P. 1Mario Deile – TOTEMino: Status and Schedule Mario Deile 28.09.2006 1.Zone 2.Gas system 3.Cooling water 4.Cables 5.Safety 6.Schedule, Project Plan 7.Schedule.

Slides:



Advertisements
Similar presentations
Install L2 Switch Head End CATV
Advertisements

Walls crates cables gas chambers electronics CERN adb.
RD51 Common Test Beam: Status RD51 collaboration week Kolymbari, June 2009 Yorgos Tsipolitis NTUA.
29 November 2005A.Ciocio - SCTSG1 Type IV Cables and PP3 Status of Type IV installation Connector in situ work Status of PP3 Testing.
Experimental Area Meeting V. Bobillier1 Good connection to earth (in many points) of every metallic parts to be installed in the cavern is very.
Electrical Integration WBS Eric J. Mannel Columbia University Electronics Project Engineer VTX and FVTX.
P. 1Mario Deile – TOTEMino: Infrastructure Status and Schedule Mario Deile Zone 2.Gas system 3.Cabling 4.Cooling water 5.Counting-Room 6.Safety.
Electrical and Optical Cables Installation at P5 What When How H. Breuker
V. Bobillier1 Long distance cable installation status Calorimeter commissioning meeting.
Installation and Commissioning Planning Leslie Camilleri Calorimeter Commissioning Meeting 5 th September 2006.
Construction and Installation Readiness of TOTEM Roman Pots Detectors Federico Ravotti (PH/TOT) Gennaro Ruggiero (PH/TOT) LHCC minireview – 06 May 2009.
13 June 2013Laurent Roy Optical Fibers / Electronics Upgrade -Fibers need for Upgrade -> Installation ? -Two techniques possible for multi fibers installation.
PHENIX WEEKLY PLANNING 10/05/06 Don Lynch. 10/05/06 Weekly Planning Meeting 2 PHENIX Shutdown Overview Task_NameStart_DateFinish_Date PHENIX Shutdown.
Temporary irradiation facility at the CNGS beam D. Mcfarlane, T. Wijnands,
1 MuTRG-FEE Upgrade Status RIKEN/RBRC Itaru Nakagawa.
1 NSTX Outage - Plan 1. 2 NSTX Outage – Diagnostic considerations 2 1.Erik Perry will be the manager of the construction activities in the Test Cell.
Test beam setup: status report 31/03/2009 M. Alfonsi (CERN)
E.Guschin (INR,Moscow) 17 July 2007 CALO commissioning group meeting CERN Status of PS/SPD LED system.
K.WyllieElectronics meeting 29/05/061 RICH Power Supplies & Grounding Thanks to Johan Morant Paolo Baesso Xavier Le Gouard.
Pending mechanics issues for electronics/services (updated 18/08/05 by Ana) Fixation/shielding for 2 LV PS (no fingers):  - Clermont worked out a proposal.
Activities related to Experiments during TS3 and YETS th November, 2015 M. Bernardini, M. Barberan With the support of S. Chemli and Experiments.
R. Boyd 1 February  Dr. M. Saleem  D. Jana  M. R. Meera Labbai  R. Boyd.
Expt. Area meeting – December V. Bobillier1 Cabling installation status.
Single Module Tests (electrical) Inspect connectors and cables for visible damage C-measurement: make sure all pads are correctly connected HV test (1.5.
1 Onsite Status Itaru Nakagawa RIKEN/RBRC. 2 Schedule.
8/31/05DR Lynch1 HBD Preparations in the IR Don Lynch.
Summary Plans Content Module assembly at CERN and Dubna Readout DAQ Procurement Stacking Summary.
February 14, Comprehensive Review B. Schmidt Outline: Status and overview of activities: –Platforms and staircases –Muon Filters and beam plugs.
V. Bobillier1 Cable installation status.
HIGH RADIATION TO MATERIALS: EXPERIMENTAL AREA HiRadMat Users meeting, 14/7/2011 Outline  Location  Test zone  Test tables geometry and position  Services.
9/12/2003Ivan Hruska1 First box prototype –Box design in July ‘03 –Box produced during August ’03 Tested last week in few fingers Small changes necessary.
1 HBD Commissioning Itzhak Tserruya DC meeting, BNL December 13, 2006 Progress from October 3 to November 28, 2006.
Status of the NA62 network R. Fantechi 23/5/2012.
Saverio MINUTOLITOTEM Electronics W.G., 9 December T1 electronics status.
March 12 th 2013 Muon LS1 operation meeting1 Muon LS1 Status Outline Recap of last week P1 weekly schedule Muon related activities Open issues and discussions.
MEF - Machines & Experimental Facilities March 2013 Project meeting Activities in Linac4 tunnel and building in 2013 March 2013 Project meeting 14/03/2013J.Coupard1.
Totem Gas Systems ( T1, T2 ) F. Hahn and S. Haider PH / DT1.
T2 Status Report IP5 Installation Future plans. IP5 installation The mechanical structure has shown problems on installation and should be changed slightly.
The (prototype) C&V Framework component used for the SPD Cooling Control A.Tauro, G.De Cataldo.
Onsite Report Itaru Nakagawa RIKEN/RBRC. Schedule.
1 Chamber Interfaces Adalberto Readout-, I2C-, HV-, LV-, Gas- and chamber support interface. Space issues.
ELENA installation progress F. Butin / ELENA collaboration.
HF ROBOX PRR3 Apr 2003E. Hazen HF Front-End Electronics ● System Description – Overview – PMT Board, ROBOX, Patch Panel – Signal Cable, Front-end boards.
September 5, Burkhard Schmidt Integration and Installation Outline: Integration and Infrastructure issues -Suspended platforms -Cable chains -Beam.
Neutrino Platform Proximity Cryogenics 59th EHN1 Cryogenics Integration Redouan Abdennour, Johan Bremer, Michel Chalifour, Joaquim Creus, Aurelien Diaz,
Report Technical Director Storage-Ring-Installation Completed
Demineralised water cooling system
TOTEM Electronics Status
Neutrino Platform Proximity Cryogenics 72th EHN1 Cryogenics Integration TE-CRG
Cabling for LHCb Upgrade
LKr status R. Fantechi.
Distributed Optical Fibre Radiation and Temperature Sensing at High Energy Accelerators and Experiments Update on installation of DOFRS in PS-Booster.
Update of MVD services and requests
ProtoDUNE SP – Slow control Status
ELENA installation and commissioning status
Totem Gas Systems ( T1 , T2 ) S. Haider PH / DT1.
Discussion items SVD mechanics session.
Test beam organization, schedule, requirements and installation This is no talk rather a questionnaire! Installation to T9 Preliminary schedule What do.
RD51-WG X June test beam experience: useful information for October
CMS Area Working Group Meeting
T1 Electronic status Conclusions Electronics Cards:
EMU Slice Test Run Plan a working document.
WP02 PRR: Master Oscillator and RF Reference Distribution
Status of the cryogenic system for B180
Preparations for test of
Installation XFEL Tunnel WP 34
Pierluigi Paolucci - I.N.F.N. Naples
RPC HV&LV status Introduction HV power supply tender
Polarized 3He target installation
Electronic : PH0 (former IH0)
Presentation transcript:

