Methods of Work Report Group Name: TP#10 Source: Enrico Scarrone, Telecom Italia, Meeting.

Slides:



Advertisements
Similar presentations
Doc.: IEEE sru Submission May 2014 Shoichi Kitazawa(ATR)Slide 1 Project: IEEE P Working Group for Wireless Personal Area Networks.
Advertisements

TP#2 Election Process Group Name: TP Source: Victoria Gray, ETSI, Meeting Date: Agenda Item: 6.3,
Release 2: Work Items best practices Group Name: TP15 Source: Scarrone Enrico, Telecom Italia Meeting Date:
Methods Of Work Ad hoc Report TP#11 Source: Enrico Scarrone, Telecom Italia, Meeting Date:
Requirements Overview Group Name: Technical Plenary (TP19) Source: Shelby Kiewel, iconectiv, Meeting Date: Agenda Item:
OneM2M Interop Test Event Announcement Group Name: TST 16.2 Source: Jiaxin Yin, Huawei Technologies Co., Ltd. Meeting Date: Agenda Item: TBD.
Report of Methods and Procedures Subcommittee Group Name: Steering Committee Source: Laurent Laporte, Sprint, Meeting Date:
WG-2 - ARC TP #16 Status Report Group Name: oneM2M TP #16 Source: WG2 Chair (Nicolas Damour – Meeting Date: Agenda.
HGI activities transfer to oneM2M Group Name: MAS Source: Patricia MARTIGNE (Orange), Deutsche Telekom, Telecom Italia Meeting Date: Agenda.
Work Programme Management Ad hoc Group Report Group Name: one M2M TP9 Source: Convenor WPM Joachim Koss, Gemalto M2M,
MoW&M&P Report Group Name: TP19 Source: MoW Convenor, Enrico Scarrone, Telecom Italia, Meeting Date:
Setting oneM2M’s Market direction
Guidelines for: Release Maintenance, Small Enhancement and Feature Work Items Group Name: TP15 Source: Mow Convenor, (Scarrone Enrico, Telecom Italia)
Work Programme Management Ad hoc Group Report Group Name: one M2M TP12 Source: Convenor WPM Joachim Koss, Gemalto M2M,
WG1 status report to TP#17 Group Name: oneM2M TP17 Source: Shelby Kiewel (iconectiv) Meeting Date: to Agenda Item: TP#17, Item 10.3,
Discussion on the problem of non- Blocking Synchronous mode Group Name: ARC WG Source: Yuan Tao, Mitch Tseng, Huawei Technologies Meeting Date: ARC 15.2.
Report of the oneM2M Legal Subcommittee Group Name: oneM2M Steering Committee Source: Thomas Goode, ATIS, Meeting Date:
Technical questions on oneM2M certification Group Name: TST Source: JaeSeung Song KETI, TST WG Chair Meeting Date: Agenda.
Timeline for the oneM2M Partnership Project Timeline and Milestones [Steve Barclay, ATIS] [Joachim Koss, ETSI] Contribution to oneM2M-Cons#4, 28 Mar 2012.
TP WG1 status report to TP#16 Group Name: oneM2M TP16 Source: Shelby Kiewel (iconectiv) Meeting Date: to Agenda Item: TP#16,
SEC Conference calls following TP#11 Group Name: WG4 (SEC ) Decision  Meeting Date: Discussion  Source: OBERTHUR Technologies Information.
Doc.: IEEE /XXXr0 Submission March, 2004 Matthew Sherman, BAE Systems Slide 1 LMSC Policy and Procedures Update Date: March 18 th, 2005 Author:
MoW&M&P Report Group Name: TP18 Source: MoW Convenor, Enrico Scarrone, Telecom Italia, Meeting Date:
Work Programme Management Ad hoc Group Report Group Name: one M2M TP7 Source: Convenor WPM Joachim Koss, Gemalto M2M,
WG-2 - ARC TP #18 Status Report Group Name: oneM2M TP #18 Source: WG2 Chair (Nicolas Damour – Meeting Date: Agenda.
Participation Ad-Hoc Legal Ad-Hoc Joint status. General General good progresses made on the document’s structure The two ad-hocs are meeting jointly One.
Release Timeline Discussion R2 and beyond Group Name: TP_WPM Source: Roland Hechwartner, WPM Convenor, Meeting Date:
Release Timeline Discussion R2 and beyond Group Name: TP_WPM Source: Roland Hechwartner, WPM Convenor, Meeting Date:
Timeline for the oneM2M Partnership Project Timeline and Milestones [Joachim Koss, ETSI] Contribution to oneM2M plenary, 14 Mar 2012 Doc: Source: [ETSI]
Doc.: IEEE /1523r0 AgendaRich Kennedy, MediaTek IEEE /15 Regulatory SC Atlanta DRAFT Meeting Plan and Agenda Date: Authors: January.
TST WG Progress Report at TP #20 Group Name: TP Source: TST WG Chair, JaeSeung Song (KETI) Meeting Date: to Agenda Item: TP20, Item.
