19Jul06 Vancouver GDE meeting 1 S2 Task Force Status (String test definition) Tom Himel.

Slides:



Advertisements
Similar presentations
9Apr07 Fermilab Steering Group 1 S2 Task Force Status (String test definition) and High Priority R&D Items Tom Himel.
Advertisements

6-Nov-06 FALC Resource Board Global Design Effort 1 Report from the GDE Barry Barish Caltech / GDE 6-Nov-06.
20 April 06 P5 - SLAC Global Design Effort 1 ILC Update from the GDE Barry Barish GDE Caltech.
Optimism R&D to be resumed! Three beam tests planned at Kek, –Hybrid target (KEKB Linac) –Liquid target (ATF Linac) –Boron-Nitride Window (KEKB) –(Starting.
5Feb07 Beijing GDE meeting 1 S2 Task Force Status (String test definition) Tom Himel.
Global Design Effort U.S. ILC Cost Translation R. Stanek, et al. Vic Kuchler 1/26/07.
Global Design Effort Americas Region Efforts and Resources Mike Harrison GDE.
Global Group 4 – Conventional Facilities and Siting V. Kuchler1 of 17 Fermilab R&D Meeting Fermilab R&D Meeting Vic Kuchler Conventional Facilities.
LCFOA Meeting at SLAC Linear Collider Forum of the Americas 1 LINEAR COLLIDER FORUM OF THE AMERICAS CONVENTIONAL FACILITIES OVERVIEW Victor R. Kuchler.
HLRF DRAFT Global Design Effort 1 Defining EDR* Work Packages [Engineering Design Report] Ray Larsen SLAC ILC Division for HLRF Team DRAFT April.
Global Design Effort ILC: From RDR to EDR or “How to Spend the Money” Nick Walker GDE.
Cryomodule Design and R&D during the EDR phase Robert Kephart With input from the T4 CM Collaboration.
RDR Report Writing Nan Phinney SLAC. 7/20/06 VLCW06 Global Design Effort 2 GLC Report Working model is the 2003 GLC Report ch 4-7
Operations, Test facilities, CF&S Tom Himel SLAC.
6-7 April 06 MAC Review Global Design Effort 1 The Global R&D Board Bill Willis GDE Columbia University.
24-Aug-11 ILCSC -Mumbai Global Design Effort 1 ILC: Future after 2012 preserving GDE assets post-TDR pre-construction program.
CLIC-ILC WG Oxford, Jan 10 Slide 1 CLIC – ILC General Issues WG, Update BackgroundChargeStatusPlans.
Global Design Effort - CFS ILC Accelerator Design and Integration Meeting 1 ILC AD&I MEETING CONVENTIONAL FACILITIES AND SITING GROUP UPDATE V.
Welcome and Presentation of Charge Steve Holmes Accelerator Advisory Committee ( May 10-12, 2005.
1 Global Design Effort: Controls & LLRF Controls & LLRF Working Group: Tuesday Session (29 May 07) John Carwardine Kay Rehlich.
CFS / Global – 04 Aug, 2010 PM Report: SB2009: –ADI meeting 23.07: Parameter tables with low energy / low power operation –BA Workshop Planning CFS participation.
22 September 2006 Global Design Effort 1 The Global R&D Board Status Bill Willis GDE Columbia University.
SCRF Cavity WebEx Meeting May 17, 2010 Reports from PM (10 min.) – Brief report from ILC-PAC – Industrialization workshop as IPAC satellite meeting, Kyoto,
Progress and Plans for R&D and the Conceptual Design of the ILC Main Linacs H. Hayano, KEK PAC2005 5/18/2005.
Global Design Effort Main Linac Technology System Kick-off Meeting Cavity Summary 20 Sept 2007 DESY Marc Ross.
1 May 06 LCFOA - SLAC Global Design Effort 1 ILC Global Design Effort Barry Barish GDE Caltech.
ILC 2007 Global Design Effort 1 Planning Damping Rings Activities in the Engineering Design Phase Andy Wolski Cockcroft Institute/University of Liverpool.
1 of 5 CONVENTIONAL FACILITIES & SITING GROUP PROGRESS OVERVIEW J.L. Baldy, A. Enomoto, V. Kuchler V. KUCHLER GDE Executive Committee Meeting
