MTA Data Acquisition System K. Yonehara APC, Fermilab 1/14/15MTA DAQ, K. Yonehara1.

Slides:



Advertisements
Similar presentations
Beam Test of a High-Pressure GH 2 -Filled RF Cavity (for efficient muon beam cooling for a MC or NF, since the low-Z ionization energy-loss absorber and.
Advertisements

Automatic Conditioning J. Alberto Rodriguez. Outline Purpose of an automatic conditioning system General overview Fast signals Long term access to data:
COSMIC RAY MUON DETECTION USING SCINTILLATION COUNTER AND WAVELENGTH SHIFTING FIBERS ARUNODAYA BHATTACHARYA VSRP-2009,TIFR,MUMBAI 6/7/09.
Lab G measurements Yagmur Torun Center for Accelerator and Particle Physics Illinois Institute of Technology MUCOOL Collaboration Meeting - LBNL - October.
M. Dracos LNGS, 03 August Target Tracker. M. Dracos LNGS, 03 August Rate tests SM1 Sensor (1,3,4) no signal Plane 6 absent Sensor (1,2,7)
Why do accidents happen?  Accidents happen for one or both of the following Unsafe acts & Unsafe conditions.
5-9/12/2005 CPE How to format your computer and re-install Windows XP.
Working group report T500 and E203 Armin Reichold 30/08/2011 A Reichold, for SP group, FACET User Meeting, SLAC 1.
The LHCf experiment Measurement of Photons and Neutral Pions in the Very Forward Region of LHC Letter Of Intent: May 2004 Technical report: September 2005.
Inventory Management System With Berkeley DB 1. What is Berkeley DB? Berkeley DB is an Open Source embedded database library that provides scalable, high-
Detector Systems Update MICO March 10, MICE Detector Systems  CKOV u No update  TOF0/1 u Tests with laser injection system progressing. u Tests.
MuCool RF Status MICE Collaboration Meeting June 7-10, 2006, Fermilab A. Moretti June 9, 2006.
Automation of the 805MHz cavity conditioning procedure Ajit Kurup MuCool Test Area RF Workshop, Fermilab 22 nd August 2007.
1 Timescales Construction LCR MICE Beam Monitoring counters + DAQ My understanding Jan 07 Feb 07 Mar 07 Apr 07 May 07 Jun 07 Jul 07 Aug 07 Sep 07 ISIS.
Accident Prevention.
8/10/2015Windows 71 George South. 8/10/2015Windows Windows Vista Windows Vista was released in January 2007 some five years after Windows XP Vista.
© 2006 Cisco Systems, Inc. All rights reserved.Cisco PublicITE I Chapter 6 1 Characterizing the Existing Network Designing and Supporting Computer Networks.
Term 2, 2011 Week 3. CONTENTS The physical design of a network Network diagrams People who develop and support networks Developing a network Supporting.
Physics 145 Introduction to Experimental Physics I Instructor: Karine Chesnel Office: N319 ESC Tel: Office hours: on appointment.
Input Devices Manual and Automatic By Laura and Gracie.
Vladimir Frolov for Torino group. Experimental activities: The system for testing the MRPC in the Torino INFN laboratory has been fully mounted and checked;
CMPE 421 Parallel Computer Architecture
The LHCf experiment Measurement of Photons and Neutral Pions in the Very Forward Region of LHC Letter Of Intent: May 2004 Technical report: September 2005.
XFEL The European X-Ray Laser Project X-Ray Free-Electron Laser Stefan Simrock, DESY LLRF-ATCA Review, Dec. 3, 2007 Requirements for the ATCA based LLRF.
The digital multimeter (DMM) precision: good speed: slow points: single recording: pen & pencil.
ASTA roadmap to EPICS and other upgrades Remote monitoring and control DAQ Machine protection Dark current energy spectrometer.
Safety on Call ACCIDENT PREVENTION. Safety on Call WHY DO ACCIDENTS HAPPEN? Accidents happen for one or both of the following: – Unsafe acts – Unsafe.
An RF & High-Speed Acquisition Systems for High-Gradient Tests at CLIC Test Facility Raquel Fandos.
Compare and Contrast Changes in Technology And how it meets the need of it’s users.
Photosynthesis & e - transport Pathway thinking How?Why?
MICE Run Plan Sept/Oct 2009 m. apollonio – IC MACHINE PHYSICS USERs RUN NO SHIFT A B C D E.
Deploying Software with Group Policy Chapter Twelve.
MTA RF Status 01/31/ 2007 NF&MCC Meeting UCLA A. Moretti.
1 Al Moretti, APC, Fermilab MAP- Winter Meeting February 28 - March 4, 2011 TJNAF Newport News, VA.
Manage-2000 What should we be doing?. What should we be doing? Daily Data Backup!!!!! – /roi/XXX.MAIN – /roi/TERMINALS.x.x – /usr/udxx – /opt/VSI-FAX/
Hamburg European Linear Collider Workshop ECFA LC2013 Krzysztof Krzysik XFEL AMTF Cavity and Module RF Measurement Procedures.
ECS and LS Update Xavier Vilasís-Cardona Calo Meeting - Xvc1.
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
Some quick news about X-Box1 data processing for BD location.
December,  No official date for full switchover from RMS 2.38 to RMS 3.0  State of the RMS Support Contract  Expect regular updates once per.
MOM Report Linda Coney MICE Operations Manager University of California, Riverside MICE Video Conference May 20, 2010.
Progress of High Pressure Hydrogen Gas Filled RF Cavity Test Katsuya Yonehara Accelerator Physics Center, Fermilab Muon Accelerator Program Review Fermilab,
1 Yagmur Torun, IIT Katsuya Yonehara, Fermilab Dec 16, 2010 – MAP PMG Meeting.
Timing and synchronisation J. Jones, A. Moss and E.W. Snedden April/May 2015.
An Introduction to VEX IQ Programming with Modkit
Test of the dressed spoke cavity
MuCool Test Area Dedicated facility built at the end of the Linac to address MuCool needs RF power 805MHz, 201MHz)
Chromatography- TLC & HPLC
RFID In Alma.
Aim: What are the steps to the Scientific Method?
Monitoring glitches in the frequency divider
Ensuring a successful TPC production
PHYSICS WITH TECHNOLOGY
Projects Integrating Planning for Successful Occupancy, Operation, and Maintenance into your Capital Project.
How to Fix Windows 10 Update Error 0x ?.
Log on for Home Gym Reviews -
Damping Ring Kicker Tests at AØ
Task Instructions (You will need chalk)
Updating Phase Status Issues
P17082 Biomechanical Elbow Model Final Presentation
Status of the Crystal Ball
Key areas A.C as a current which changes direction and instantaneous value with time Calculations involving peak and r.m.s. values Determination of frequency.
Signal Conditioning.
Classroom Procedures Mr. Clark’s classroom.
Use Case for controlling the Pierre Auger Observatory remotely
VELA Charge Measurements – Update
BR - What is your favorite kind of weather? Why?
WEDNESDAY, SEPTEMBER 19TH
Data exchange, data merging and common storage format for NEWS
 Epsonsupports247 Fix Epson Printer Error Code W-61.
Presentation transcript:

MTA Data Acquisition System K. Yonehara APC, Fermilab 1/14/15MTA DAQ, K. Yonehara1

Goal in today’s discussion Suggestion from data analysis group – Configuration of MTA DAQ system Organize experimental group Urgent item Fast counter system for BD study 1/14/15MTA DAQ, K. Yonehara2

What is missing for data analysis in past RF tests? Unclear log – It should tell “When”, “Who”, “What”, (“Why”,) and “How” Need more documentations – We should have documents which should include a hazard, goal, run plan, instruction manual including with the spec of detector system, block diagram, organization, drawing etc Quick analysis – Ideally, data analysis group should provide daily analysis result to the experimental group 1/14/15MTA DAQ, K. Yonehara3

Required for systematic analysis Clear log – “When”, “Who”, “What”, (“Why”,) and “How” – Update configuration if it is changed – Write down anything even tiny issues – Hypothesis is fine – Make a log book (paper media) 1/14/15MTA DAQ, K. Yonehara4

Required for systematic analysis Documentation set – Run plan – Specification of detector system Location Type Cable configuration – ex) S1L+RG58(3’)+Lecroy ch1… Signal calibration Timing calibration 1/14/15MTA DAQ, K. Yonehara5

Required for systematic analysis Data storage – Daily update – Our official data storage server is MTA3 1/14/15MTA DAQ, K. Yonehara6

Configuration of DAQ system First step: Oscilloscope setting – Lecroy is the primary scope First RF pickup BD light signal – RF signals should go to Tektronix Second RF pickup Forward & reflected – Do not touch Lecroy once it sets for DAQ mode – Use Tektronix to quickly check RF signals 1/14/15MTA DAQ, K. Yonehara7

Organization of MTA MTA administration – Palmer-Bross-Torun Experimental group – Pasquinelli MICE: ? (originally Chung) Modular: Bowring HPRF: Yonehara – Data analysis group Each group has their own I contributed for MICE and HPRF groups 1/14/15MTA DAQ, K. Yonehara8

Install fast counter Measure RF phase vs dark current as a function of peak RF gradient Present plastic counter is too slow Alvin and I can prepare for a new counter 1/14/15MTA DAQ, K. Yonehara9