WG5 – MAS#19 Status Report Group Name: WG5 MAS (Management, Abstraction & Semantics) Source: Yongjing Zhang (Huawei, WG5 Chair) Meeting Date:
ITU-R Liaison Group Report - Session #74 Opening Plenary IEEE Presentation Submission Template (Rev. 9) Document Number: IEEE L /0037 Date.
WG1 status report to TP#21 Group Name: oneM2M TP21 Source: Shelby Kiewel (iconectiv) Meeting Date: to Agenda Item: TP#21, Item 10.4,
Doc.: IEEE /0241r0 AgendaRich Kennedy, MediaTek IEEE /15 Regulatory SC Macau DRAFT Meeting Plan and Agenda Date: Authors: March.
WG 3 Progress Report at TP10 Group Name: oneM2M TP10 Source: Raymond Forbes, LM Ericsson, Meeting Date: to
WG2 - ARC TP #20 Status Report Group Name: oneM2M TP #20 Source: WG2 Chair (Nicolas Damour – Meeting Date: Agenda.
Feedbacks on oneM2M certification Group Name: TP Source: JaeSeung Song KETI, TST WG Chair Meeting Date: Agenda Item:
MoW Report Group Name: TP21 Source: MoW Convenor, Enrico Scarrone, Telecom Italia, Meeting Date:
TST WG Status Report to TP #21 Group Name: TP Source: TST WG Chair, JaeSeung Song (KETI) Meeting Date: to Agenda Item: TP21, Item.
SEC#2 Election Process Group Name: SEC WG 4 Source: Victoria Gray, ETSI, Meeting Date: Agenda Item:
Subscription and Notification Issue Group Name: WG2 Source: Qi Yu, Mitch Tseng- Huawei Technologies, Co. LTD. Meeting Date: ~23 Agenda Item:
WG5 – MAS#22 Status Report Group Name: WG5 MAS (Management, Abstraction & Semantics) Source: Tim Carey(Alcatel-Lucent, WG5 Vice Chair) Meeting Date:
WPM ad-hoc group report TP#20 Group Name: WPM (TP adhoc) Source: convener WPM Roland Hechwartner, Meeting Date:
Discussion on Certification Group Name: TST WG Source: JaeSeung Song, WG6 Chair, Meeting Date: TST #21.
爱迪科森 网上报告厅 WANGSHANGBAOGAOTING.  公司简介  发展历程  产品简介  2009 年新亮点  产品规模及内容  功能介绍及使用说明  产品特点  后台管理  制作系统  售后服务  公司资质  典型用户 目录.
MoW Report Group Name: TP20 Source: MoW Convenor, Enrico Scarrone, Telecom Italia, Meeting Date:
MoW&M&P Report Group Name: TP19 Source: MoW Convenor, Enrico Scarrone, Telecom Italia, Meeting Date:
IEEE 802 JTC1 Standing Committee Proposal for SC6 contribution process
WG1 status report to TP#15 Group Name: oneM2M TP15
WPM ad-hoc group report TP#25
RR-TAG (802.18) to Liaison Report
IGG Agenda 17th December 2009 Minutes from Previous IGG Meeting
Proposal for P&P Change - #2009-1
IEEE 802 JTC1 Standing Committee Proposal for SC6 contribution process
PAR Review - Meeting Agenda and Comment slides - Nov Orlando
RTA TIG Agenda Date: Authors: March 2019
IEEE IMT-Advanced Review Process
Report to 176th WP.29 session from the 34th IWG on DETA meeting
WNG SC Agenda Date: Authors: May 2019 July 2013
RTA TIG Agenda Date: Authors: March 2019
WNG SC Agenda Date: Authors: July 2017 July 2013
WNG SC Agenda Date: Authors: March 2017 July 2013
IEEE IMT-Advanced Review Process
WNG SC Agenda Date: Authors: July 2017 July 2013
WNG SC Agenda Date: Authors: March 2019 July 2013
WNG SC Agenda Date: Authors: November 2018 July 2013
WNG SC Agenda Date: Authors: March 2018 July 2013
Internet of Things (IoT) Work Group
TGs March Mid-Week Report
Presentation transcript:

Methods of Work Report Group Name: TP#10 Source: Enrico Scarrone, Telecom Italia, Meeting Date: Agenda Item: t.b.d.

Major Activities Meeting held: 19 March No updates of the MoW document MoW (ongoing): – Refinement of the Release process and treatment of documents among releases M&P (ongoing): – Finalization of the revision of the Procedures for the approval of WI: two proposal under discussion: General rule: consensus (which does not mean unanimity) and in case vote Approval based on minimum requirements of 4 supporting company See ppt in document SC – Change Request Template © 2013 oneM2M Partners 2

Future Meeting expectations – Finalize the ongoing discussion as identified in the previous slide – Document and clarify the use of normative/informative references – Expectation to meet every 2-3 weeks jointly with M&P (dates to be fixed depending on WGs calendar © 2013 oneM2M Partners 3