RockOn! 2009 1 RockOn! Structure Build RockOn! 2009.

Slides:



Advertisements
Similar presentations
Build Your Own Future RC2 Serviceability. Build Your Own Future Safety and Ground Rules Before servicing, always remove A/C power from the unit and disconnect.
Advertisements

AnaSonde Assembly. What is the AnaSonde? *Reads temperature, pressure, and humidity data from the atmosphere *After it is sent into the atmosphere, it.
UVM CricketSat Assembly Manual. Getting Started Make a hard copy print out of the following page It will help you identify the proper components Place.
Assembly Manual Mike Fortney 04/09/2004 CricketSat Receiver.
CricketSat Receiver Assembly Instructions This is the instruction slides for the assembly of a receiver board. It would be a good idea to review soldering.
CricketSat Assembly.
Colorado Space Grant Consortium Gateway To Space ASEN / ASTR 2500 Class #06 Gateway To Space ASEN / ASTR 2500 Class #06.
Frame Assembly Produced by Ed Latimer, Team 476 Ken York, Team 476 Ron Markum, Team
RockOn! Canister Integration RockOn! 2009.
Breaking, Measuring, and Adjusting Chain ~The most used drive system on a FIRST robot uses chains and sprockets. Understanding the proper techniques to.
Optical Manufacturing Solutions 1 Probe Assembly.
A-dec 300 Dual Mount on 500 Installation. Agenda ► General Information ► Recommended tools ► Installation ► Follow through install guide ► Hands-on install.
Click on this image to open the full PDF document.
ASSEMBLY INSTRUCTIONS. 2 ASSEMBLY INSTRUCTIONS TOOLS REQUIRED: SIDE CUTTING PLIERS PRY BAR 7/16” & 9/16” WRENCH 3/16” ALLEN WRENCH T-15 TORQUE.
MOOD LIGHT PCB ASSEMBLY V By Phil Townshend 2008.
CricketSat LP (Transmitter) Assembly Instructions This is the instruction slides for the assembly of a transmitter board. This is the board that will fly.
© 2006 Cisco Systems, Inc. All rights reserved.Cisco Confidential Steelers Mechanical Design Review 1 PLC MODULE INSTALLATION INSTRUCTIONS IN CGR1240.
Building a Pressure/Temperature Weather Station (Sensor Pack) AEM 1905, Fall 2008.
Electronics Merit Badge Class 4 5/17/2015Electronics Merit Badge Class National Scout Jamboree1.
2008 Cadillac CTS With Original Antenna
L.C. Technology ROBOT ASSEMBLY. Base Assembly BASE File off raised tabs on each side of Servo. Place Servo in vice between Fibre Clamps. Raised Tabs Repeat.
Assembly Manual Mike Fortney 04/02/2006 CricketSat LC Receiver.
Assembly Manual Mike Fortney 04/02/2006 CricketSat Receiver.
CricketSat Receiver Assembly Manual Mike Fortney 06/26/2006.
Colorado Space Grant Consortium Timing Circuit HW #4 Class #07 Timing Circuit HW #4 Class #07.
Robot Build IT Girls Allowed 2014 Updated 14 th August.
1 Student Hands On Training I (2007) Timing Circuit & Camera Integration Timing Circuit & Camera Integration.
1 Student Hands On Training I (2009) Soldering 101.
SpectraSonde Assembly. What is the SpectraSonde? Reads temperature, pressure, and humidity data from the atmosphere. The SpectraSonde doesn’t fly like.
Replacing board in CLAP Tools: Flashlight (torch for those of you in Cape Town)) small philips screwdriver spacer tool* dish to hold screws 2 rolls of.
