CEA - Irfu – Mois 2011 – 1 Cavity-string alignment experience in the EXFEL prototype cryomodule assembly Michel Fontaine CEA – SACLAY DSM/IRFU/SIS TTC.

Slides:



Advertisements
Similar presentations
Abstract Mechanical Inspection and Survey Steven Seiler, NSLS-II Project The Survey and Alignment Group is often the first and last to work with the Storage.
Advertisements

The Preassembling Installation Survey & Alignment Accelerator Center of IHEP Qu Huamin 2006 / 4 / 27.
Superconducting Spoke Resonator Cavities and Cryomodules
Status of the SPL cavities at CERN I.Aviles & N. Valverde on behalf of SPL team 1I. Aviles & N. ValverdeLund, 11 December 2013.
Alignment of DB and MB quadrupoles Hélène MAINAUD DURAND 17/11/2011 With a lot of input from Sylvain GRIFFET.
Workshop TS May 2008 GENERAL CLIC ALIGNMENT Progresses and strategy. Hélène MAINAUD DURAND, TS/SU/MTI.
MICE Collaboration Meeting March 29 - April 1, CERN MICE Integration Edgar Black/IIT March Room.
1 Institute of High Energy Physics 13/09/2010 Comparison and Study in Measurement Accuracy of Height Difference between Laser Tracker and Level Men LingLing.
Special Linac WG meeting: Assembly of the ISOLDE Cryomodules – HIE-ISOLDE Survey and Alignment – March 19 th 2014 Jean-Christophe GaydeEN/MEF-SU Guillaume.
1/9 Hélène Mainaud Durand Sylvain GRIFFET, 28/11/2011 BE/ABP-SU/ Adjustment of 4 Drive Beam Quads positions on TM0 CLIC girders EDMS Document No
DELTA Quadrant Tuning Y. Levashov, E. Reese. 2 Tolerances for prototype quadrant tuning Magnet center deviations from a nominal center line < ± 50  m.
LINAC 4 Project L4T/L4Z Design Status J.Humbert / B.Riffaud on behalf of EN-MME design team 1 st September 2011 LINAC4 – BEAM COORDINATION COMMITTEE B.Riffaud.
MQXF Cold-mass Assembly and Cryostating H. Prin, D. Duarte Ramos, P. Ferracin, P. Fessia 4 th Joint HiLumi LHC-LARP Annual Meeting November 17-21, 2014.
Tilt meter fiducial Guide rail Abstract This poster covers the survey and alignment techniques selected for installation of the SPIRAL2 accelerator devices.
Summary of WG 2 - cavities W. Weingarten 15th SPL Collaboration Meeting CERN - 25/26 Nov Cavity WG.
1 BROOKHAVEN SCIENCE ASSOCIATES Abstract Magnet and Girder Integration Lewis Doom, NSLS-II Project National Synchrotron Light Source II (NSLS-II) will.
LCLS-II cryomodule alignment. 2 Wednesday meeting, 6/17/2015 Topics Alignment of Components inside the CM Tunnel Network Tolerances LCLS-II cryomodule.
WP3 Required interfaces for cryostat design / integration Patxi DUTHIL SPL 3 rd Collaboration Meeting, CERN, Geneva November 12 th 2009.
FNAL Cavities for S1 Global Jim Kerby ALCPG 09. FNAL Deliverables Discussed in meetings 15/16 July and 10/11 Sept, and Webex and s 9/30/20092FNAL.
BEPCII Prealignment Installation Survey and Alignment Accelerator Center of IHEP Xiaolong Wang
D.Proch, DESY; GDE meeting Vancouver 06 Technical systems: Cavity Report Overview on costing activities for ILC –European costing method Overview industrial.
Summary ( Cryomodule, Plug-compatible Interface) Norihito Ohuchi.
Survey, Alignment and Metrology Fiducials Requirements Fabien Rey ESS Survey, Alignment and Metrology Group ACCELERATOR TECHNICAL BOARD 23/09/2015.
Survey, Alignment and Metrology Fabien Rey Pawel Garsztka ESS Survey, Alignment and Metrology Group.
Survey, Alignment and Metrology Fabien Rey Pawel Garsztka ESS Survey, Alignment and Metrology Group Interface Workshops for ESS Warm-Linac: ISrc - LEBT.
