EMIS 7307 1 Chapter 5 Much of Chap 5 and 6 varies depending on the contract type. Two major types are important so we’ll digress to Contracting 101 for.

Slides:



Advertisements
Similar presentations
Procurement Management
Advertisements

1 PROJECT MANAGEMENT ROLE OF KEY PERSONNEL Bernd Madauss International Space University Strasbourg February, 2011
1 Lecture 1.4: Life Cycle Models Dr. John MacCarthy UMBC CMSC 615 Fall, 2006.
1 Lecture 3.2: Technical Reviews and Audits (SEF Ch 11) Dr. John MacCarthy UMBC CMSC 615 Fall, 2006.
EMIS Chapter 6. EMIS Chapter 6 EMIS Chapter 6 Fig 6.2 shows where the SEMP fits into the earliest program stages. Fig 6.5 has an.
Systems Engineering Management
Requirements Module: Configuration & Change Management Space Systems Engineering, version 1.0 SOURCE INFORMATION: The material contained in this lecture.
Effective Methods for Software and Systems Integration
Chapter 2: Overview of Essentials ISE 443 / ETM 543 Fall 2013.
Software Configuration Management
INFO 637Lecture #51 Software Engineering Process II Defining Requirements INFO 637 Glenn Booker.
Configuration Management Non Government Std: EIA Standard-649 “A management process for establishing and maintaining consistency of a product’s performance,
Apply Project Scope Management Techniques Project Scope Processes – Part 2 Certificate IV in Project Management Qualification Code BSB41507 Unit.
Configuration Management and Change Control Change is inevitable! So it has to be planned for and managed.
Software Configuration Management (SCM). Product Developer Disciplines One view of the world is that there are three types of activities are required.
Critical Design Review (CDR)
Solar Probe Plus A NASA Mission to Touch the Sun March 2015 Instrument Suite Name Presenter's Name.
DESIGN OF PRODUCTS AND SERVICES Chapter Three Copyright © 2014 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
Project Management Planning and Scheduling Payment Schemes Cost Estimating Risk Management MAE 156A.
Collaborating for Quality through the Project Quality Plan Matthew Conlon ESS ACCSYS QA/QC Quality Learning & Planning.
Copyright 2014  Procurement means acquiring goods and/or services from an outside source  Other terms include purchasing and outsourcing Information.
BSBPMG502A Manage Project Scope Manage Project Scope Project Scope Processes Part 2 Diploma of Project Management Qualification Code BSB51507 Unit.
Systems Analysis and Design in a Changing World, Fifth Edition
Introduction for the Implementation of Software Configuration Management I thought I knew it all !
Camera PDR/CD1 Planning 19 September 2008
Session 2 Dr. Dan C. Surber, ESEP
Introduction to Project Management
Configuration Management
IL Marking Get out your CPU / Memory answers Swap with someone else
Copyright All Rights Reserved by
Software Configuration Management
Software Configuration Management
Software Project Configuration Management
Chapter 2 How important is determining (or creating) the need first?
Life Cycle of Federal Acquisition
Building Information Systems
Procurement Management
Systems Analysis and Design in a Changing World, 4th Edition
ISA 201 Intermediate Information Systems Acquisition
Chapter 11: Software Configuration Management
12.3 Control Procurements The process of managing procurement relationships, monitoring contract performance and making changes or corrections as needed.
Software Configuration Management
Configuration Management Why do we need it? What does it do?
12.2 Conduct Procurements The process of obtaining seller responses, selecting a seller and awarding the contract The team applies selection criteria.
JTAMS PRE-CDR IT/SIS ANALYSIS
Configuration Management
CPFF,CPIF,CPAF FPIF FFP,FPIF FFP CPFF FPIF,FPAF FFP FP (EPA)
Systems Analysis and Design
Systems Analysis – ITEC 3155 Evaluating Alternatives for Requirements, Environment, and Implementation.
Chapter 12: Project Procurement Management
Industrialization of previous projects
Professor: JUANCHO A. INTANO, Ph. D SCHOOL FINANCE AND EDUCATIONAL PLANNING Reporter: Helene D. Delmoro.
Request for Proposal (RFP)
Request for Proposal & Proposal
Engineering Processes
Scope management Chapter 5 Copyright ©2016 Pearson Education, Inc.
Lockheed Martin Canada’s SMB Mentoring Program
Chapter 2 How important is determining (or creating) the need first?
EMIS 7307 Chapter 6.
Chapter 11: Software Configuration Management
First Article Inspection
DOD’S PHASED SYSTEM DEVELOPMENT PROCESS
8 Tech Processes Drive Acquisition
CS/EE/ME 75(a) Nov. 19, 2018 Today: Prelimnary Design Review Homework.
Configuration Management
Chapter 3: Project Integration Management
Chapter 11 Project Control.
Software Reviews.
Comparison of Major Contract Types
Information system analysis and design
Presentation transcript:

EMIS Chapter 5 Much of Chap 5 and 6 varies depending on the contract type. Two major types are important so we’ll digress to Contracting 101 for a few charts. –If interested in more details see Chapter 6 of text.

