Update on the implementation of the first plans Pilot catchments & the restoration plan Priority catchments WEF Local measures River basin districtPercentage.

Slides:



Advertisements
Similar presentations
Devon Floodplain Woodland Project Nick Whatley & Richard Knott Fisheries, Recreation and Biodiversity Team (Devon) March 2009.
Advertisements

The Inner Forth Landscape Initiative David Anderson Inner Forth Futurescapes Officer RSPB Scotland.
Draft River Basin Management Plan Workshop Freshwater Pearl Mussel December 2008.
ANGUS COMMUNITY PLANNING PARTNERSHIP SOA IMPLEMENTATION GROUP 3 rd December 2009.
SNH PERSPECTIVE ON PLANNING AND THE ENVIRONMENT Derek Manson Planning Adviser.
Salmonoids West Project Exchange of knowledge and establishment of cooperation networks between R&D Institutions and the private sector to develop best.
Feedback from engagement and consultation for physical condition River Basin Management Planning Unit.
Update on the implementation of the first plans Pilot catchments & the restoration plan Priority catchments WEF Local measures River basin districtPercentage.
Richard Jeffries and Roy Richardson Improving Scottish Rivers Proposals for delivery.
Update on the implementation of the first plans Pilot catchments & the restoration plan Priority catchments WEF Local measures River basin districtPercentage.
Advisory group update – September 2013 Development of the second river basin management plans Sustainable water management for the benefit of Scotland’s.
Current condition and Challenges for the Future Report s (Scotland and Solway Tweed)
EC Bathing Waters and Bathing Water quality management Calum McPhail Environmental Quality Unit manager Caroline Dilks Senior Scientist.
European Marine Sites Update Ruth Crundwell. Natural England Advisers to the government on the environment, providing practical scientific advice on how.
WWF & Heritage Lottery Fund QUESTOR Centre, QUB. Introduction River Basin Districts Lough Neagh Ballinderry River & Management Area RIPPLE What is it?
IMPROVING FISH PASSAGE ON THE RIVER ALMOND WELCOME.
The Irwell Pilot an integrated approach to delivering sustainable water management and additional benefits Katherine Causer National Pilot Steering Group.
FLOOD RISK MANAGEMENT The next steps. The National Technical Advisory Group On Flooding Issues An Overview and the Future.
Pilot Projects on Strengthening Inventory Development and Risk Management-Decision Making for Mercury: A Contribution to the Global Mercury Partnership.
FIAC Awareness and Assistance Sub- Committee 15 th June 2005 David Faichney – SEPA Flood Warning Unit Manager SEPA and Flood Warning.
Water Framework Directive and the SRDP Jannette MacDonald Land Unit, SEPA.
IMPROVING FISH PASSAGE ON THE RIVER ALMOND WELCOME.
Implementation of WFD River Basin Management Plans for Northern Ireland Bridgeen Magorrian.
Current condition and Challenges for the Future Report s (Scotland and Solway Tweed)
River Basin Management Planning Cath Preston Senior Planning Officer (River Basin Planning) 2 nd March 2006.
Kettle River Watershed Management Plan Stakeholder Advisory Group Meeting #3 – July 19, 2012.
Flood and Water Management In Scotland Dr Rebecca Wade, UWTC, University of Abertay
Flood Risk Assessment Group Stage 2 amendments. Mapping watercourses- new duty on LA’s Map features contributing to managing flood risk- New duty SEPA.
FBAG- Catchment Planning Floods Directive and Flooding Bill Flood Risk Management Planning.
Sub-basin Management Plans for the Freshwater Pearl Mussel Dr E. Sides, J Ryan, Dr A O’Connor, Dr Colin Byrne Department of Environment, Heritage and Local.
Experience of SEA in Scotland IAIA 07 Seoul 5 June 2007 Amanda Chisholm.
Climate Change Adaptation Indicators. Adaptation Indicators- Origin and Purpose Adaptation Indicators.
Kingston Maurward College Dorchester 5 May 2006 WAgriCo - UK Project Launch.
IFG Stock Take (Aegir Consultancy Report) Refresh of the IFG Structure IFG September Meetings 2015.
The second River Basin Management Plans and implementation of fish barriers measures Jenny Davies RBMP coordinator June 2017.
Caroline Riley Partnership Manager Healthy Waterways Trust
Moray Firth Inshore Fisheries Group
Identification on Significant Pressures - Surface Water Bodies
Pearls in Peril International EU LIFE Conference Programme Tuesday 3rd May 2016 Pearls in Peril End of Project Conference Evening Conference Dinner.
THE LOWESWATER CARE PROJECT
Nutrient Abatement Erosion and sediment control and urban stormwater program and Flexible options for nutrient management – point source. Sandra Avendano,
The second River Basin Management Plans delivery update - Highland
The second River Basin Management Plans and implementation of fish barriers measures Jenny Davies RBMP coordinator November 2017.
Potential demonstration sites: Scotland - SEPA
Scottish Natural Heritage
Environmental Services Training Group
The second River Basin Management Plans delivery update - Argyll
Role of Fisheries Trusts/ Boards in River Basin Management Planning
River Basin Management Planning
Marr Locality Planning Overview Community Councils Forum Gartly
FORESTRY AND DIFFUSE POLLUTION
RBMP Delivery Update Outer Hebrides 2017
River Basin Management Plans delivery update – North East May 2018
Wetlands Restoration and Pollution Reduction Project GEF TF BUL
A pilot appraisal at catchment level for the second RBMP cycle: Experience from the UK Presented by: Simon Scanlan (Defra) Kathrynne Moore (Environment.
River Basin Planning & Flood Risk Management in Scotland
Securing the future of the freshwater pearl mussel in Great Britain
Collaborative Instruments for Ambitious Climate Action (CI-ACA)
Development of a joint water and agriculture agenda
Financing Natura 2000 GUIDANCE HANDBOOK
Developing the second plans
Fresh Water Pearl Mussel
Preparing a River Basin Management Plan WFD Characterisation Manager
Kevin Andrews Economic Advisor Water and Flood Management Economics
National Collaborative Outreach Programme (NCOP)
Strategic Steering Group
Scotland, United Kingdom
Scottish Government Responsible for environment & flooding issues
Waters and Communities Office Local Authority Waters Programme
Concept paper on the assessment of WFD River Basin Management Plans
Presentation transcript:

Update on the implementation of the first plans Pilot catchments & the restoration plan Priority catchments WEF Local measures River basin districtPercentage of water bodies at good or better Scotland Solway Tweed

Pilot catchment & restoration plan 4 pilot catchments (Esk, Dee, Glazert & Nith) Approaching the end of phase 1 – scoping the opportunities for measures delivery Phase 2 - local engagement to discuss detailed design and preparations for implementation will be undertaken now to March 2015 Phase 3 – April 2015 to March 2016 implementation of measures Updates available; nning/implementing_rbmp.aspx nning/implementing_rbmp.aspx Restoration plan is published; aspx aspx

Diffuse Pollution (rural)

Diffuse pollution from rural sources Highland sheep event 30 th May Continued liaison between land unit and ops SEARS training days 54 RPID staff Fisheries event – Inverness Coming up; further agriculture training for SEPA staff SNH staff training North 6 th Oct

Water Environment Fund New unit manager – Rachel Harding-Hill Dingwall Recruited 3.5 specialists and a technical administrator Update will be coming soon…

Outer Hebrides local measures update Water body/ catchment Project title StakeholderProgress (to Oct 2013) Willow GlenWillow Glen, Stornoway SEPA, Stornoway Trust, Scottish Water, Western Isles Council. Glen River Catchment action plan is progressing. A review of the habitat survey carried out by Outer Hebrides Fisheries Trust and SEPA identifies options to progress the project. Meeting with all interested stakeholders is being arranged to discuss next steps. Project should also include Stornoway Port Authority as additional stakeholder. Small WaterbodiesSmall Waterbody Group SNHContractor Sue Bell ecology currently working on identifying small waterbodies in Outer Hebrides which are within protected areas and are at unfavourable condition for their various qualifying interests. Focussing on South Uist and Harris.

Water body/ catchment Project title StakeholderProgress (to Oct 2013) Harris - variousPearls in PerilSNHRiverwatcher has been out to Harris and is returning this week for second walkover. 2 Riverwatch dissemination afternoons in collaboration with fisheries trust. One attempt to encyst juvenile salmonids with glochidia – unsuccessful as mussels did not release juveniles (spat). Evidence of illegal pearl fishing identified during walkovers.