School Name Date Volunteer Name Electric Generator SEEDKIT Workshop.
Title: Corvette C5 Column Lock Bypass Originator: John Neese Date: 30 Jan 2005 Revision: Sheet: 1 of 6 Column Lock Bypass.
Treezilla Clinic Lonestar Region, Division 3 - Mike Jobe.
1 FREE CLIMBER 4400 ASSEMBLY INSTRUCTIONS PART NUMBER
Plans for the 2015 Invention Challenge Target Paul MacNeal August 9,
Setting up the Ricoh C305 Press F5 to start the Presentation
Control System and Electrical Assembly Produced by Ed Latimer, Team 476 Ken York, Team 476 Ron Markum, Team
AnaSonde-3M Assembly. What is the AnaSonde-3M? The AnaSonde-3M reads temperature, pressure and humidity data from the atmosphere. After the AnaSonde is.
RockOn! Command & Data Handling PCB Build Procedure RockOn! 2009.
THERMOMETER PROJECT PCB ASSEMBLY INSTRUCTIONS.
ASSEMBLING THE PCB – V3.914 Hold the PCB as shown below.
RockOn! RockOn! Structure Build RockOn! 2008.
1 Getting a Sample to Test your Board!. 2 Step 1: Opening the detector housing Open the detector housing and remove the lid.
LAB #10. Governor Control Arm Using a 10mm socket install the two bolts that hold the governor control arm. Finger tighten then torque to 100 “#
P:\ISO \Work Instructions\Assembly\Options\ARMADILLO SWEEPER OPTIONS\10X ARMADILLO SWEEPER OPTIONS MODEL: KIT-MFG-ENG SHDN DSL M&FS SWA.
Colorado Space Grant Consortium Gateway To Space ASEN / ASTR 2500 Class #06 Gateway To Space ASEN / ASTR 2500 Class #06.
Build a Simple Electric Motor Uses a stator made of windings, an armature with two coils, and a commutator.
Designing a Next-Generation Surgical Robot Activity.
Year 8 Fuse Tester Design & Technology PCB Information Fixed value resistors 470R = Yellow, Purple, Brown This component is soldered directly onto the.
ELECTRIC VEHICLE PROJECT CAR BUILDING PROCEDURES BY: PIERRE PEASHA CENTENNIAL HIGH SCHOOL BAKERSFIELD, CA.
MIND CONTROLLED ROBOT BY ADITHYA KUMAR EIGHTH GRADE.
Sensor Module v1.1. Step 1: Sand edges of PCB & drill bolt holes (3mm) Use small green power drill or pillar drill (as available) Goggles Use a piece.
AVIVA™ ELECTRIC BIKES VIPER ASSEMBLY INSTRUCTIONS Aviva™ - For A New Way Of Life.
Line Follower Robot Year 9 Electronics V1.1. Step 1: Knowing The Chassis Chassis has been laser cut from 4mm fluted correx board Main P.C.B. Sensor P.C.B.
ASSEMBLING A CIRCUIT WHILE MAKING A DRAGONFLY. WITH... 2LEDs 2Transistors 1 Resistor 1 Capacitor 1 9V Battery 1 Battery Clip 9 Electric Wire Connectors.
Build A Motor You must follow the directions step-by-step!
VIEW SERIES with Sliding Door
GENERAL CAUTION TOOLS REQUIRED ASSEMBLY AND INSTALLATION
Introduction to Soldering (PCB Bread boards)
Bilge Pump Service Project Model Service Kit
Student Hands On Training Workshop (SHOT 2007)
Step-by-step assembly instructions
AEM 1905: Spaceflight with Ballooning University of Minnesota
Wiring the Light and Relay
THERMOMETER PROJECT PCB ASSEMBLY INSTRUCTIONS Ver: 3.21 edutek.ltd.uk.
Fin & Countertop Sample Kit Instructions
Intro to Arduino Part 2 The Breadboard
BUILDING AN AUTONOMOUS QUADCOPTER.
2019 Investing Now Summer Program
Presentation transcript:

RockOn! RockOn! Structure Build RockOn! 2009

2 Structures Overview: -Do not break configuration of you tested and armed payload -In other words, do not disconnect anything -Do not install the jumper or short RBF wires during this operation -You will not be able to erase and rearm you payload

RockOn! Structures Overview: -Open your structures kit and verify its contents. -ESD protection should be utilized during the entire building process! -Make sure anyone handling the hardware is protected from ESD damage. -If any issues arise raise your hand for assistance.

RockOn! Structural Kit Overview: Nuts and Bolts Purple M3.0x10 (2) M2.0 nuts (2) Light Green M2.5x10 (3) M2.5 nuts( 3) Black M3.0x25 (4) Red M3.0x35 (4) Light Blue M3.0x10 (4) Red M2.0x10 (2) M3.0 nuts (16) Light Green M3.0x10 (2) *Bolts and nut are 1:1 scale Nylon spacers (24)

RockOn! Structural Kit Overview: Brackets Z Accelerometer bracket (1) ‘L’ Battery bracket (1) Battery bracket (1) G-Switch bracket (1)

RockOn! Structural Kit Overview: Adding Electrical Tape Z Accelerometer bracket Leaving the holes free, add electrical tape to the Z accelerometer on the three-hole piece.

RockOn! Structural Kit Overview: Parts from other kits G-switch (1) Green LED (1) Blue RBF Wire (several feet) Red LED with connector (1)

RockOn! Structural Kit Overview: Parts from other kits Z Accelerometer Board (1) Geiger Board (1) AVR Board (1)

RockOn! Structural Kit Overview: Tools Screwdriver Set Small Wrench Needle Nose Pliers

RockOn! Z Acc (green) Structural Kit: Mounting Plate AVR (black) Geiger Board (red) G-Switch (purple) Batteries (blue)

RockOn! Let’s Start Building! RockOn! 2009

12 Structural Kit: Completed Plate

RockOn! Step 1: AVR Mounting -Find the M3.0x25 Black bolts for the AVR. -Mount the AVR in the orientation shown on the following slide using nylon spacers. -The nylon spacers will be above and below the board as shown. -AVR holes are colored black on the mounting plate. -Hand tighten with an M3.0 nut followed by a final ½ turn using the wrench and screwdriver.

RockOn! Step 1: AVR Mounting x4 for all holes on the AVR ***Note the orientation of the AVR***

RockOn! Z Acc Step 1: AVR Mounting [Before] AVR Geiger Board G-Switch Batteries

RockOn! Step 1: AVR Mounting [After]

RockOn! Step 1: AVR Mounting [After close-up] Bottom-Up View Side View Top Down View

RockOn! Step 2: Z Accelerometer Mounting -Find the M3.0x10 green bolts for the Z accelerometer bracket. -Mount the Z accelerometer bracket as shown. -Make sure the electrical tape is oriented on the correct side of the Z accelerometer bracket. -Z accelerometer holes are colored green on the mounting plate. -Hand tighten with an M3.0 nut followed by a final ½ turn using the wrench and screwdriver.

RockOn! Step 2: Z Accelerometer Mounting [Before]

RockOn! Step 2: Z Accelerometer Mounting

RockOn! Step 2: Z Accelerometer Mounting [after]

RockOn! Step 2: Z Accelerometer Mounting [after close-up] Top View Bottom View

RockOn! Step 3: Z Accelerometer Mounting -Find the M2.5x10 Light Green bolts for the Z accelerometer. -Mount the Z accelerometer as shown. -Hand tighten with an M2.5 nut followed by a final ½ turn using the pliers and screwdriver. -*** Use three nylon washers between the bracket and PCB of the accelerometer. *** -Hand tighten with an M3.0 nut followed by a final ½ turn using the wrench and screwdriver.

RockOn! Step 3: Z Accelerometer Mounting [before]

RockOn! Step 3: Z Accelerometer Mounting

RockOn! Step 3: Z Accelerometer Mounting [after]

RockOn! Step 3: Z Accelerometer Mounting [after close-up] Front View Behind View Top Down View (note the washers used for spacing) Caution! These are the leads in question.

RockOn! Step 4: Z Accelerometer Connection -Connect the four pin header to the ‘Z main’ location on the AVR as shown. -Make sure you connect Red to “+” and Black to “-”.

RockOn! Step 5: Geiger Counter Mounting -Using hot glue, stake down the red wire leading off the Geiger counter to the Geiger PCB near the bend in the wire.

RockOn! Step 5: Geiger Counter Mounting -Make sure the red Geiger wire is staked down before you mount the Geiger counter. -Using four nylon spacers and the Red M3.0x35 bolts mount the Geiger Board to the plate as shown. -Hand tighten with an M3.0 nut followed by a final ½ turn using the wrench and screwdriver.

RockOn! Step 5: Geiger Counter Mounting Side View Bottom View

RockOn! Step 6: Geiger Counter Connection -Connect the three pin header on the Geiger counter to the breadboard on the AVR as shown. Connect black to the black wire, red to the red wire as depicted.

RockOn! Step 6: G Switch Bracket Mounting -Find the G Switch bracket and mount to the plate as shown. -The mounting bolts are two M3.0x10 colored purple. -The holes to be mounted are closest the bend in the ‘L’ bracket. -Finger tighten with an M3.0 nut followed by a final ½ turn using the wrench and screwdriver.