LASA Medium-β Cavity Progress Update Paolo Michelato 2 nd ESS Collaboration Meeting - SRF Elliptical Cavities 15 th December 2015.
Medium Beta Cavities Paolo Michelato, Paolo Pierini, and Carlo Pagani INFN Milano - LASA.
Medium beta cavities Paolo Michelato, Paolo Pierini, Carlo Pagani INFN Milano - LASA.
1 Stellarator Core Metrology issues NCSX WBS-1 Meeting April 2, 2003 What are we measuring? When? How do we take the measurements? How do we correlate.
Carlo Pagani University of Milano INFN Milano-LASA & GDE ILC and XFEL Cryomodules Preliminary thoughts for convergence ILC EDR Kick-off Meeting DESY,
MQXFB Plan for mechanical alignment measurements J.C Perez On behalf of MQXF collaboration team Special thanks to Jose Ferradas for his contribution MQXF.
Date 2007/Sept./12-14 EDR kick-off-meeting Global Design Effort 1 Cryomodule Interface definition N. Ohuchi.
SPL cryomodule specification meeting, CERN 19th October 2010 SPL cryomodule specification: Goals of the meeting SPL cryomodule specification: Goals of.
IRC/SAC status Venelin Kozhuharov for the SAC/IRC working group NA62 Meeting
SPS movable table Joanna Swieszek, Kurt Artoos (EN-MME) 14/04/2016.
C.MADEC - TTC meeting E-XFEL cryomodule assembly : prototyping phase at Saclay.
CW Cryomodules for Project X Yuriy Orlov, Tom Nicol, and Tom Peterson Cryomodules for Project X, 14 June 2013Page 1.
1 BROOKHAVEN SCIENCE ASSOCIATES 13th International Workshop on Accelerator Alignment October 13-17, 2014, IHEP, Beijing, China Smoothing Based on Best-fit.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Survey for SPL Dominique Missiaen BE-ABP/SU. Outline 12/11/2008 Dominique Missiaen BE-ABP-SU, Survey for SPL 2  Scope & Main Parameters  Technical Description.
Inner Triplet Review 1 H. Prin AT/MEL Activities on the triplets at CERN Reception and Acceptance Triplet String Assembly in Building 181 Handling and.
ESS Cryomodule Status Meeting – Introduction | | Christine Darve Introduction to Cryomodules for the ESS 2013 January, 9 th Christine Darve.
Third SPL Collaboration Meeting – CERN - 11 November 2009S. Chel 1 XFEL: cryomodule assembly at CEA/Saclay XFEL facility & Superconducting linac Main assembly.
Status of E-XFEL Module Assembly at Saclay
ALIGNMENT OF THE NEW TRIPLETS
CERN – Zanon discussions
Cryomodule test stand at ESS site
on behalf of the CLIC active pre-alignment team
at STFC Daresbury laboratory
T5.2: Harmonization - Material and Component Reference
DESY Experiences on Use of Gas overlay during Assemblies
Workshop on Tau-Charm at High Luminosity
Status of design and production of LEP connection cryostat
Definition of work flow for string DESY Example on critical operation
SPARC RF gun status by P. Musumeci Review committee
UK RFD Pre-Series cryomodule
Status of the PANDA Solenoid Magnet Production in BINP
The Storage Ring Control Network of NSLS-II
Alignment of the first two magnet system modules of Wendelstein 7-X
IHEP Cryomodule Status
On the accuracy of port assembly at Wendelstein 7-X
© 2004 – 2011 PAVAC Industries Inc. All rights reserved
Alignment of Main Linac Cryomodule (MLC)
SNS PPU Helium Vessel Design and Assembly
as a prototype for Super c-tau factory
System tests at CEA O. Piquet 19/03/2019
Adjustment of the 3 reference tables at building 180 AT960 measurement
SC1R Cold Box PDR Assembly Sequence
SNS PPU Cryomodule Design Overview
Simplified Procedure Draft
Presentation transcript:

CEA - Irfu – Mois 2011 – 1 Cavity-string alignment experience in the EXFEL prototype cryomodule assembly Michel Fontaine CEA – SACLAY DSM/IRFU/SIS TTC meeting at IHEP (Beijin) 12/07/2011

CEA - Irfu – Mois 2011 – 2 Alignment based on DESY process Cavities definition Mechanical axis definition Electrical axis characterization Module constitution Cold mass adjustment Beam axis frame definition : Helium pipe axis as longitudinal axis translated vertically Vertical axis based on gravity (given by AT401 or Nivel 20 at DESY) Temporary glued points measurement Cavity string alignment (within 0.1 mm from the theorical position) Final cold mass survey Module integration Vacuum vessel adjustment Cold mass adjustment Final module survey External references coordinates are given to the alignment team Thanks to M. Schlöesser M. Noak W. Benecke

CEA - Irfu – Mois 2011 – 3 Instruments and accuracy InstrumentAccuracyUse Laser tracker AT401< 20µm String adjustment, levelling Laser tracker AT901< 20µm String adjustment, Cavities’ measurement Optical level NA320µm Cold mass level adjustment Bubble level or inclinometer 0.1mm/m or 0.02 mm/m Cold mass and vacuum vessel vertical adjustment

CEA - Irfu – Mois 2011 – 4 Software : Spatial Analyzer overview Local network measurement to locate all instruments in the same frame Measured points with T probe Geometrical ly constructed axis points (fitting a circle)

CEA - Irfu – Mois 2011 – 5 Saclay’s specific task and strategy Specific task 1.Prototypes assembly and alignment based on DESY process 2.repeat 100 times a reliable process for serial production with a contractor 3.Data transmission to DESY for alignment in tunnel Strategy 1.Uniformity on survey processes 2.Increase repeatability on measurement 3.Data storage

CEA - Irfu – Mois 2011 – 6 Uniformity 1.Dedicated software for point measurement, calculation and data management 2.Special care on machining references : 1.Boreholes on cavities flanges designed by DESY 2.Centering plates for helium pipe placed at each extremity during the integration

CEA - Irfu – Mois 2011 – 7 Data Management Cavity points and axis from DESY Measurements from instruments Calculation Result file for alignment users QC data and reports SACLAY’S dedicated software

CEA - Irfu – Mois 2011 – 8 Status  PXFEL2_2 : beginning with new trackers and software OK  Survey of cavity string support for further inspections  PXFEL3_1: faster integration ok for operator and process Coming soon…  Centering plates and dedicated software tests  Boreholes on all cavities  Extremity points on valves machined instead of glued magnetic supports

CEA - Irfu – Mois 2011 – 9 Conclusion  Excellent collaboration between Saclay and DESY alignment team  An extensive use of laser tracker with T-probe gives more possibilities to the surveyor combining topography and MMT 3D metrology  Small tracker AT401 can be used instead of optical levels because of it’s compensators quality  To be continued… Software and database management operating soon

CEA - Irfu – Mois 2011 – 10 Discussion items 1.Tolerances 2.Facility 1.Temperature 2.air flow into the measurement hall 3.Mechanical design 1.Special care on machining measured points 2.Centering tools for repeatable measurement 4.Avoid invasive structure 1.Frames and shipping tools 2.Tubes and mechanical adjustment devices 3.Volume of tuning systems 4.Data storage 5.Shipping

CEA - Irfu – Mois 2011 – 11 Thank you for your attention