Site lay out Tanks area Building area Unloading area GT21 GT22GT23 GT24.

Slides:



Advertisements
Similar presentations
Construction Method, Material Selection & Building Services
Advertisements

Total house building CO 2 emissions Design of a house civil/structural systems wall areas room volumes wall materials foundations framework access roads.
Measurement for Civil Engineering works
Innovative New Technologies in Building & Construction.
Tank 85 Foundation  View of poured auger pile.  Setting up for next pile.  This process repeated itself 310.
Progress Report 12/13/11. Progress Schedule December 2011 Work Completed December: Installed Concrete topping on roof Rough In M&E East side screen wall.
U.S. Customs and Border Protection Infrastructure Update Transportation Border Working Group October 27, 2010.
9/17/07 ILC Detectors 1 Conventional Utilities Tom Lackowski.
Design C a s t i n g E r e c t i o n F i n a l S t r u c t u r e D e s i g n C o n s t r u c t i o n P r o c e s s P r e–c a s t C o n c r e t e 3D M o.
McElroy Mine Shaft Explosion Investigation Summary This presentation is for illustrative and general educational purposes only and is not intended to substitute.
IWTP Facility. Holes Drilled for Detailed Blast Drilling and Blasting for final grade prior to construction in 2011.
Ms. Gripshover Landscaping Unit 18 INSTALLING PATIOS, WALKS, AND DECKS.
John James Audubon Bridge Main Span Materials and Equipment Cement from Thailand Structural Steel from Japan Oscillator from Germany Wind tunnel analysis.
Cassidy Elementary – Renovation Architect: Tate.Hill.Jacobs: Architects General Contractor: D.W. Wilburn, Inc. Substantial Completion Date:August, 2010.
Foundation Systems.
Sylvan Theater Column Restoration Project
AMS-02 tracker mechanics status of assembly and integration at UniGe Outer planes: - Tests of evaporator (cooling loop) integration - Tools to develop.
Industry information day INDUSTRY INFORMATION DAY Assembly & Installation Laurent Schmieder Buildings Infrastructure and Power Supplies Project.
Estimating Site work. Major Components Erosion & Sediment Control Fencing Clearing and grubbing Excavation Backfill Grading Trucking.
US ITER TBM Meeting Idaho Fall, Idaho, Aug M Dagher P Fogarty 1.TBM/ITER General Arrangement 2.Equatorial Test port Configuration 3.Test Port.
Street and Local Roads Inspection and Acceptance of Alternative Pavements.
Chapter 18 Foundations.
Prefabricated Timber Frame Construction
1 Summary of MICE beamline & hall installations This is a very rough summary of the progress since mid-December Richard Apsimon & Andy Nichols MICO meeting.
CONSTRUCTING HOMES & OTHER BLDGS. Preparing the Construction Site –Clearing the Site: the site must be cleared of anything that would get in the way of.
Eco-$mart, Inc Pre-panelized, steel reinforced, super insulated, poured concrete wall system.
Architect Drawing of New Entrance. Location Location of Phase II Construction Project – Old tennis courts west of the existing building.
1 5 December 2012 Laurent Roy Infrastructure / Electronics Upgrade -Cabling (long distance) -Rack and Crate (space, electrical distribution, cooling) -Detector.
Assembly Organisation and Duration. Work Site Organisation STORAGE SMA18 UNLOADING CLEAN ROOM CERN-SITE CLEANING MANUFACTURE DIRTY TRIAL ASSEMBLY ISO7.
Day 20 PRECAST AND PRE-STRESSED CONCRETE Pre Cast concrete comprise units that are made under controlled conditions, with necessary preparations for.
Progress Photos March Construction Progress Park Station Portal Shaft Excavation 16 March 2007 View towards South 16 March 2007 General views of.
Established in 1955 in Dunaújváros Produce m3 of concrete per year.
M&M Precast, Inc. Project: I-66 Highways for Life Location: Rt. 50 Ramp (East) off I-66 – Fairfax, Virginia VDOT Project No.: (FO) , M501 FHWA.
Commissioning Forms & Procedures ESCONDIDA CONSTRUCTION COMPLETION PHASE CIVIL PROCEDURES INSTRUMENTACION PROCEDURES Testing Test of Density In Field Z01.
BUILDING CONSTRUCTION
Storage Activities Nov Preparation for transportation of Turbines 2.
Floor Systems and Foundation Support
Footings & Foundation Prepared By: (Vanani Sanket) Department of Civil Engineering B.H.Gardi College of Engineering & Technology.
1 Design Review Meeting June 29, 2012 InterContinental Ceylan Istanbul Hotel Istanbul /Turkey Baghdad Company for Gas Turbines Ltd Baghdad Company for.
INVENTORY AND INSPECTION FOR GAS TURBINE COMPONENTS( GT22)
Leads Institute of Technology & Engineering
Concrete Lesson 2: Site Preparation
Foundation – jay Desai.
Structural Slab Analysis
Commercial Floor Systems
Prefabricated Timber Frame Construction
Temporary Works – P8 Project Practice.
TECHNICAL SPECIFICATION AND REQUIREMENTS
UPDATE ON DOE RUN ELEMENTARY CONSTRUCTION PROGRESS
UPDATE ON DOE RUN ELEMENTARY CONSTRUCTION PROGRESS
Residential Wall Systems
CITY OF AUSTIN Public works department date
INSTALLATION SEQUENCE
Residential Wall Systems
Total Fitness Gym By Student Architect Jhonatan Rubio
Minuteman Vocational Technical Regional High School Progress
Ramar-Hall Addition: 2017.
Building Frame (Column & Beam)
Commercial Floor Systems
Residential Wall Systems
Residential Wall Systems
Minuteman Vocational Technical Regional High School Progress
Collapse Patterns.
Commercial Floor Systems
Value of contract: Length of contract: Contract start date:
In-Class Scheduling Exercise
Minuteman Vocational Technical Regional High School Progress
Far Experimental Hall - Hutches
Community Practice Asset Management.
Polarized 3He target installation
Presentation transcript:

Site lay out Tanks area Building area Unloading area GT21 GT22GT23 GT24

Buildings in site E & control building Administration building Singles room building canteen

Buildings area in site Administration building canteen Single rooms building

Workshop area and internet camera Workshop area Internet camera1 Internet camera2

Tanks 81,82, 83 Tank No.81 Tank No.82 Tank No. 100

GTs area in site

Tanks area in site Tank LDO 071 Tank LDO 072 Tank Treated HFO 061 Tank Treated HFO 062 Tank LDO 073 Tank Treated HFO 063 Tank 051 Treated HFO Tank 052 Treated HFO Tank RAW HFO 042 Tank RAW HFO 041

Internal roads in site Road No.1 Road No.4 Road No.2 Road No.3

Unloading area position in site Unloading area

Tank No. Size of tank m3 Tanks Excavation Ground Compaction Backfilling and Compaction 4-10 sub base layers 1 st layer 2 nd layer 3 rd layer 4 th layer 5 th layer 6 th layer 7 th layer 8 th layer 9 th layer % % % % % % % % % % % % % % Tanks foundation works progress – Excavation & sub base layers compaction

Tank No. Size of tank m3 Backfilling and Compaction 4-10 sub base layers 1 st layer 2 nd layer 3 rd layer 4 th layer 5 th layer 6 th layer 7 th layer 8 th layer 9 th layer % % % Tanks foundation works progress –sub base layers compaction inside tanks area

Tanks foundation civil activities progress CuringPouring main Found. Wooden Formwork Instal. Rebar works Pouring lean concrete Achievement compaction Total Depth backfilling No. Tank 100% 1.4 m41 100% 1.4 m42 100% 1.6 m51 100% 1.6 m52 100% 1.4 m61 100% 1.4 m62 100% 1.4 m63 100% 1.4 m71 100% 1.4 m72 100% 2.03 m73 100% 1.3 m81 80%100% 1.3 m82 77%1.3 m %1.3 m90

Compaction 1 st layer sub base for inner area of tank 62

Removing wooden formwork for foundation of tank 81

Wooden formwork works for foundation of tank 82

Building Total Depth backfilling Excavation works Compaction 4 layers sub base Casting of Lean concrete Rebar works Pouring concrete 1 st layer 2 nd layer 3 rd layer 4 th layer Administration building 1 m 100% finished 40% Canteen building 1 m 100% finished 40% Singles room building 1 m 100% finished 100% finished Electrical & control building 1 m 100% finished Fire fighting building 1 m 100% finished Buildings foundation progress

Pouring lean concrete layer for foundation of admin building

Q.C test for lean concrete layer of admin building

Pouring lean concrete layer for foundation of canteen building

Q.C test for lean concrete layer of canteen building

Extra excavation for foundation of E&C building

curing Pouring concrete Wooden formwork Rebar works Lean concrete 4 th layer sub base comp. 3rd layer sub base comp. 2nd t layer sub base comp. 1 st layer sub base comp. Sub grade comp. Excavation NO 12%100% GT21 70%100% GT22 35%100% GT23 20%87%100% GT24 Main foundation installation progress of stacks

