Van Allen Probes VAP Spacecraft and Programmatic Status Ed Reynolds 240-228-5101

Slides:



Advertisements
Similar presentations
Title: ICON L0 from MOC to SOC automation Author: MOC/SOC Resides: SOC Description: This is a script that copies the ICON L0 files from the MOC to the.
Advertisements

Superior Solar Conjunction Planning May 8, 2014 Dan Ossing STEREO Mission Operations Manager (240)
October 7, 1999 Freeze Grant Accounts Overview University of Pennsylvania Office of Research Services.
Frank Stocklin Ron Vento Leslie Ambrose June 28,2001 SUPERNOVA/ACCELERATION PROBE (SNAP) Data Systems.
STEREO Science Center Status Report William Thompson NASA Goddard Space Flight Center Phase E Kickoff Meeting February 23, 2007.
Chandra Users’ Committee CXC Manager’s Status Report For the period April 08 – September 08 Roger Brissenden CXC Manager 15 October 2008.
CXC Manager’s Status Report Chandra User Committee Meeting Roger J. Brissenden 25 June 2002.
Simulating A Satellite CSGC Mission Operations Team Cameron HatcherJames Burkert Brandon BobianAleks Jarosz.
CXC Manager’s Status Report Chandra Users’ Committee Meeting Edward M. Mattison 29 June 2004.
DAO March of 9 STEREO Unattended Track CONOPs Review March 27, 2007 Daniel Ossing THE JOHNS HOPKINS UNIVERSITY.
NOAA COMMAND AND DATA ACQUISITION STATION. WCDAS Numbers  DCS Help Desk at or 7451 – 24 Hours/ 7 Days a Week  Al McMath at (757)
NASA’s Goddard Space Flight Center LRO Operations Concept Richard Saylor Jr. HTSI/Code 444 August 16-17, 2005.
© Lavochkin Association, 2013 Ganymede Lander mission overview.
Van Allen Probes Spacecraft Operations July 29, 2015 Kristin Fretz
THEMIS SRR Requirement Overview - 1 UCB, 07/08/2003 REQUIREMENT DEVELOPMENT OVERVIEW Ellen R. Taylor Mission Systems Engineer Space Science Laboratory.
Aquarius Project Status 7 th Aquarius/SAC-D Science Team Meeting 11 April 2012.
10/31/06 F E D E R A L A V I A T I O N A D M I N I S T R A T I O N A I R T R A F F I C O R G A N I Z A T I O N 1 Unmanned Aircraft Systems in Civil Aviation.
STEREO - Solar Terrestrial Relations Observatory Mission STEREO STEREO Science Team Meeting May 2, 2005 Presented by Edward Reynolds APL STEREO Project.
RBSP SWG Meeting 1 3/5/2009 BARREL Update (Balloon Array for RBSP Relativistic Electron Losses) R. M. Millan and the BARREL Team.
STEREO Science Center Status Report William Thompson NASA Goddard Space Flight Center STEREO SWG April 2008 Meudon, France.
Chandra Users’ Committee CXC Manager’s Status Report For the period May 2010 – October 2010 Roger Brissenden CXC Manager 25 October 2010.
Doc.: IEEE r Submission November 2004 Bob Beach, Symbol TechnologiesSlide 1 Fast Roaming Using Multiple Concurrent Associations Bob.
MAXIM Data Systems Command & Data Handling Space - Ground Link Ground System 19 August 1999.
STARDUST 20 Nov 2003CERR - Charles Love1 of 7 STARDUST Project CRITICAL EVENTS READINESS REVIEW COMET P/WILD 2 ENCOUNTER ISA Status Charles Love JPL:
STEREO Science Center Status Report William Thompson NASA Goddard Space Flight Center STEREO SWG March 27-28, 2007.
Flight Software Overview
Lower Baffle Robert Besuner 26 August Background/Purpose This study follows on to 12 August study of the Spacecraft Interface/Handling Ring. —In.
Telemetry Constraints during Early Operations The STEREO telemetry rate is restricted during the phasing orbits due to S/C RF interference with each other,
Solar Probe Plus A NASA Mission to Touch the Sun March 2015 Instrument Suite Name Presenter's Name.
