OHIO River-Net Objectives Proposed Network European RIS Example Project Plan
Objectives 1 Network infrastructure specification 2 2 Potential business applications 3 ROI analysis 4 Computer simulations of the most important applications
Understanding Players OHIO RIS USCGUSACE PPC Shippers/ Receivers Barge Lines Terminal Operators
Proposed Network
European RIS Features Waterway Charges & Dues Fairway Information Services Traffic Management Calamity Abatement Service Port &Terminal Management Cargo Management
RIS Features Fairway Information Services Provide information about the use and status of the inland waterway infrastructure Support strategic navigation decision-making (plan and monitor a trip). Target User: Barge lines
RIS Features Traffic Information and Management Services Strategic/tactical traffic information Waterway administration for safe navigation Vessel Traffic Service (VTS) »Accidents prevention by means of shore based monitoring Lock and Bridge Planning »Reduction of waiting time and smoothing of the traffic flow Target User: Barge Lines, USCG
RIS Features Calamity Abatement Service Register vessels at the beginning of each trip and update data during the voyage In case of accident, immediate and expedited measures to rescue the vessels thanks to the data Target User: Barge Lines, USCG
RIS Features Port and Terminal Management ETA( Estimated Time of Arrival) information of approaching vessels supports the overall terminal utilization and smooth passage of vessels Reduction for transshipment time In case of insufficient terminal capacities, the terminal operator inform his Requested Time of Arrival (RTA). Target User: Barge Lines, Terminal Operator
RIS Features Cargo and Fleet Management Detailed information on the cargo transported Information on the vessels and the fleet Target User: Barge Lines, USACE
RIS Features Waterway Infrastructure Charges and Harbor Dues Use of voyage data to automatically calculate charge and initiate invoicing procedures Target User: Government
Project Plan Post Demo Review Demo ROI Identify Business Services Design Network Infra. Requirement Analysis Scope Definition
CMU River-Net Project Member List NameName (Eng)Cell Phone Sunkyung ParkSunny Sungju ChoJoe Yunsuh ChunYun Hyeon YuShawn Hyunsu JunSue Yi-Chan HoYi-Chan
Q&A