Rebar works for stack foundation of GT21

Rebar works for stack foundation of GT22

Rebar works for stack foundation of GT23

Rebar works for stack foundation of GT24

Main foundation curing Pouring main foundation Wooden formwork installation Rebar formwork installation Pouring lean concrete 4th layer sub base compaction 3rd layer sub base compaction 2nd layer sub base compaction 1 st layer sub base compaction Subgrade compaction Excavation NO 60%100% GT21 60%100% GT22 60%100% GT23 50%100% GT24 Fin Fan coolers foundation progress

Compaction 4 th layer sub base for fin fan cooler foundation of GT21

Compaction 4 th layer sub base for fin fan cooler foundation of GT22

Compaction 4 th layer sub base for fin fan cooler foundation of GT23

Ground compaction works for roads achievement 100% 1.Road No. 1 achievement 100% 2.Road No. 2 achievement 100% 3.Road No. 3 achievement 100% 4.Road No. 4 achievement 100% 5.Widening roads. 6.Compaction 1 st layer for road No.1

Excavation for foundation of PECC & CO2 for GT21

Excavation for foundation of PECC & CO2 for GT23

Installation boundary fence 1.1 st sub base layer compaction 100% 2.2 nd sub base layer compaction 100% 3.Pouring concrete for blinding level of foundation. 4.Pouring concrete to panels of fence. 5.Extract concrete panels from steel forms.

Boundary fence progress

Installing panels at north side of fence

Installing bases at east side of fence

Installing columns at east side of fence

Mechanical works 1. Stack pre assemble Stack support shaft for GT21 (100%) Stack support shaft for GT24 (100%) Stack support shaft for GT24 - fabricating works for gangways (40%) Stack thermal shield for GT21 (1%) (hold) Application of stack support shaft for GT22 ( 60%) Application of stack support shaft for GT23 (95%) Transition duct GT21 70% Transition duct GT22 50% Transition duct GT23 50% Transition duct GT24 30% Protection duct GT21,GT22,GT23,GT24 (50%)

Stack Pre Assemble remarksProtection duct Transition duct Thermal shield Support shaft Stack no. 50%70%hold100%GT21 50% hold60%GT22 50% hold95%GT23 50%30%hold100%GT24

Welding horizontal joints for stack support shaft of GT23

Welding vertical joints for stack support shaft of GT22

Fabrication works for stack support shaft of GT23

Welding works for stack support shaft of GT23

Fabrication works for stack support shaft of GT22

Q.C test for vertical joints of stack support shaft for GT22

Mech. Daily Progress Report 1-Dec-12 Site:- Haydaria site Mechanical Engineering Department Date: 1-Dec-12 Mech. Daily Progress Report Arrival Time:7:00 AM Departure Time: 5:00 PM Overtime:0Hours TAEngineerForeman MCH. Technicians WELDE R laborsTotal Mech. Manager Signature TA ZEKI AL SAADI

MECHANICAL ACTIVITIES Activities Minister of Electricity Visit Store 1- Inventory of the generator accessories Unit Transport of the exhaust frame parts 2- Installation of the extension duct 3- Preparations to install the Aux. compartment Unit Preparations to install the extension duct Unit Installation of the upper exhaust plenum Unit Preparations to install the extension ducts 2- Installation of the upper exhaust plenum

Minister of Electricity Visit

Store

Inventory of the generator accessories

Unit 21

Transport of the exhaust frame parts

Installation of the extension duct

Preparations to install the Aux. compartment

Unit 22

Preparations to install the extension duct

Unit 23

Installation of the upper exhaust plenum

Unit 24

Preparations to install the extension ducts

Installation of the upper exhaust plenum

Preparation for installing generator of GT21

Preparation of installation aux. comp

Installation aux. comp for GT 24

Installation aux. comp for GT 23

Installation aux. comp for GT 22

Installation aux. comp for GT 21

Grounding grid laying for stack of GT24

Fabrication electrical service boards

Maintenance for sockets & lighting

Preparation to do the Inspection thermo shied

inspection and inventory for EXTENSION EXHAUST for GT23 and GT 21

inspection and inventory for transition duct for GT 24,21

inspection and inventory for Generators parts boxes for GT21,22,23,24