Aquarius Mission Simulation A realistic simulation is essential for mission readiness preparations This requires the ability to produce realistic data,
Van Allen Extended Mission Orbit Analysis 9/2014 SWG T. Sotirelis, F. Siddique JHU/APL.
1 CzajkowskiMAPLD 2005/138 Radiation Hardened, Ultra Low Power, High Performance Space Computer Leveraging COTS Microelectronics With SEE Mitigation D.
STEREO Science Center Status Report William Thompson NASA Goddard Space Flight Center STEREO SWG November 2007 Pasadena, California.
February Monthly Status Review (MSR) Note: No presentation this month
GLAST LAT ProjectISOC CDR, 4 August 2004 Document: LAT-PR-04500Section 3.21 GLAST Large Area Telescope: Instrument Science Operations Center CDR Section.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW I-PER 21 January EFW Flight Software Summary Peter Harvey Space Sciences.
Tracing the JWST Proposal from User Interface to Commanding of an Instrument Margaret Meixner & WIT Balzano, Robinson & CMD.
SAS_05_Contingency_Lutz_Tal1 Contingency Software in Autonomous Systems Robyn Lutz, JPL/Caltech & ISU Doron Tal, USRA at NASA Ames Ann Patterson-Hine,
Spaceweather Working Group Spaceweather Working Group Earth Science Mission Operations Eric Moyer ESMO Deputy Project Manager - Technical
1 EOS Aqua Mission Status at AMSR Science Team Meeting September 16, 2015 Huntsville, Alabama Bill Guit Aqua/Aura Mission Director - Code 584 phone
SSC Support for Sim #3 Archived MOC Data Products, and distributed via web. –Level-0 telemetry files organized by year and month –SPICE orbit and attitude.
Timothy QuinnFIELDS SOC CDR – CTG Solar Probe Plus FIELDS SOC CDR Command, Telemetry, and Ground Support (CTG) Timothy Quinn UCB 1.
GLAST LAT ProjectCDR/CD-3 Review May 12-16, 2003 Document: LAT-PR Section 5 IOC Subsystem 1 GLAST Large Area Telescope: IOC Subsystems WBS: 4.1.B.
TRIO-CINEMA 1 UCB, 2/08/2010 Mission Design Dave Curtis UCB/SSL Space Sciences Laboratory University of California, Berkeley.
THEMIS MRRSystems - 1 GSFC, Jan 5, 2007 Systems Engineering.
SPP FIELDS DFB Quarterly November 21, 2014 Solar Probe Plus FIELDS Instrument Quarterly Digital Fields Board (DFB) 1.
15th CAA Cross-calibration workshop CIS archiving activities report University College of London 2012, April
EIS Operation Planning H. Hara (NAOJ) 2007 Dec 10.
Heliophysics MO&DA Program - November 13, Page 1 Notes from the Heliophysics MO&DA Program STEREO SWG Meeting Chuck Holmes “Director, Heliophysics.
Lunar Reconnaissance Orbiter (LRO) SRR/Mechanical System August 16-18, 2005
SOFTWARE TESTING TRAINING TOOLS SUPPORT FOR SOFTWARE TESTING Chapter 6 immaculateres 1.
Facing Funding and Weather Challenges: Impact of Weather Events on Treatment Selection and Pavement Condition PPRA Fall Meeting 2014 November 17-19, Baltimore,
DDC 2223 SYSTEM SOFTWARE DDC2223 SYSTEM SOFTWARE.
cFE FSW at APL & FSW Reusability
Forecasting the Perfect Storm
CINEMA System Engineering
Technical Resource Allocations
CAA-OR (End of Phase 1) CAA DWP Operations Review
EM pre-integration review
Status Report of EDI on the CAA
the Cluster Active Archive
Autonomous On Board Mission Planning
Level 2 Requirements (MRD)
Jim Aloise System Programmer
Launch and On-orbit Checkout
University of Maryland DYMAFLEX SHOT II Post-Flight Presentation
Upcoming Events Cassini Equinox Mission
ECE 352 Digital System Fundamentals
<Your Team # > Your Team Name Here
Presentation transcript:

Van Allen Probes VAP Spacecraft and Programmatic Status Ed Reynolds

Mission Lifetime Propellant is predicted to last until November 2018 with existing trajectory Radiation summary: –All parts in radios are tested or verified tolerant to >20 krad and the radio is shielded with 750 mils which supports mission life of Nov 2018 –All parts on instruments and in other spacecraft assemblies are tested or verified to be tolerant to >30 krad which supports mission life of November 2018 with margin –Near surface materials have been tested to 10 Mrad which supports a mission life beyond November 2018 with RDM=3 design margin EMXO aging is not a life limiting factor SSP RF Power output is predicted to exceed RF required output power levels beyond 2025 with 2 dB link margin Solar array power degradation due to radiation and power for the Observatory will be available until beyond November 2018 Battery will be able to support eclipses of expected nominal durations beyond 2018

Remaining Usable Propellant Propellant usage based on initial usable propellant = kg. –Usable propellant depicted. For total including residuals, increase by kg. As of August 31, 2014: SCA usable = 43.97±0.72 kg. SCB usable = 43.83±0.72 kg. SCA (kg) SCB (kg) Total propellants used as of 8/31/ Reserved for Disposal19 Available for extended missions 23.5

Data Return Summary Trend Plot Required Daily Avg. Data Compression Enabled SSR Allocations changed BARREL Balloon Campaign Looking ahead to extended mission, SOCs encouraged to record more Level 0 production Issue in GSW

Anomalies Spacecraft Resets –XCVR reset occurred on RBSP-A at :32:30z Telemetry indicated a Power On Reset –No indication from PDU or Autonomy that off-pulse was sent –Current telemetry shows no change in power –Radio behavior looks consistent with firmware reset, except reset source reported back as off-pulse –C&DH reset occurred on RBSP-B at :05:04z Processor reset indicated “illegal instruction program exception”. –Generated during Memory Transfer Task (MSFR) –Under investigation. Recreating memory structures and stepping thru execution. –Looks like radiation induced. Seeking data from instruments. Local EMI interference at APL station –Lost commanding ability for a pass –Interference high during significant Federal events in Washington Problems binding with remote stations (Australia) –Wrong script used Data gaps, redundancies, and wrong sized files –Tied to L3 ground software updates and patches –Focus now on stability, and not to keep the most current version

Bridge Phase Programmatics APL Contract: –Updated Statement of Work Received from Program Office Replaces Closeout Data Archiving with a 3rd year of operations within LWS Contract Defers Closeout Data Archiving Phase to a future contract Project is to work within its current contract value using the year three budget, project underrun, and unused reserves Contract modification that does not increase period of performance or contract value – relatively straight forward. Science Investigation subcontracts will be modified to increase their contract values, based on values that are in their Bridge Phase proposals. –Science Investigation proposals were for an 11-month period –An additional month of budget was calculated based on the SI bridge proposals –APL Subcontracts group working to modify their current contract to continue operations and science analysis and to not perform closeout data archiving, which will be contracted sometime in the future under a new subcontract. –After this third year of operations, APL will be funded under a new contract vehicle with different terms and conditions – which will be flowed to SI. –Bridge Phase funding is separate from Augmentation funding

Contracting authority moved from NMO West to NMO East –Valeria Thomas is now the contracting officer Van Allen Probes Trending Review Dec 3,