Summary Instrumentation & Controls WG Wim Blokland Jim Patrick Manfred Wendt Project X Collaboration Meeting September 12, 2009.

Slides:



Advertisements
Similar presentations
Wednesday July 19 GDE Plenary Global Design Effort 1 Instrumentation Technical System Review Marc Ross.
Advertisements

ESS Timing System Plans and Requirements Timo Korhonen Chief Engineer, Integrated Control System Division May 19, 2014.
26-Sep-11 1 New xTCA Developments at SLAC CERN xTCA for Physics Interest Group Sept 26, 2011 Ray Larsen SLAC National Accelerator Laboratory New xTCA Developments.
Novel Beam Diagnostics on PXIE Vic Scarpine, FNAL 2nd Annual PASI Meeting April 3-5, 2013.
Project X Injector Experiment (PXIE) Steve Holmes Fermilab Proton Accelerators for Science and Innovation: Second Annual Meeting Rutherford Appleton Laboratory.
R Scrivens, CERN, ABI Workshop, 12/2008 The Feschenko Bunch Shape Monitor User experience at CERN Developed by INR, Troitsk. High resolution bunch shape.
1 Proton Upgrades at Fermilab Robert Zwaska Fermilab March 12, 2007 Midwest Accelerator Physics Collaboration Meeting Indiana University Cyclotron Facility.
TUPD02 BEAM DIAGNOSTICS FOR THE ESS BLM BPM Trans Profile Bunch Shape BCM Preliminary System Count A. Jansson, L. Tchelidze, ESS AB, Lund, Sweden Hybrid.
Project X RD&D Plan Instrumentation Manfred Wendt AAC Meeting February 3, 2009.
Linac Front-End R&D --- Systems Integration and Meson Lab Setup
MUON COLLIDER: R&D Status & Opportunities for Participation FNAL, February 24, 2011   1.Motivation & OverviewSteve Geer 2.Accelerator R&DVladimir.
SNS Integrated Control System EPICS Collaboration Meeting SNS Machine Protection System SNS Timing System Coles Sibley xxxx/vlb.
FEL Beam Dynami cs FEL Beam Dynamics T. Limberg FEL driver linac operation with very short electron bunches.
INTRODUCTION  RECYCLER BPM – Original system not adequate to measure beam position precisely. It is being upgraded to meet the required physics precision.
Status of the Fermilab Cold BPM R&D Manfred Wendt Fermilab 10/1/20091LCWA09 Main Linac WG.
S. De Santis “Measurement of the Beam Longitudinal Profile in a Storage Ring by Non-Linear Laser Mixing” - BIW 2004 May, 5th Measurement of the Beam Longitudinal.
HINS 6-Cavity Test 3 Month Plan Jan 12, Current Schedule 2-3 day shutdown scheduled to start Jan 18 (Wednesday) to upgrade BPM system and reinstall.
Controls & LLRF ILC Controls Telecon August 17, 2006 John Carwardine RDR Report Writing.
HLRF DRAFT Global Design Effort 1 Defining EDR* Work Packages [Engineering Design Report] Ray Larsen SLAC ILC Division for HLRF Team DRAFT April.
F Project X Overview Dave McGinnis October 12, 2007.
Recent RF Development at Fermilab Weiren Chou and Akira Takagi Fermilab, U.S.A. July 7, 2003 Presentation to the FFAG03 Workshop July 7-12, 2003, KEK.
 Advanced Accelerator Simulation Panagiotis Spentzouris Fermilab Computing Division (member of the SciDAC AST project)
1 Plan and Opportunities for Migration and Integration of the Photoinjector into New Muon Lab Mike Church AAC Review - 12/5/06.
Fast feedback, studies and possible collaborations Alessandro Drago INFN-LNF ILCDR07 Damping Rings R&D Meeting 5-7 March 2007.
Project X Injector Experiment (PXIE) Sergei Nagaitsev Dec 19, 2011.
A Path Toward Standardized Low-Energy Emittance Measurements Doug Moehs January 17, 2007.
Overview of Beam Diagnostics from the Advanced Accelerator Concepts Workshop (AAC06) Vic Scarpine Instrumentation Meeting 20 Sept 2006.
1 The Cost & Schedule to Accomplish the Transition Proposed SLAC Controls Upgrade December 1, 2010 Ray Larsen.
PIP-II: Why a new accelerator? Paul Derwent Fermilab Community Advisory Board 23 July 2015.
ICFA-HB 2004 Commissioning Experience for the SNS Linac A. Aleksandrov, S. Assadi, I. Campisi, P. Chu, S. Cousineau, V. Danilov, G. Dodson, J. Galambos,
Project X RD&D Plan Beam Transfer Line and Recycler Injection David Johnson AAC Meeting February 3, 2009.
Global Design Effort: Controls & LLRF Americas Region Team WBS x.2 Global Systems Program Overview for FY08/09.
Status of Project X Keith Gollwitzer Accelerator Division Fermilab MAP Winter Meeting - March 1, 2011.
Robert R. Wilson Prize Talk John Peoples April APS Meeting: February 14,
Project X RD&D Plan Controls Jim Patrick AAC Meeting February 3, 2009.
Instrumentation at ATF / TTF Accelerator Test Facility (KEK) Tesla Test Facility – FLASH (DESY) ESA / LCLS (SLAC) Marc Ross, SLAC.
SNS Beam Diagnostics A. Aleksandrov Spallation Neutron Source, Oak Ridge, USA.
Working Group 5 ProjectX Collaboration Meeting April 12-14, 2011 Summary Talk M. Wendt and W. Blokland Controls, Instrumentation & Protection.
Summary: Working Group on Instrumentation Wim Blokland ORNL / SNS Manfred Wendt Fermilab 11/22/2008Summary: Project X Instrumentation WG 1.
Collaborations on Beam Instrumentation R&D – A personal view – Manfred Wendt Fermilab 11/21/2008Project X Instrumentation WG1.
PXIE Beam Instrumentation Status Update – Preparing for MEBT 1.1 Beam Vic Scarpine Feb. 9, 2016.
Proton Driver Keith Gollwitzer Accelerator Division Fermilab MAP Collaboration Meeting June 20, 2013.
ProjectX Sessions on Controls & Instrumentation Conveners M. Wendt, C. Briegel, W. Blokland.
Fermilab Control System Jim Patrick - AD/Controls MaRIE Meeting March 9, 2016.
Machine Protection Systems (MPS) Arden Warner, and Jim Steimel Project X Machine Advisory Committee March 18-19, 2013.
Managed by UT-Battelle for the Department of Energy Experience on SNS Beam Instrumentation Collaborations Willem Blokland Beam Instrumentation Group Spallation.
PXIE Beam Instrumentation Status Update Vic Scarpine Weekly PIP-II Meeting June 7, 2016.
PIP-II Beam Instrumentation Vic Scarpine PIP-II Machine Advisory Committee Meeting March 2016.
F Sergei Nagaitsev (FNAL) Webex meeting Oct ICD-2 chopper requirements and proposal #1.
ESS Beam Diagnostics Overview Andreas Jansson / BI Group Beam Diagnostics Mini-workshop
Overview of Present and Future Laser Diagnostics for Fermilab H- Accelerators Vic Scarpine, Fermilab Presenting for the H- laser diagnostics team 26 Sept.
Sub-Task HOM-BPM HOM based Beam Position Monitors – Planned and Extant Measurements N. Baboi, DESY, Hamburg EuCARD WP 10: SRF, Annual Review Meeting.
ESS Front End diagnostic
High Intensity Neutrino Source HINS Linac Front-End R&D --- Systems Integration, Beam Diagnostics Needs, and Meson Lab Setup Bob Webber.
Bunch Shape Monitor for HINS Wai-Ming Tam Project X Collaboration Meeting September 11, 2009.
Beam Diagnostics for the FAIR Proton LINAC RFQ Workshop at GSI
ILC Beam Instrumentation – Introduction Remarks –
E-beam scanner experience at FNAL
The ILC Control Work Packages
BE-BI Software for LINAC4
WP11: electron and proton beam testing
Diagnostics overview and FB for the XFEL bunch compressors
LAL meeting on e+ studies, Oct. 2010
Advanced Research Electron Accelerator Laboratory
XFEL bunch compressors
Linac/BC1 Commissioning P
commissioning and measurements
High Level Physics Applications for LCLS Commissioning
Injector Experimental Results John Schmerge, SSRL/SLAC April 24, 2002
LCLS Control System Personnel Linac & BC2 Controls progress
Presentation transcript:

Summary Instrumentation & Controls WG Wim Blokland Jim Patrick Manfred Wendt Project X Collaboration Meeting September 12, 2009

ProjectX 11/ Collaboration Opportunities on Project X Beam Instrumentation  Detailed requirements and specifications for beam instrumentation systems have NOT yet been established. Need: –Requirements derived from beam dynamics and operations aspects –Define monitor technologies, e.g. button vs. cavity-style BPM (SRF) –Exact location / layout / space / # of beam detector components. –Standardization of electronics hard- & software (e.g. VME/VXS, TCA,...)  Potential Collaborations –Laser-based, non-invasive beam diagnostics – Formal collaboration (MoU) with LBNL, J. Byrd. –MEBT emittance monitor, e.g. mulitwire/slit apparatus. –LEBT emittance diagnostics, e.g. Allison scanner. –Collaboration on a e-beam scanner for non-invasive beam profile monitoring of high intensity proton beams (SNS) –Collaboration of a high power version of a fast Faraday cup as invasive longitudinal beam profile monitor. Manfred Wendt (ORNL)

ProjectX 11/ Experience on SNS Beam Instrumentation Collaborations Willem Blokland (ORNL) From the perspective of the Beam Instrumentation Group Time-line (CD2 and up) - Changes in budget, requirements, merging of designs - Built-up of SNS, construction, Division groups Setup of division groups with clear responsibilities: - Controls/Physics/ Instrumentation and each was allowed to determine their own development environment but tight together through the CA protocol Documents: (Do your documentation from the start!) Design Document System Brochure Interface Control Document Acceptance Test Traveler