p. 1Mario Deile – TOTEMino: Status and Schedule Mario Deile Zone 2.Gas system 3.Cooling water 4.Cables 5.Safety 6.Schedule, Project Plan 7.Schedule for 2007

p. 2Mario Deile – Zone Zone today =+ T2 gas rack + gas pipes + T2 cables.

p. 3Mario Deile – Zone

p. 4Mario Deile – Setup (Side View) Cables trays ready 1 ground line per tray (both connected to the 1 common ground of the area, no loops so far) power outlets on the 4 support pillars and on the fence X 2007 ( ) no readout

p. 5Mario Deile – Setup (Top View)

p. 6Mario Deile – Gas System Green: done by central supply group Blue: done by F. Hahn’s group Red: to be done by TOTEM T2 mixing + distribution rack in place; INOX and plastic pipes installed up to patch panel in zone; pipes from patch panel to T2 rack by end of this week.

p. 7Mario Deile – Cooling Water Under construction by Aldo Morelli and two technicians from Pisa / Siena. All parts available from CERN have been ordered and partially delivered. Still missing: plunging thermometers manometres flowmetres (to be ordered from company)

p. 8Mario Deile – Cables GEMino cables in place. RPino and CSCino cabling in progress (thanks to Frej and the Pisa / Siena Technicians). Connectors still undefined! Nobody to mount them! Optical fibers still need connector protections. Their installation might be delicate (specialist needed?)

p. 9Mario Deile – Safety ISIEC form submitted. “Initial Safety Discussion” took place on : no major problems, but after installations several inspections by specialists required Everybody needs to have attended the safety course (levels 1 – 3) within the last 5 years! Dosimeter badge needed to enter the counting-room!

p. 10Mario Deile – Schedule From now on weekly testbeam meetings: Wednesday, 14:00 h

p. 11Mario Deile – Planning ! ! ! ! !

p. 12Mario Deile – Schedule for 2007 Beam request to be submitted by 27. October (~1 month from now) SPS physics from 26. May to 11. November