STA 2 Expansion Project Conceptual Plan for Cell 4 STA 2 Expansion Project Conceptual Plan for Cell 4 Long-term Plan Communications Meeting November 18,

Slides:



Advertisements
Similar presentations
Project Description and Needs Lincoln Way Widening Addition of a center-turn lane and safety improvements to the grade and horizontal alignment. Needs.
Advertisements

18 October 2012 WATERSHED Science & Engineering WEST Consultants Chehalis River Basin Hydraulic Modeling and Flood Relief Alternatives Evaluation.
Southside Flood Protection Red River Channel Extension Clay County Courthouse September 8, 2008.
Permanent Protection System Opinion of Probable Cost May 2010 Courtesy USACE Photograph Courtesy USACE.
California High-Speed Train Project Los Angeles Union Station Alternatives Analysis January 7, 2010 Board Presentation.
South Maple Street Sanitary & Storm Sewer System Improvements Project October 14, 2014.
US Army Corps of Engineers BUILDING STRONG ® Methods for Determining Maximum Flood Elevations Landward of Failed Levees: An Example from the Great Missouri.
Using HEC-1 for Subdivision Runoff Detention Pond Design Stacie Kato April 26, 2004.
US Highway 17 (Center Street) Sidewalk Feasibility Study Town of Pierson, Florida.
City of Fargo Meadow Creek Area Flood Risk Management – Project 5944 Public Information Meeting June 21, 2010.
C51 RESERVOIR PROJECT UPDATE Design, Permitting and Coordination NOVEMBER 10, 2014.
31 DECEMBER VARIABLE FLOOD CONTROL DRAFT FOR LIBBY RESERVOIR U.S. Army Corps of Engineers Northwestern Division, North Pacific Region.
FNR 402 – Forest Watershed Management
POWER!!
Morphum Environmental Ltd Environmental Engineers and Consultants
The Orange County Water District Riverbed Filtration Pilot Project Jason Keller 1, Michael Milczarek 1, Greg Woodside 2, Adam Hutchinson 2, Adam MP Canfield.
Interim Update: Preliminary Analyses of Excursions in the A.R.M. Loxahatchee National Wildlife Refuge August 18, 2009 Prepared by SFWMD and FDEP as part.
St. Lucie and Indian River Counties Water Resource Study Mark Elsner, P.E., Director Water Supply Development Division Mark Elsner, P.E., Director Water.
CE 3372 Water Systems Design
JUNE 19, 2012 BCC APPEAL HEARING ON BZA #SE , April 5, 2012 APPLICANT/APPELLANT: TONY RAHBANY.
Los Osos Community Services District Basin Management Planning and Proposed Work Program June 5, 2008.
WRAC Issues Workshop EAA/STA-2 Expansion Cell 4 April 11, 2005 Acceler8 Overview.
Lincoln Consolidated Schools Citizens Steering Committee Bond Issue Final Recommendation Board of Education Meeting October 18, :00 p.m.
Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan.
WELCOME! July 31, 2012 ODOT District July 31, 2012 PURPOSE OF TONIGHT’S MEETING Introduce the project –Reconstruct I-75.
38th ½ Street Improvements (between Grayson and Airport) Group 10: Jordan Alvarez Emily Tat Charles Yamashiro.
Parts of An Electric Circuit Recall: a circuit is a closed path Electric circuit: closed path that flowing charge follows Constructing an electric circuit:
Lesson 2 How do electric circuits work?. Electric Circuits You know that electric circuits only work when the circuit is closed. OPEN.
Assign Annual Demand for a Purpose CALSIM Simulation Compare the Long-term Average Annual Friant Unit Delivery to Benchmark Study CALSIM Simulation Completed.
05C112011B Template Master – Update Tracking Number and Date Information Here Update tracking number and date on this slide Template Master – Update Tracking.
Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan.
Basin Specific Feasibility Studies Everglades Stormwater Program Basins Preliminary Findings Contract C-E024 HSA Engineers & Scientists DB Environmental.
WRAC Acme Basin B Discharge Project February 2, 2006.
Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan.
Everglades Protection Area Tributary Basins February 28, 2006 Third Annual Public Meeting on Implementation Progress.
Revisions to the Long-Term Plan for Achieving Everglades Water Quality Goals November 18, 2004 Gary Goforth Chief Consulting Engineer South Florida Water.
Expected Long Term Site Evolution of Alameda Creek and former Salt Ponds following Tidal Marsh Restoration Matt Wickland Philip.
Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan.
Proposed Revisions to the Long-Term Plan Long-Term Plan Communications Meeting August 25, 2004 Gary Goforth Chief Consulting Engineer South Florida Water.
The Orange County Water District Riverbed Filtration Pilot Project Jason Keller 1, Michael Milczarek 1, Greg Woodside 2, Adam Hutchinson 2, Robert Rice.
Everglades Protection Area Tributary Basins February 23, 2005 Second Annual Public Meeting on Implementation Progress.
Basin-Specific Feasibility Studies, ECP Basins Evaluation of Alternatives Basin-Specific Feasibility Studies, ECP Basins Evaluation of Alternatives August.
APPLICATION NO LEVEE DISTRICT No. 1 Of SUTTER COUNTY STAR BEND SETBACK LEVEE SUTTER COUNTY April 17, 2009.
Basin-Specific Feasibility Studies, ECP Basins Evaluation of Alternatives Basin-Specific Feasibility Studies, ECP Basins Evaluation of Alternatives August.
South Florida Ecosystem Restoration Projects 1. Seminole Big Cypress 3. Modified Water Deliveries 5. C-111 South Dade 10. C-111 Spreader Canal 13. Broward.
Planning Commission Study Session: Preferred Plan July 23, 2015.
MOSCONE EXPANSION PROJECT OCTOBER 21, 2013 Civic Design Review – Phase I.
Beth Kacvinsky - Lead Project Manager Office of Everglades Policy and Coordination March 1, 2016 IRL-S / C-44 Overview.
Christopher Brown, Planner II December 4th, 2014 Case No. 14ZONE1036 La Grange Road Office Louisville Metro Planning Commission Public Hearing.
January 2009 Phase IVB Construction Photographs by Brent Anderson.
S O U T H F L O R I D A W A T E R M A N A G E M E N T D I S T R I C T Water Conditions Summary Jeff Kivett, PE, Division Director Operations, Engineering.
1 TIF 9 (Trinity River Vision) Expanded and Updated Project and Financing Plans December 8, 2009 Presented to the City Council Jay Chapa Housing & Economic.
Potomac Yard Metrorail Station
Town of Brighton, Department of Public Works
Presented by Cory Foreman
Comprehensive Route Network Analysis
Downtown Valdosta Truck Traffic Mitigation Study
City of Johnston East of Merle Hay Road Infrastructure Improvements
CFT Gateway Center ( E. Foothill Blvd
Profile Leveling.
STA-1E Structures, Flow, & Long Term Enhancements*
WEST & EAST DISTRICT PROJECTS PRESENTATION
Options for Improved Boater Access to the Jacksonville Zoo & Gardens Presented to the Jacksonville Waterways Commission October 11, 2017.
Agricultural land reserve exclusion application
NATL and the Surge Area Wetland.
SE 12th Street Roadway Improvements February 8, 2005.
Joint City Council / Planning Commission
Vermillion River Greenway - Hastings MASTER PLAN
GALVESTON COUNTY WCID NO BOND PROGRAM
Background Lee County has about 180,000 pounds of nitrogen to remove from the Tidal Caloosahatchee. There are limited locations near the stream outfalls.
Presentation transcript:

STA 2 Expansion Project Conceptual Plan for Cell 4 STA 2 Expansion Project Conceptual Plan for Cell 4 Long-term Plan Communications Meeting November 18, 2004 South Florida Water Management District

Existing STA 2 and Compartment B

Proposed Cell 4 Configuration North Build-out South Build-out

Project Objectives for Cell 4 Design for maximum flexibility to accommodate build-out of Compartment B Operation by December 2006

Existing Conditions: North Edge of Cell 4

Existing Conditions: Carroll Property

Existing Conditions: NNRC

Existing Conditions: SSW view of Cell 4 from Cell 3

Initial Survey Cross Sections

Section A Elev. (ft – NAVD 1988)

Section B Elev. (ft – NAVD 1988)

Section C Elev. (ft – NAVD 1988)

Alternative 1: Cell 4

Alternative 1: Build-Out North Build-out South Build-out

Alternative 1: Summary Evaluation 1.Involves least amount of new infrastructure 2.Maximizes use of existing infrastructure 3.Probable least construction time and cost 4.Allows for earliest flooding to establish SAV 1.Reduced flexibility if future North Build-out and Cell 4 operate in series 2.Makes it difficult for future South Build-out to receive inflow from S-6 Basin Advantages Disadvantages

Alternative 2: Cell 4

Alternative 2: Build-Out Option A North Build-out South Build-out

Alternative 2: Build-Out Option B North Build-out South Build-out

Alternative 2: Summary Evaluation 1.Allows for independent operation of Cell 4, North Build-out and South Build-out 2.Allows for Cell 4, North Build-out, and South Build-out to be fed from both S-6 Basin and NNRC 1.Interior levees in Cell 4 increase construction schedule and cost 2.Extensive outflow works required for build-out scenarios Advantages Disadvantages

Alternative 3: Cell 4

Alternative 3: Build-Out South Build-out North Build-out

Alternative 3: Summary Evaluation 1.Allows for independent operation of Cell 4, North Build-out and South Build- out 2.Allows for Cell 4, North Build-out and South Build- out to be fed from both S-6 Basin and NNRC 3.Discharges toward center of treatment area improve build-out hydraulics 1.Longer lengths of interior levee and inflow/outflow canals increase construction schedule and cost 2.Flow path parallel to existing farm roads increases site grading work 3.Potential for short circuiting across the southern end of Cell 4 Advantages Disadvantages

Preferred Concept for Cell 4 Construction

Preferred Concept: Infrastructure Improvements Identified to date 1.Upgrade existing seepage canal along the NW section of Cell 3 2.Construct new inflow canal & structures, spreader canal, and seepage canal and associated levees along the north side of Cell 4 3.Construct an interior levee by enlarging the existing seepage canal on the west side of Cell 3 to reserve corridor for future use

Preferred Concept: Infrastructure Improvements Identified cont. 4.Adjust elevation of existing NNRC East Levee to meet Cell 4 design requirements and to provide a uniform grade 5.Construct a new collection canal, interior levee, discharge canal, and perimeter levee on the south side of Cell 4 6.Upgrade the existing seepage canal south of Cells 2 and 3 to serve as an extension of the Cell 4 discharge canal and connect to the existing STA 2 discharge canal

Conclusions Validates the SFWMD’s conceptual plan for Cell 4 Refinement of the Conceptual Plan: 1) Reserve the canal corridor on the east side of Cell 4 for build- out scenarios 2) Different outlet structure configuration to decrease construction time

Questions?