Production Planning.  What to produce  When to produce  How to produce.

Slides:



Advertisements
Similar presentations
PowerPoint Presentation
Advertisements

Strategic Decisions (Part II)
Chapter 13 Production Planning. Chapter 13 Production Planning.
Chapter 12 Aggregate Planning.
PRODUCTION AND OPERATIONS MANAGEMENT
19–1. 19–2 Chapter Nineteen Copyright © 2014 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
Aggregate Planning.
Ardavan Asef-Vaziri Systems and Operations Management
OPERATIONS MANAGEMENT INTEGRATING MANUFACTURING AND SERVICES FIFTH EDITION Mark M. Davis Janelle Heineke Copyright ©2005, The McGraw-Hill Companies, Inc.
Manufacturing’s Objectives
Strategic Capacity Planning & Aggregate Planning
Aggregate Planning Ash Soni ODT Department Kelley School of Business.
Chapter 8 Aggregate Planning in a Supply Chain
Aggregate Planning. Overview Aggregate planning in the planning process Aggregate planning in the planning process Aggregate planning strategies Aggregate.
Section 4 part 2.  The Magnitude  In 1998, American companies spent $898 billion in supply chain related activities (or 10.6% of Gross Domestic Product)
Production Planning (Aggregate Planning). SOM 464: Manufacturing Resource Planning Study of the efficient allocation of resources (material, equipment,
Operations Planning Horizons
Chapter 13 Production Planning.
Purchasing:  The acquisition of goods and services needed to support the various activities of an organization, at the best possible cost and from reliable.
Aggregate Planning and Master Scheduling
Intermediate-range capacity planning Usually covers a period of 12 months. Short range Intermediate range Long range Now2 months1 Year Aggregate Planning.
Aggregate Planning and Master Scheduling Copyright © 2015 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior.
1 Slides used in class may be different from slides in student pack Chapter 16 Aggregate Sales and Operations Planning  Operations Planning Overview 
Ardavan Asef-Vaziri Systems and Operations Management
Operations Management Aggregate Planning
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 13 Aggregate Planning.
OM4-1Aggregate Planning Chapter 14. OM4-2Aggregate Planning Planning Horizon Aggregate planning: Intermediate-range capacity planning, usually covering.
Operations Management
© Wiley Chapter 13 – Sales and Operations Planning Operations Management by R. Dan Reid & Nada R. Sanders 4th Edition © Wiley 2010.
Chapter 13 – Aggregate Planning
Aggregate Planning.
Planning Horizons Today3 Months 1 year5 years Planning Horizon Short-range plans Job assignments Ordering Job scheduling Dispatching Intermediate-range.
Operations Management Aggregate Planning
© The McGraw-Hill Companies, Inc., DOM 511: Operations Mgt Practice Aggregate Planning.
Prepared By: Ali Siddiqi. Forecasting What is forecasting? The art and science of predicting future events Historical Data Intuition Combination of both.
Operations Management For Competitive Advantage 1 Aggregate Planning Operations Management For Competitive Advantage Chapter 12.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 10 Aggregate Planning and Master Scheduling
Operations Fall 2015 Bruce Duggan Providence University College.
12-1Aggregate Planning William J. Stevenson Operations Management 8 th edition.
12-1Aggregate Planning William J. Stevenson Operations Management 8 th edition.
3-1Copyright ©2013 Pearson Education, Inc. publishing as Prentice Hall. Course Code MGT 561 Supply Chain Management Book: Supply Chain Management Strategy,
Planning Horizons Today3 Months 1 year5 years Planning Horizon Short-range plans Job assignments Ordering Job scheduling Dispatching Intermediate-range.
Copyright © 2014 by McGraw-Hill Education (Asia). All rights reserved. 13 Aggregate Planning.
Chapter 13 Aggregate Planning.
McGraw-Hill/Irwin Copyright © 2011 The McGraw-Hill Companies, All Rights Reserved Chapter 16 Sales and Operations Planning.
14-1 McGraw-Hill Ryerson Operations Management, 2 nd Canadian Edition, by Stevenson & Hojati Copyright © 2004 by The McGraw-Hill Companies, Inc. All rights.
© 2007 Pearson Education Sales and Operations Planning.
Aggregate Planning and Master Scheduling McGraw-Hill/Irwin Copyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved.
Production Planning (Aggregate Planning). SOM 464: Manufacturing Resource Planning Study of the efficient allocation of resources (material, equipment,
Aggregate Planning and Master Scheduling Copyright © 2015 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 7 Aggregate Planning.
14-1 McGraw-Hill/Irwin Operations Management, Seventh Edition, by William J. Stevenson Copyright © 2002 by The McGraw-Hill Companies, Inc. All rights reserved.
Aggregate Planning. Session Break Up Aggregate Planning Master Production Schedule.
Chapter 12 With Woodruff Modification Sales and Operations Planning – Aggregate Planning Copyright © 2010 by The McGraw-Hill Companies, Inc. All rights.
© The McGraw-Hill Companies, Inc., OUTPUT PLANNING PROCESS Aggregate Planning.
LESSON 2 Sales and Operations Planning (S&OP) and Aggregate Planning
SALES AND OPERATIONS PLANNING AGGREGATE PLANNING PRODUCTION PLANNING OPERATIONS PLANNING How to meet effectively and efficiently forecasted requirements.
Master Production Scheduling (MPS)
Aggregate Planning Chapter 13.
Chapter 14 Aggregate Planning.
Operations Management
Chapter 8 Aggregate Planning in the Supply Chain
13 Aggregate Planning.
Chapter 8 Aggregate Planning in the Supply Chain
Chapter 3 Supply Chain Drivers and Obstacles
Chapter 8 Aggregate Planning in the Supply Chain
Dr Sh Salleh bin Sh Ahmad
Chapter 13 – Aggregate Planning
Production and Operations Management
Manufacturing’s Objectives
Presentation transcript:

Production Planning

 What to produce  When to produce  How to produce

Overview of Operational Planning Activities  Long-Range Planning ◦ Focuses on strategic issues relation to capacity, products, processes and plant location.  Intermediate-Range Planning ◦ Focuses on tactical issues pertaining to aggregate workforce and material requirements for the coming year (Aggregate Planning).  Short-Range Planning ◦ Addresses day-to-day issues of scheduling workers on jobs at assigned work stations.

Aggregate Planning Aggregate planning is medium -range capacity planning which typically covers a time horizon of anywhere from 3 to 18 months. The goal of aggregate planning is to achieve a production plan which will effectively utilize the organization’s resources to satisfy expected demand. Aggregate planning aims at an overall plan without Distinguishing products

 Aggregate production planning is done in an organization to match the demand with the supply on a period by period basis in a cost effective manner

Aggregate Demand Over all demand of different products and services, the company offers.

Aggregate Planning Strategies  Pure  Mix

Pure strategies are as follows  Building and utilizing inventory through constant work force  Varying the size of work force  Overtime utilization  Subcontracting

Mix Strategies  Mix strategies could be the combination of any pure strategies

Steps for Developing the Aggregate Plan  Step 1- Choose strategy: level, chase or hybrid  Step 2- Determine the aggregate production rate  Step 3- Calculate the size of the workforce  Step 4- Test the plan as follows:  Calculate Inventory, expected hiring/firing, overtime needs  Calculate total cost of plan  Step 5- Evaluate performance: cost, service, human resources, and operations

Aggregate plan for services firms Service organizations also use aggregate planning, some in exactly the same way with a manufacturing firm.  How many accounts we need to open  How many membership we need to sale  How many patient we need to serve

Master Production Schedule (MPS)

 MPS is product wise plan for manufacturing products Which product will produce at what time till what time

MPS specifies  The sizing and timing of production orders for specific items  The sequencing of individual jobs  The short term allocation of resources to individual activities and operations

Time Fences in MPS MPS is divided into 4 section based on time called time fence  1.Frozen-MPS cannot be changed except on extraordinary situation. After getting authorization from higher levels because costly  2.Firm – Change occur but exceptional situation  3.Full – All products are allocated to orders, Change makes production cost to be affected in less amount  4. Open – Not all production capacity has been allocated

In produce – to Stock  Order come from warehouse within company  Order based on future demand  Forecast play important role in demand management.  Lot size depend on economy In Produce- to order  Demand management is customer.  Lot size is also depending on customer order  Production is normally demand based

Production, planning and control systems  Three main types:  Pond draining system  Push system  Pull system

Pond-Draining Systems  Emphasis on holding inventories (reservoirs) of materials to support production  Little information passes through the system  As the level of inventory is drawn down, orders are placed with the supplying operation to replenish inventory  May lead to excessive inventories and is rather inflexible in its ability to respond to customer needs

Push Systems  Use information about customers, suppliers, and production to manage material flows  Flows of materials are planned and controlled by a series of production schedules that state when batches of each particular item should come out of each stage of production  Can result in great reductions of raw-materials inventories and in greater worker and process utilization than pond-draining systems

Pull Systems  Look only at the next stage of production and determine what is needed there, and produce only that items  Raw materials and parts are pulled from the back of the system toward the front where they become finished goods  Raw-material and in-process inventories approach zero  Successful implementation requires much preparation

End of Topic