ProjectX 11/ Count on changes: - Budget (close to CD4 budgets are tight!) - Specifications - People Collaboration: - Work with other labs and meet other people in your field - Need very good communication (meet in person) and Reviews to catch issues - Define work scope very well and document - Count on changes - Can be a lot of fun

ProjectX 11/ HINS as a Beam Diagnostics Test Facility  HINS (High Intensity Neutrino Source) is a Linac Injector R&D facility  Potential exists to operate HINS as a low-energy, high- intensity H- test facility during Project X R&D phase –Development of Fermilab projects as well as facility for external collaborators  Potential projects: –Beam diagnostics R&D –Beam chopper R&D –Low-energy material studies Vic Scarpine (FNAL) 5 Maximum set – R&D Emittance station – slit- collector/laser slit Bunch length – wire and/or laserwire Bunch profile – laserwire Beam Diagnostics R&D section

ProjectX 11/ Bunch Shape Monitor for HINS Progress on 400MeV Bunch Shape Monitor for HINS that can be used for ProjectX Wai-Ming Tam (FNAL) 6 Preliminary study on its RF deflector shows that it is possible to use it for the HINS Linac Front End. More testing will be carried out. RF Deflector Assembly Motor Driving Target Wire Signal Pickup Beam Pipe

ProjectX 11/ Longitudinal Laser Wire for Project X/HINS  Collaboration between LBNL and FNAL on laser wire diagnostics started in August  Goals –Understand minimum laser pulse energy and rep rate (i.e. power) for acceptable S/N: Study frequency dependence of backgrounds & Explore lock-in techniques –Understand maximum laser pulse energy and laser peak power that can be transmitted over m of fiber. –Determine measurement bandwidth (fast scanning with mirror) –Explore techniques for measuring tails (modulation)  Schedule –Oct 09, determine laser power capabilities over fiber –Nov 09, visit SNS for background study –Dec. 09, determine expected S/N for HINS. –Jan 09, deliver report. John Byrd (LBNL) 7

ProjectX 11/ E-Beam Scanner R&D  Measure the transverse profile of a high intensity beam with electrons  Progress: purchase of E-gun and design Randy Thurman-Keup (FNAL) 8 ParameterSNSPX ( MI ) Design Beam Intensity 1.4E142E14 Ring Length (  s) 111 Charge density (particles / cm) 5.4E90.6E9 RMS Bunch Length (ns) Transverse Beam Size ~ few cms ~1 mm Peak Charge Density (particles / cm) 5.4E94E9

ProjectX 11/ ProjectX Controls  Goals, e.g. unified control system for the entire accelerator complex  Base core on the evolving ACNET experience, with EPICS support “underneath” –To simplify test and integration of products from collaborators  Development of EDM screens (graphics console look and feel) –Can access ACNET and EPICS devices –Many examples shown, as EPICS EDM, ACNET graphics console, and as web browser embedded ACNET graphics console  HINS / NML as R&D test bed –Evolve software framework (the “right” way is still discussed) –Test new hardware, e.g. VXS, xTCA –Try out new ideas… Jim Patrick (FNAL)

ProjectX 11/ xTCA for Physics Standards  Adapt high availability xTCA hardware standard for physics use. –Active participation in the PIGMG committee. –Open source standard of the telecommunication industry.  Presentation with many technical details of the current xTCA PIGMG standard –ATCA, MTCA, interfaces, form factors, timing & clock signals, etc.  Examples of accelerator applications –DESY-XFEL / FLASH: LLRF system based on ATCA Plans for a 12 ch. 16-bit 125 MSPS digitizer on MTCA (2-wide AMC) –SLAC: Collaboration with DESY on controls upgrade (MTCA based). Upgrade 80 (out of 240) RF stations (LLRF, slow and fast interlocks). Ray Larsen (SLAC)

ProjectX 11/ Project X Timing  Details on the current Fermilab multi-level timing system –TCLK – high level machine coordination –Beam Sync Clocks – machine specific bunch level timing –Machine State data – MDAT, ethernet  Project X clock system requirements and upgrades –Details on a XCLK / ACLK system –Keep TCLK for legacy equipment (MI, RR, etc.) –RCS beam sync clock to synchronize Linac and RCS –RR beam sync clock to synchronize RCS and Recycler –ACLK/XCLK will be source by a new time line generator, and will have many upgraded features with respect to TCLK Greg Vogel (FNAL)

ProjectX 11/ Charge Summary  Discussion/potential modifications to ICD-1 and ICD-2 –Many requirements not finished so exact impact is not defined –Shorter Linac: less instrumentation but a new booster-> different style instrument e.g. BPM –Controls: Additional RCS beam sync clock  Discuss potential modifications to the existing RD&D –Collaboration with SNS on ES/Emittance/FC/Laser  Establish goals and work plan for FY2010 –Schedule on longitudinal LW proposed by LBNL –Provisional distribution of responsibility: TBA (SNS/LBNL)  Identify any issues related to the above that need resolution –Physics requirements but we understand this will take time