TBT Data & Lattice Measurement for Recycler Ming-Jen Yang December 17, 2014.

Slides:



Advertisements
Similar presentations
Proton Beam Measurements in the Recycler Duncan Scott On Behalf of the Main Injector Group.
Advertisements

Experimental set-up at E.S.R.F. L. Farvacque. 1/04/2004L. Farvacque - E.S.R.F.2 Experimental set-up Hardware Kickers Bpms Software Data acquisition processing.
January 15, 2005D. Rubin - Cornell1 CESR-c Status -Operations/Luminosity December/January vs September/October -Machine studies and instrumentation -Simulation.
Analysis of ATF EXT/FF Orbit Jitter and extrapolation to IP (Data of ) ATF2 Project Meeting K. Kubo.
Searching for Quantum LOVE at the Australian Synchrotron Light Source Eugene Tan On behalf of Rohan Dowd 120/10/2010Eugene Tan – IWLC 2010, Genega ASLS.
Alignment and Beam Stability
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Ultra-Low Emittance Storage Ring David L. Rubin December 22, 2011.
AGS PP Progress Haixin Huang January, 3, Haixin Huang2 Daily Activities of Last Week 12/19 Difficulty to bring beam into Booster. Source only pulses.
Y. Ohnishi / KEK KEKB-LER for ILC Damping Ring Study Simulation of low emittance lattice includes machine errors and optics corrections. Y. Ohnishi / KEK.
MI Large Aperture Quad (WQB) Project Part 2 – Installation & Operation Beams-doc #2479.
August 05, Startup 2013 Machine Status:  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac Booster  Main Injector Startup.
1 FermiLab Recycler Ring BPM Upgrade Based on Digital Receiver Technology R. Webber, J. Crisp, P. Prieto, D. Voy, C. Breigel, C. McClure, M. Mengel, S.
INTRODUCTION  RECYCLER BPM – Original system not adequate to measure beam position precisely. It is being upgraded to meet the required physics precision.
Tevatron BPM System Upgrade Technical Update Bob Webber Run II Luminosity Upgrade Review February 2004.
Emittance Growth from Elliptical Beams and Offset Collision at LHC and LRBB at RHIC Ji Qiang US LARP Workshop, Berkeley, April 26-28, 2006.
Basic BPM Hardware Theory Jim Steimel. Wall Current Charge in a cylindrical perfectly conducting pipe produces an equal and opposite image charge at the.
J. Pfingstner Jitter studies February 12, 2014 Optics corrections in the ATF damping ring Jürgen Pfingstner, Yves Renier.
Main Injector Lambertson Aperture Scans David Johnson and Ming-Jen Yang March 17, 2006.
AP2 Line & Debuncher Studies Status Keith Gollwitzer Antiproton Source January 9, 2006 Many people involved with providing the hardware and software that.
Multibunch beam stability in damping ring (Proposal of multibunch operation week in October) K. Kubo.
Analysis of Multipole and Position Tolerances for the ATF2 Final Focus Line James Jones ASTeC, Daresbury Laboratory.
28-May-2008Non-linear Beam Dynamics WS1 On Injection Beam Loss at the SPring-8 Storage Ring Masaru TAKAO & J. Schimizu, K. Soutome, and H. Tanaka JASRI.
Beam stability in damping ring - for stable extracted beam for ATF K. Kubo.
Main Injector Slow Extraction Studies f Y. Alexahin, E. Gianfelice-Wendt, J. Johnstone (APC) D. Morris, M.-J. Yang (AD) MI Slow Extraction Group Meeting,
F All Experimenters' Mtg - 2 Jun 03 Weeks in Review: 05/19/03 –06/02/03 Keith Gollwitzer – FNAL Stores and Operations Summary Standard Plots.
Dave Johnson July 12, 2010 NOvA/ANU Recycler Upgrades Review Optics, Apertures, and Operations Nova-doc 4930.
RECYCLER REQUIREMENTS FOR THE RECYCLER RING & ASSOCIATED TRANSFER LINES BPMs Brajesh Choudhary for the MI Dept.
Specifications of Tevatron BPM Upgrade Jim Steimel.
DMS steering with BPM scale error - Trial of a New Optics - Kiyoshi Kubo
Advanced Optics Control, CERN, Masamitsu Aiba, PSI Recent optics measurements at SLS M. Aiba, M. Böge, Á. Saá Hernández, D. Mayilyan and.
9/2/2003Tev BPM requirements1 Tevatron BPM and BLM requirements Mike Martens.
Dave Johnson July 12, 2010 NOvA/ANU Recycler Upgrades Review Optics, Apertures, and Operations Nova-doc 4930.
12/16/03Tev BPM requirements1 Tevatron BPM requirements Mike Martens.
August 12, Machine Status: 2013  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac : Roof hatch installed Booster : Magnet.
APEX Studies: Accelerating w. Near 3 rd Order Resonance Vincent, Al, Michiko, Steve, Don, Yun, Guillaume, Mei, Todd, Wolfram, Greg, …
MI/RR Operation Status Ioanis Kourbanis August 21, 2014.
A Possible Source of the Tune Drift on the Front Porch in the Tevatron.
AGS Polarized Proton Status January 25, 2011 Vincent Schoefer.
MI/RR Status January 3, 2014 D. Capista. MI Preformance.
Ultra-low Emittance Coupling, method and results from the Australian Synchrotron Light Source Rohan Dowd Accelerator Physicist Australian Synchrotron.
Pre-Meeting Meeting Brian Drendel Accelerator Shift Plot.
Threading / LTC/ JW1 How difficult is threading at the LHC ? When MADX meets the control system … J. Wenninger AB-OP &
Alignment and beam-based correction
Orbit Response Matrix Analysis
Sextupole calibrations via measurements of off-energy orbit response matrix and high order dispersion Nicola Carmignani.
Zgoubi tracking study of the decay ring
Orbit Control For Diamond Light Source
ILC DR Lower Horizontal Emittance? -2
Linear and Nonlinear Lattice Correction Via Betatron Phase
ATF2 IP Tuning Task Simulation Updates
Jeffrey Eldred, Sasha Valishev
3rd ATF2 Project Meeting, December 18-20, 2006
Beam Injection and Extraction Scheme
Thursday morning – optics correction
Lecture 32 ACCELERATOR PHYSICS HT E. J. N. Wilson.
Lecture HT13 Beam-Beam I ACCELERATOR PHYSICS HT E. J. N. Wilson.
Startup program, 1 Machine setup (i.e. R:\Controls\matlab\acceleratorcontrol\docs\SRSetupUsingMatlab_ALS.doc) Bergoz BPM/orbit checks: monbpms, correct.
LHC (SSC) Byung Yunn CASA.
450 GeV Preliminary Commissioning: Measurement Programme
Studies for TBT optics measurements in the PSB
Optics Measurements in the PSB
with Model Independent
Yuri Nosochkov Yunhai Cai, Fanglei Lin, Vasiliy Morozov
Multipole Limit Survey of FFQ and Large-beta Dipole
Alternative Ion Injector Design
Multipole Limit Survey of Large-beta Dipoles
Integration of Detector Solenoid into the JLEIC ion collider ring
Error Sensitivity in MEIC
100th FCC-ee Optics Design Meeting
Presentation transcript:

TBT Data & Lattice Measurement for Recycler Ming-Jen Yang December 17, 2014

TBT study setup Injection –Use R:HT850 and R:VT849 to offset injection –RR $E1 on state 3. Beam –8 Booster turns. –50 bunches. Recycler –Damper OFF. –Separate tune to reduce coupling. Emulate lattice error with –QT301, 302, 303, & 304 at -3 amps. December 17, 2014

Turn-By-Turn Analysis December 17, 2014

Tune setting December 17, 2014

BPM position by lattice, horizontal plane December 17, 2014

BPM position by lattice, vertical plane December 17, 2014

RMS position error, horizontal plane December 17, 2014

RMS position error, vertical plane December 17, 2014

Ring wide beta, horizontal December 17, 2014

Ring wide beta, vertical December 17, 2014

Calibration Factor From Measured beta function December 17, 2014

Lattice examples December 17, 2014

Sine fit to TBT horizontal BPM data December 17, 2014

Sine fit to TBT vertical BPM data December 17, 2014

Horizontal calibration December 17, 2014

Vertical BPM calibration December 17, 2014

Summarize BPM scale factor results Average BPM scale factor –1.01 in horizontal plane. –0.99 in vertical plane. Round BPM, scaled as elliptical –VP607, scale factor 2.18 –HP608, scale factor 1.24 Wide aperture –HP102 scale factor BPM at Lambertson locations –HP232, scale factor –HP402, scale factor –HP522, scale factor December 17, 2014

R90 calculation Matching measured beta December 17, 2014

Matching measured beta function Horizontal planeVertical plane

Focusing tweaks December 17, 2014 Horizontal focus Vertical focus Others

Single quad error test with Measured base lattice December 17, 2014

R90, QT301 at -3 amp Horizontal planeVertical plane

December 17, 2014 R90, QT302 at -3 amp Horizontal planeVertical plane

December 17, 2014 R90, QT303 at -3 amp Horizontal planeVertical plane

December 17, 2014 R90, QT304 at -3 amp Horizontal planeVertical plane

Compare Turn-By-Turn Orbits with R90 calculation using fitted initial position & Angle December 17, 2014

Apply calibration factors, horizontal plane December 17, 2014

Apply calibration factors, vertical plane December 17, 2014

R90 analysis, tbt orbit deviation

Comments on RR Lattice result No inconsistency in the TBT data Beta waves in both planes –Horizontal plane: ~35% in Δβ/β. –Vertical plane:~25% –Matched by R90 to ~5% level. Compare TBT orbit with R90 calculation –Initial positions & angles fitted by TBT analysis. –Good match with matched base lattice. –Not perfect As judged by BPM resolution. Calibration factors –Measured beta functions are credible. Injection test with IPM. December 17, 2014