RockOn! Step 6: G Switch Bracket Mounting [after]

RockOn! Step 6: G Switch Bracket Mounting [after close-up] Top View Bottom View

RockOn! Step 7: G Switch Mounting -Find the G Switch and mount to the G Switch bracket. -The mounting bolts are two M2.0x10 colored red. -Finger tighten the bolts with M2.0 nuts plus an additional ½ turn using the pliers and screwdriver.

RockOn! Step 7: G Switch Mounting

RockOn! Step 7: G Switch Mounting [After]

RockOn! Step 7: G Switch Mounting [After Close-up] Front View Back View

RockOn! Step 7: G Switch Mounting -Connect the G Switch header to the AVR board location labeled ‘G- switch’. -Since there is no polarity to this shorting mechanism, the orientation of the wires does not matter.

RockOn! Step 7: G Switch Mounting [After]

RockOn! Step 8: Battery Bracket Mounting -Acquire Flight Batteries in your structures kit. -Find both battery brackets and mount to the plate as shown. -Mount all brackets using m 3.0x10 bolts colored light blue. -Hand tighten with an M3.0 nut followed by a final ½ turn using the wrench. -Mount the ‘L’ bracket first pushing the batteries flush with it on the plate.

RockOn! Step 8: Battery Bracket Mounting [Before]

RockOn! Step 8: Battery Bracket Mounting

RockOn! Step 8: Battery Bracket Mounting [After] -Orient the battery connectors to lead the extending wires to the left. -Check battery voltage and record

RockOn! Step 8: Battery Bracket Mounting [After close-up] Top View *Note flushness of batteries with ‘L’ bracket Bottom View

RockOn! Step 8: Battery Connection -Connect the header from the batteries to the ‘Power’ location on the PCB. -The header should be right next to the ‘RDY’ and ‘ON’ locations within the PCB. -**Note the Red lead from the battery should connect to the ‘+’ indication on the PCB.

RockOn! Staking and Mounting RockOn! 2009

49 Step 1: Mounting the AVR -Slide some nylon threading underneath the AVR socket and tie down to the socket as shown. -The nylon should be tightly secured to the chip. Have a partner (who is also ESD protected) help you tie a tight knot.

RockOn! Step 1: Mounting the AVR

RockOn! Step 2: Tying sensor wiring [plate overview]

RockOn! Step 2: Bundling Wires -Each set of wires on the board should be bundled two or three times. -Use the nylon threading to bundle the wires together as shown. -Use a square knot to tie the nylon threading and trim the excess leaving an inch remaining. -USE CAUTION!! Don’t snip your wiring while doing this!!!

RockOn! Step 2: Bundling Wires AVR Overview

RockOn! Step 2: Bundling Wires Plate Overview

RockOn! Step 3: Mounting Battery wires -Orient the battery wiring as shown and stake to the AVR bolt indicated. -Wrap nylon thread around the bolt as shown and tie around the bundle of battery wires. -The wires are now secure to the plate.

RockOn! Step 3: Mounting Battery wires

RockOn! Step 3: Mounting Battery wires

RockOn! Step 3: Mounting Battery wires [plate overview]

RockOn! Step 4: Mounting G-switch wires -Orient the G-switch wiring for mounting to the AVR bolt indicated. -Wrap nylon thread around the gold battery bracket as shown and tie around the bundle of G-switch wires. -Wrap nylon thread around the bolt as shown and tie around the bundle of G-switch wires. -The wires are now secure to the plate.

RockOn! Step 4: Mounting G-switch wires

RockOn! Step 4: Mounting G-switch wires

RockOn! Step 5: Mounting Geiger wires -Orient the Geiger wiring for mounting to the Geiger bolt indicated. -Wrap nylon thread around the Geiger bolt as shown and tie around the bundle of Geiger wires. -The wires are now secure to the plate.

RockOn! Step 5: Mounting Geiger wires [Geiger PCB overview]

RockOn! Step 5: Mounting Geiger wires [Geiger PCB overview]

RockOn! Step 5: Mounting Geiger wires [plate overview]

RockOn! Indicator LED and RBF Wiring RockOn! 2009

67 Step 6: LED Mounting [General] -Make sure the Green LED is attached to the ‘ON’ header with the correct polarized orientation. -Additionally, make sure the connector for the Red LED is attached to the ‘RDY’ header in the correct orientation. -Extend all three sets of wires underneath the plate using the notch nearest the AVR as shown.

