MAVEN Planetary Protection Lead Bob Bartlett Mars Atmosphere and Volatile EvolutioN (MAVEN) Overall Approach to Planetary Protection Wednesday, October.

Slides:



Advertisements
Similar presentations
Ninth Lecture Hour 8:30 – 9:20 pm, Thursday, September 13
Advertisements

School for drafting regulations Nuclear Safety Decommissioning Vienna, 2-7 December 2012 Tea Bilic Zabric.
GLAST LAT ProjectLAT Engineering Meeting, April 1, 2003 GLAST Large Area Telescope: Performance & Safety Assurance Darren S. Marsh Stanford Linear Accelerator.
Software Project Transition Planning
Iterative development and The Unified process
Quality control of raw materials In-process control
LSU 07/25/2004Estimating Costs1 Estimating Project Costs & Time Project Management Unit, Lecture 5.
LSU 01/18/2005Project Life Cycle1 The Project Life Cycle Project Management Unit, Lecture 2.
Safety & Safety Documentation 2 3 Safety in three Questions Why ? Providing a safe workplace is a legal and moral obligation on every undertaking, and.
Radiopharmaceutical Production
Codex Guidelines for the Application of HACCP
FIELDS iCDR Solar Probe Plus FIELDS Instrument CDR Introduction 1Peter Harvey.
CCSB223/SAD/CHAPTER141 Chapter 14 Implementing and Maintaining the System.
Level 2 Unit 4 Producing Engineering Solutions Engineering Diploma Level 2 Unit 4 Producing Engineering Solutions This unit will give you the opportunity.
Project Management : Techniques and Tools (60-499) Fall 2014 / Winter 2015.
NIST Special Publication Revision 1
ExoMars PanCam Planetary Protection Alex Rousseau.
SENG521 (Fall SENG 521 Software Reliability & Testing Software Product & process Improvement using ISO (Part 3d) Department.
NASA’s Goddard Space Flight Center Systems Engineering Mike Pryzby Swales Aerospace August 16-17, 2005.
Product Development Chapter 6. Definitions needed: Verification: The process of evaluating compliance to regulations, standards, or specifications.
Planetary Protection: Background and Planning for PP Compliance Karen Buxbaum Mars Program Planetary Protection Manager Jet Propulsion Laboratory, California.
THEMIS Instrument CDR(1) UCB, April 19 & 20, 2004 Mission Assurance Critical Design Review Ron Jackson University of California - Berkeley.
BPA M&V Protocols Overview of BPA M&V Protocols and Relationship to RTF Guidelines for Savings and Standard Savings Estimation Protocols.
THE PROJECT LIFE CYCLE PROJECT MANAGEMENT LIFE CYCLE LSU 01/18/2005 PROJECT LIFE CYCLE 1.
IAEA International Atomic Energy Agency Methodology and Responsibilities for Periodic Safety Review for Research Reactors William Kennedy Research Reactor.
Solar Probe Plus A NASA Mission to Touch the Sun March 2015 Instrument Suite Name Presenter's Name.
SWEA Planetary Protection SWEA Peer Review March 28-29, 2010 IRAP, Toulouse.
Evaluate Phase Pertemuan Matakuliah: A0774/Information Technology Capital Budgeting Tahun: 2009.
TOTAL QUALITY MANAGEMENT
1 PDS MC Requirements Process March 29, 2007 (v2).
SRR and PDR Charter & Review Team Linda Pacini (GSFC) Review Chair.
Spaceweather Working Group Spaceweather Working Group Earth Science Mission Operations Eric Moyer ESMO Deputy Project Manager - Technical
1 MAVEN Breakup & Burnup Analysis for Planetary Protection M. Johnson LMSSC.
SwCDR (Peer) Review 1 UCB MAVEN Particles and Fields Flight Software Critical Design Review Peter R. Harvey.
UNEP Training Resource ManualTopic 9 Slide 1 No EIA EIA Required *Public involvement Scoping Mitigation and impact management EIA Report Proposal Identification.
SWEA Product Assurance SWEA Peer Review March 28-29, 2011 IRAP, Toulouse.
Camera PDR/CD1 Planning 19 September 2008
ANSI/EIA-748-B Earned Value Management Systems (EVMS)
Software Project Configuration Management
Gayle K. Martin November 14, 2016
Integrated Management Systems
Change Management V.N.Bhaskar Rao Engineering & Construction Director Amec Foster Wheeler India Operations.
Developing the Overall Audit Plan and Audit Program
Software Configuration Management
Planning Geomagnetic Disturbance Task Force (PGDTF) Update to the ROS
Mars Atmosphere and Volatile EvolutioN (MAVEN) Mission
Prepared by Rand E Winters, Jr. ASR Senior Auditor October 2014
Failure of Process / Failure of Mission
South Carolina Perspective on Part 61 Proposed Revisions
Flooding Walkdown Guidance
IS442 Information Systems Engineering
ISO 9001:2015 Auditor / Registration Decision Lessons Learned
2K CB FDR Overview:  Agenda, Charge, Review Process
Planetary Protection at ESA
This presentation document has been prepared by Vault Intelligence Limited (“Vault") and is intended for off line demonstration, presentation and educational.
Guidance notes for Project Manager
Planetary Protection Category II
Managerial Lessons Learned Do’s and Don’ts in Planetary Protection
Lockheed Martin Canada’s SMB Mentoring Program
HMI Reliability Dale Wolfe Reliability Engineer LMSSC*ATC*LMSAL
Operationalizing Export Certification and Regionalization Programmes
DOD’S PHASED SYSTEM DEVELOPMENT PROCESS
PSS verification and validation
Configuration Management
AUDIT TESTS.
REQUIREMENTS FOR MISSIONS towards europa
DOE Review of the LCLS Project October 2006
System Safety Regulation
DOE Review of the LCLS Project 7-9 February 2006
East Hall under construction
Presentation transcript:

MAVEN Planetary Protection Lead Bob Bartlett Mars Atmosphere and Volatile EvolutioN (MAVEN) Overall Approach to Planetary Protection Wednesday, October 20, 2010

2 With MPO and HQ approval, the MAVEN Planetary Protection Plan (PPP) was baselined and is under CCB control, MAVEN PM PLAN Planning is underway for the Planetary Protection Implementation Document (PPID), due 60 days prior to CDR. This document will establish the MAVEN process for demonstrating our compliance with the requirements of NPR C in accordance with the MAVEN PPP. Two activities will support planning for the PPID –Lockheed Martin has reviewed the MRO Breakup and Burnup (B&B) analysis to gain insights to the MAVEN B&B analysis which will be available later in Phase C. –Today’s instrument focused planetary protection tutorial to assist instrument planetary protection implementation planning and Planetary Protection Equipment List (PPEL) development. Status of MAVEN Planetary Protection Activity

3 Breakup and Burnup Analysis MRO was the first orbiter to use this methodology to satisfy PP requirements Spacecraft trajectory is modeled for atmospheric entry –Aerodynamics are either tumbling or stable –Points are identified where components would separate from main spacecraft Separate trajectories are initiated for each new object, all the way down to box-level Aerothermal heating is tracked for each object Thermal analysis determines temperature profile and whether item is sterilized during reentry –If the temperature reaches 500 o C or higher for at least 0.5 sec, it is considered sterilized (other criterion are under study for the PPO by JPL) This is sufficient for externally contaminated items Items with embedded organics may fail this criteria and carry their spore count forward to the final assessment Total spore burden is based on items that do not vaporize or reach sterilization temperature –These items may be subject to cleaning if needed –The Planetary Protection Equipment List provides the bioburden accounting

4 MAVEN Planetary Protection Plan (PPP) Complies with NPR C PPP Sections of particular interest for instrument developers: Section 4.0, Planetary Protection Requirement Pg. 15 Section 6.0, Approach to CompliancePg. 27 Section 7.0, Supporting Analysis (mainly B&B)Pg. 33 Section 8.0, Planetary Protection ReviewsPg. 39 –Typically associated with principal project reviews Section 9.0. Planetary Protection DocumentationPg. 39 –9.1, Planetary Protection Implementation Document –9.2, Pre-Launch Report –9.3, Post-Launch Report –9.4, Extended Mission Report –9.5, End-of-Mission Report –9.6, Documentation Schedule

5 Flow Diagram of the Bioburden Analysis and Reduction Process Some Programmatic Issues (cost & schedule) Generate Planetary Protection Equipment List Estimate Bioburden using C Revise Bioburden Estimate With DHMR or Other Mitigations Perform Breakup & Burnup Analysis Sterilized Element List Update Bioburden Estimate Bioburden Mitigation Bioburden Mitigation Launch Y N Breakup & Burnup Analysis Entry velocity & angle Structure degradation stable & tumbling Thermal analysis > 500 C for > 0.5 sec Ablation < 5 x 10 5 Launch Y N Modifying component flow through ATLO from a PP perspective Perform spore remediation as necessary < 5 x10 5 Accountable Spores Accountable Spores Further ATLO Remediation & Assay

6 High Level Working Schedule for Planetary Protection Implementation Jan-10Jul-10Jan-11Jul-11Jan-12Jul-12Dec-12Jul-13Dec-13Jul-14 Orbiter Breakup Module Burnup Module Spore Assessment MAVEN Assessment Assays Spore Mitigation Reporting & Reviews PDRCDRLAUNCH

7 General Planetary Protection Guidelines for Instrument Development Clean all subassemblies prior to system assembly using instrument developer’s practice and procedures (CCP) –This starts at the lowest level of assembly which is inspectable, such as a completed PWB or mechanical piece part. Assemble & Test in Class 10K or better (or suitably bagged), documenting any exceptions with a record of exposure times to worse environments. Bio Assay of a representative PWB just prior to installation; the assay results should be provided to the project as soon as practicable, typically 500 spores/m 2 or less. Ship in a sealed, clean package; on acceptance a bio assay will be taken of an external instrument surface to confirm no bio contamination occurred in transit

8 Plan Forward Lockheed Martin will undertake the MAVEN Breakup and Burnup (B&B) analysis following KDP C with the objective of identifying elements of MAVEN which may impact Mars without sufficient heating to be sterilized. Lockheed Martin will undertake development of the Flight Segment Planetary Protection Implementation Plan. Following PDR the MAVEN Planetary Protection Working Group (PPWG) has been looking in more detail at the issues related to instruments including bioburden, methods for bioburden reduction, and assays at the instrument sites. In Phase C the PPWG will undertake the development of the Planetary Protection Implementation Document, due 60 days prior to CDR. This document will establish the MAVEN process for demonstrating we meet the requirements of NPR C