Global Design Effort1 September 20-22, 2006 MAC Review Response to 1 st MAC Mtg Barry Barish GDE.
Summary of SCRF Meeting Fermilab, April 21-25, 2008 April 25, 2008 General Summary and Further Plan: 4/21: Cavity: Gradient R&D, performance, diagnostics.
Fred Asiri1 Conventional Facilities and Siting Global Group (CFS) SLAC Update Conventional Facilities and Siting Global Group (CFS) SLAC Update December.
1 Impedance-related and others collective effects Impedance-driven collective effects/Instabilities –Single-Bunch (very high priority) –Multiple-bunch.
January 9, 2006 Margaret Votava 1 ILC – NI/FNAL/ANL Brief overview of Global Design Effort (GDE) plans, dates, and organization: –Changes since Industrial.
CFS / Global – 09 June, 2010 PM Report: SB2009: –4 two-day workshops form the core of ‘TOP LEVEL CHANGE CONTROL’ –  as advised by AAP, PAC and etc –Written.
Main Linac Technology (MLT) Meeting To be held through WebEx July 13, 2007.
1 Comments concerning DESY and TESLA Albrecht Wagner Comments for the 5th meeting of the ITRP at Caltech 28 June 2004 DESY and the LC What could DESY contribute.
ML-SCRF: Monthly WebEx Meeting April 4, Reports from PMs (20 min.) GDE activity and meeting plan Summary document of SCRF-Baseline Technical Review.
Hans Weise, DESY TTC Meeting, Milano, February 28 – March 3, 2011 Technical Board Meeting TESLA Technology Collaboration Meeting Milano, February 28 th.
Start of S2 Milestone Work H. Padamsee. Intro At KEK S2 meeting we decided to make a list of milestones and eventually cost S2 activities I tried to start.
Tests on production cryomodules Bob Kephart Sept 30, 2006.
S2 Progress Report for EC H. Padamsee and Tom Himel For the S2 Task Force.
Global design effort Americas 1 FY08-09 ILC-Americas planning G. Dugan ILC-Americas Planning meeting SLAC Sept. 13, 2006.
PM Report CFS /Gbl ILC PAC (19-20 May) Agenda: –Akira, Rongli, Hitoshi H, Marc, Nick, Toshiaki, Mark P., Peter G. –Nick will report on Design.
CBETA Project ALD’s Cost and Schedule Review February 6, 2017
IE 8580 Module 1: Course Preliminaries
Conventional Facilities and Siting Global Group (ARCFS)
Webinar on the Exposure Draft of CAS Continuing Education Policy
Working in Groups in Canvas
Oct 22 Group Leaders Planning meeting
Principles of Information Systems Eighth Edition
(Selected) Project Management Processes at the XFEL
08:30 Closed Session 09:00 Introduction to R&D Board Task Forces (Bill Willis ) Part I - Gathering information for S0 (Chair: L. Lilje)
EDR Planning, Cost Review and Technical Risk Analysis
Main Linac EDR: Cavity & Cryomodule Discussion
Notes on Ramp-Up and Production
Charge for the Technical Board Members of the Tesla Technology Collaboration (TTC)
Conventional Facilities and Siting Global Group (CFS) SLAC Update December 10, 2007 Acknowledgment: Jerry Aarons, Clay Corvin, and Esther Kweon Fred Asiri.
Industrialization of previous projects
2. SCRF General Preparation for the AD&I Preparation for AAP Review
Technical Design Report preparation
ILC Global Design Effort
Barry Barish GDE Caltech
Collaboration Board Meeting Closing Hasan Padamsee
[Team Name] Monthly Technical Report [Safe Genes Program]
Commissioning, Operations, and Reliability Status
Quality Criteria Near Final.
DR Session Introduction
ILC - Global Design Effort
‘ Causes of Delay During Construction Phase at Palestine ’
Reliability, MPS, Operations and Tuning Work Packages
Presentation transcript:

19Jul06 Vancouver GDE meeting 1 S2 Task Force Status (String test definition) Tom Himel

19Jul06 Vancouver GDE meeting 2 Contents Overview Charge Members Planned Process Status

19Jul06 Vancouver GDE meeting 3 Overview Task force set up by the Global R&D board –What are the reasons and goals of a system test? Start with TRC R2 list. –Determine how many RF units are needed as a system test before ILC construction –Do they need to be in a string? –Is beam needed? Charge has been viewed, but not yet approved by the EC Just getting started on the work

19Jul06 Vancouver GDE meeting 4 Charge The conceptual plan for the R&D for the ILC includes the building and testing of a string of cryomodules after the proof of principle milestone of reliable production of cavities and single cryomodules has been achieved. As the basic building block of the linac, the minimal string is one RF Unit containing three cryomodules with full RF power controlled substantially as in the final linac. The desired string for the ILC R&D plan may consist of many RF units. The definition of the details of this milestone, which we call S2, needs to be defined by GDE, along with a timeline for its realization. Some of the crucial specifications of the string have been defined in the R2 ranking of the R&D issues in the TRC report (2003). More specifications may be necessary. The full scope and goals should be well-established and accepted soon, since the they will constitute an important milestone on the road to final construction approval. The R&D Board is asked to set up a Task Force to propose a Plan with a set of goals and specifications and a time scale for accomplishing them, which will be submitted to the GDE for action. Examples of the parameters to be determined are the number of modules needed in the string, the performance specifications, the nature and duration of the tests, the rules for the deviations from the final production specifications and final environmental conditions. The Task Force should take care that the whole project is as well-defined as possible, interacting with the Area communities involved. Without anticipating the result of the Task Force analysis of the number of modules required, it is likely to be large enough so that industrialization is required to render their production practical. The Plan should contain the practical information to show how the transitions from proof-of-principle to the S2 Milestone and start of main linac production should be accomplished. There is no GDE specification dealing with a Test Linac, and the Task Force proposal should address the question of whether there should be a Test Linac, and with what parameters. Such a linac would imply the injection of a beam into the string defined in S2. The Task Force should establish the relationships between the functions of the string, the operation of the string in realistic conditions, and the use of a Test Linac as a facility for beam measurements.

19Jul06 Vancouver GDE meeting 5 Members Hasan Padamsee (Co-Chair) Tom Himel (Co-Chair) Bob Kephart Hitoshi Hayano Nobu Toge Hans Weise Consultants: Sergei Nagaitsev, Nikolai Solyak, Lutz Lilje, Marc Ross, Daniel Schulte

19Jul06 Vancouver GDE meeting 6 Process The task force’s work will be open. Comments are welcome from people who choose to follow our work. Just remember that everything is a draft or preliminary as it will be a work in progress. Wiki page available off the linearcollider.org website via the Global R&D board wiki or at: list and archive are available via the wiki.

19Jul06 Vancouver GDE meeting 7 Planned Process Plan to proceed on 3 paths: 1.What are the goals that require a system test? How many RF units are needed? Will these be satisfied by the presently planned productions? 2.What is the scale of the industrial effort and how will this provide a smooth transition to the start of main linac construction? Do the modules produce in this effort need a system test or does it produce so many RF units that we may as well use them in a system test? 3.What tests require beam and how long a linac would be needed for those tests? Then compare results and make an overall plan

19Jul06 Vancouver GDE meeting 8 Process: 1. Goals and production plans Review TRC R2 goals and revise them See what tests/ test facilities are presently planned FLASH (TTF-II), SMTF XFEL and STF Determine total amount of equipment planned or existing

19Jul06 Vancouver GDE meeting 9 Process: 2. Industrialization needs Look at how previous high tech projects have been industrialized Make cavity/cryomodule industrialization plan(s) Count how many cryomodules we may have as a function of time.

19Jul06 Vancouver GDE meeting 10 Process: 3. Beam tests? Calculate number of RF units needed for various system beam tests –Emittance growth –Vibration problems –…

19Jul06 Vancouver GDE meeting 11 Status We have a fairly detailed work plan Tasks have been distributed to taskforce members Work has started on all 3 parts of our process Our first group discussion of the this work was yesterday

19Jul06 Vancouver GDE meeting 12 Discussed Yesterday Kubo: length needed for beam test of emittance growth and vibration measurement Nagaitsev: Fermilab ideas for ILC test linac Toge: Reliability evaluation and comments Himel: previous industrialization efforts Kephart: An ILC industrialization plan Padamsee: Update on timelines for TTF, STF and SMTF All: Update R2 list of reasons for a system test

19Jul06 Vancouver GDE meeting 13 Decision Making Consider all information gathered with the above process Consider that too small a test could cause a high risk of problems when the ILC is built Consider that too large a test could cause significant schedule delays By some process, make a sage decision by the end of this year.

19Jul06 Vancouver GDE meeting 14 Decision Making Method ? ?

19Jul06 Vancouver GDE meeting 15 Decision Making Method

19Jul06 Vancouver GDE meeting 16 Decision Making Method

19Jul06 Vancouver GDE meeting 17 Decision Making Method