RockOn! Step 6: LED Mounting [General] -Use copious amounts of hot glue without being overly excessive. -Keep the tip of the hot glue gun from touching hardware, only molten glue should touch the hardware.

RockOn! Step 6: LED Mounting [General] -There are two orientations of LED mounting for the structures build. -If your plate serial number is odd (ending in 01, 03, 05) orient the LEDs in the first orientation given. This is opposite the Geiger Counter. -If your plate serial number is even (ending in 02, 04) orient the LEDs in the second orientation given. This is underneath the Geiger Counter. Example of an even plate serial number

RockOn! Step 6: LED Mounting [General] -Extend the wiring underneath the plate and match the red ‘x’ mounting location as shown. -Mount the blue RBF wiring and stake near the middle of the appropriate notch on your plate. -Make sure the lip of the red LED connector is flush with the edge of the plate. -The front of the green LED should be even with the edge of the notch when mounting. -Consult the following pictures of each orientation with any questions.

RockOn! LED Mounting: Odd Serial Number RockOn! 2009

72 Step 6: LED Mounting: Odd Serial Number -The red LED connector goes on top of the red x as shown. Orient the lip down and flush with the edge of the plate. -Also note the positive red wire is oriented inwards for this orientation.

RockOn! Step 6: LED Mounting: Odd Serial Number -Have a partner hold the LED and RBF wiring in place. -Now hot glue the wiring in place in the same manner the photo shows. -Be careful not to burn your partner’s hand!

RockOn! Step 6: LED Mounting [plate overview] Bottom View

RockOn! LED Mounting: Even Serial Number RockOn! 2009

76 Step 6: LED Mounting: Even Serial Number -The red LED connector goes on top of the red x as shown. Orient the lip down and flush with the edge of the plate. -Also note the positive red wire is oriented outwards -Also notice the green LED is flush with the notch edge, but under the plate.

RockOn! Step 6: LED Mounting: Second Orientation -Have a partner hold the LED and RBF wiring as shown. -Now hot glue the wiring in place in the same manner the photo shows.

RockOn! Staking Components RockOn! 2009

79 Step 7: Staking bottom nuts -Add hot glue to the nuts on the bottom of the plate. -Stake all nuts on the bottom of the plate using hot glue as shown in the following two pictures.

RockOn! Step 7: Staking bottom nuts Side View

RockOn! Step 7: Staking bottom nuts

RockOn! Step 8: Staking the AVR -Add hot glue across the AVR as shown for extra structural security.

RockOn! Step 8: Staking the AVR Side View

RockOn! Step 9: Staking connectors -Ensure all connectors are attached in the correct orientation. -Add generous amounts of hot glue to pot the connectors to the AVR PCB. -Now the wiring is mounted solidly to the AVR PCB. Example Connector

RockOn! Step 9: Staking connectors Example Connector

RockOn! Step 9: Staking connectors

RockOn! Step 10: Staking Geiger Wires -Stake the soldering location of the Geiger wires on the Geiger PCB as shown.

RockOn! Step 10: Staking Geiger Wires

RockOn! Step 11: Staking AVR Wires -Stake the soldering location of the AVR wires on the AVR PCB as shown.

RockOn! Step 12: Staking Accelerometer Nuts -Add hot glue to the Accelerometer nuts as shown. -You may also add hot glue to the wire leads of the Z-axis accelerometers if you desire.

RockOn! Step 13: Staking Battery Bracket -Add hot glue to the areas shown on the battery bracket and connectors.

RockOn! Step 13: Staking G-switch nuts -Add hot glue to the nuts on the G-switch as shown.

RockOn! Step 14: Staking G-switch weights Before Staking

RockOn! Step 14: Staking G-switch weights After Staking [back view]After Staking [front view]

RockOn! Final Check RockOn! 2009

96 Bottom of an odd plate Staking should occur at all of these places!!

RockOn! Top of an odd plate - Staking should occur at all of these places!!! - Set the completed Plate on the ESD mat and wait for further instructions.

RockOn! Congratulations! You are ready for Canister Integration RockOn! 2009