capacity increase in the scenarios. If the planned network additions are not built, contingencies would not appear in the system. 54