EMIS Chapter 5

EMIS Chapter 5 The two types of contracts are Firm Fixed Price (FFP) and Cost Plus Fee (CPF). FFP contracts are used when: –Producing product is low risk. –Making off the shelf purchases. –Potential willing bidders exist. There is little, perhaps no, customer involvement during the execution of FFP contracts.

EMIS Chapter 5 CPF contracts are used when: –Producing system is perceived as high risk. –Potential bidders won’t bid on a FFP. There is much customer involvement in the execution of CPF contracts. –Design reviews –Production reviews –Testing –ETC.

EMIS Chapter 5 Why is there so much customer involvement in the execution of CPF contracts? –Only have a target cost. If the costs exceed target customer still pays. –The system is so new and challenging it’s hard to know the requirements well, at the beginning. This partially explains requirements creep.

EMIS Chapter 5 Range of Contract Types/Risk/Program Control (TYPES OF CONTRACTS) FFP/EPAFPIFFPRT&M OR L/H CSCRCPIFCPAF CPFFFFP (RISK) LOW HIGH HIGH LOW BUYER SELLER (PROJECT CONTROL) BUYER SELLER MORE LESS LESS MORE FFP = Firm Fixed PriceCS = Cost Sharing FFP/EPA = Firm Fixed PriceCR = Cost Reimbursement w/Economic Price AdjustmentsCPIF = Cost Plus Incentive Fee FPIF = Fixed Price Incentive FirmCPAF = Cost Plus Award Fee FPR = Fixed Price RedeterminableCPFF = Cost Plus Fixed Fee T&M = Time and MaterialsL/H = Labor Hour

EMIS Chapter 5 Design review general considerations: –Customer involvement not required in an FFP contract. From a SE perspective no less important! –Event driven. –All the lead-up work complete else postpone! –Should be a phase culminating event. –Actual event should be anticlimactic.

EMIS Chapter 5

EMIS Chapter 5 Figure 5.1 shows the author’s view of how design reviews, both formal and informal, fit into the process. Next slide shows a government view. Design reviews are gating functions. –Next phase doesn’t officially start until successful. Design reviews fit into a bigger review picture as depicted in the second slide from here.

EMIS Chapter 5

EMIS Chapter 5

EMIS Chapter 5 Informal reviews are the many “mini” reviews (discussions) without the senior management or customer. –This is where the work is done to make sure the various design teams are ready for the formal reviews.

EMIS Chapter 5 Formal reviews at the system level cover items like those listed in Figure 5.4. Typically every program has at least 3: –SRR –PDR –CDR Look at Figure 5.6 for an example of tracking TPMs through the review process.

EMIS Chapter 5 –Operational requirements –Draft A spec –Functional Analysis (block diagrams) –Feasibility analysis (trade study results) –Maintenance concept –SEMP –TEMP –Draft TPMs –Conceptual; design drawings –Output is baseline functional design –May consume as much as a week. Conceptual Design Review also called SDR or SRR includes:

EMIS Chapter 5 –Subsystems specs –Draft Assembly specs –“ilities reports” –TPM analyses –Engineering models/ prototypes –Lab test results presented –Supplier data –Allocated baseline –Test plans reviewed –May consume the equivalent of a weeks time for each subsystem –~15% of the production drawings available Preliminary Design Review (PDR) includes:

EMIS Chapter 5 –Evaluates all Cis –Evaluates product baseline –Prelude to actual building and coding of system –Product baseline –Test plans reviewed –May consume the equivalent of a weeks time for each assembly –~ 85% of the production drawings available Critical Design Review (CDR) includes:

EMIS Chapter 5 For PDRs and CDRs the formal events will necessarily be capstone or summary events. Action items are brought forward and results adjudicated. –From previous reviews. –From TIMs. Sometimes reviews are given a pass to continue design, with a  review scheduled to finish the review some time in the future. –  reviews are for a few specific action items.

EMIS Chapter 5 Whenever we have a baseline what happens? –For some good (?) reason someone wants to change it! Change control is a big issue from the beginning and gets bigger as time goes on. –More drawings that may need to change. –More drawings or products impacted if there is a change. Remember, change control is required because of changes!

EMIS Chapter 5 Configuration management comprises: –Identification –Control –Status accounting –Audits

EMIS Chapter 5 Identification –Selection of CIs. –Determine types of documentation. –Documenting the functional and physical characteristics. –Establish interface management procedures. –Issuing numbers and identifiers.

EMIS Chapter 5 Control –Engineering change proposals. Class 1- Form, fit, function changes. –Requires customer approval. Class 2 - All other changes. Configuration Control Board. –Request for deviation.

EMIS Chapter 5

EMIS Chapter 5

EMIS Chapter 5 Status accounting: –Lists of approved documents. –Status of proposed changes. –Implementation status. –Configuration of all units.

EMIS Chapter 5 Audits –Functional Configuration Audit (FCA) Verifies actual performance of each CI meets specification. –Physical Configuration Audit (PCA) Verifies as-built matches technical data package.

EMIS Chapter 5 Look at the 2 paragraphs near the bottom of page 245. –Another illustration that later is more costly.