SAGE meeting Socorro, May 22-23, 2007 WIDAR Correlator Overview Michael P. Rupen Project Scientist for WIDAR & Software.

Slides:



Advertisements
Similar presentations
Thirteenth Synthesis Imaging Workshop 2012 May 29– June 5 Planning VLA Observations: Tutorial Michael P. Rupen NRAO/Socorro.
Advertisements

1 National Radio Astronomy Observatory EVLA Status -- Jim Ulvestad, for Mark McKinnon, Rick Perley, and the EVLA Team.
Ninth Synthesis Imaging Summer School Socorro, June 15-22, 2004 Cross Correlators Walter Brisken.
C. ChandlerEVLA Advisory Committee Meeting September 6-7, Scientific Commissioning Plan Claire Chandler.
Backend electronics for radioastronomy G. Comoretto.
Eleventh Synthesis Imaging Workshop Socorro, June 10-17, 2008 Cross Correlators & New Correlators Michael P. Rupen NRAO/Socorro.
From Idea to ALMA Project James Di Francesco Herzberg Institute of Astrophysics North American ALMA Science Center (thanks to Mike Rupen, Gianni Comoretto.
EVLA Early Science: Shared Risk Observing EVLA Advisory Committee Meeting, March 19-20, 2009 Claire Chandler Deputy AD for Science, NM Ops.
Technology and Functionality of the EVLA Correlator (Next Corr Workshop, June 27, 2006)
10 January 2006AAS EVLA Town Hall Meeting1 The EVLA: A North American Partnership The EVLA Project on the Web
Atacama Large Millimeter/submillimeter Array Expanded Very Large Array Robert C. Byrd Green Bank Telescope Very Long Baseline Array The Expanded Very Large.
Introducing the EVLA NRAO Postdoctoral Symposium, 29 April-1 May 2009 Michael P. Rupen Project Scientist for WIDAR.
April 19, 2007 EVLA Update1 The EVLA Project An Update Rick Perley National Radio Astronomy Observatory.
1 SAGE Committee Meeting – December 19 & 20, 2008 National Radio Astronomy Observatory EVLA Goals, Progress, Status, and Projections Rick Perley Mark McKinnon.
Correlator Growth Path EVLA Advisory Committee Meeting, March 19-20, 2009 Michael P. Rupen Project Scientist for WIDAR.
JVLA capabilities to be offered for semester 2013A Claire Chandler.
EVLA Transition to Science Operations: An Overview EVLA Advisory Committee Meeting, March 19-20, 2009 Bob Dickman AD, NM Operations.
Australian Astronomy MNRF Development of Monolithic Microwave Integrated Circuits (MMIC) ATCA Broadband Backend (CABB)
EVLA Software Bryan Butler. 2007May22EVLA SAGE Meeting2 Requirements and Goals of EVLA Software Maximize scientific throughput of the instrument At a.
ASKAP Capabilities John Reynolds on behalf of the SEIC and ASKAP team.
Sub-mm/mm Observing TechniquesThe EVLAAug 14, 2006 The EVLA Project Sean Dougherty National Research Council Herzberg Institute for Astrophysics Rick Perley.
P.NapierEVLA Advisory Comm, 14 Dec 2004 Project Overview Peter Napier, EVLA Project Manager Status 2003 Committee Response.
Brent CarlsonEVLA System PDR (Correlator V2) December 4-5, Correlator.
Tenth Synthesis Imaging Summer School UNM, June 13-20, 2006 Cross Correlators Walter Brisken.
1 SAGE Committee Meeting – December 19 & 20, 2008 National Radio Astronomy Observatory Correlator Status and Growth of Capabilities Michael P. Rupen Project.
Rick Perley 2 Nov 2001 EVLA Correlator Conceptual Design Review 1 Science Drivers for the EVLA Correlator Rick Perley EVLA Project Scientist 2 Nov 2001.
M.P. RupenCorrelator Face-to-Face Meeting 31 Oct 2006 Output Formats Part II Michael P. Rupen.
Atacama Large Millimeter/submillimeter Array Expanded Very Large Array Robert C. Byrd Green Bank Telescope Very Long Baseline Array The Expanded Very Large.
Atacama Large Millimeter/submillimeter Array Expanded Very Large Array Robert C. Byrd Green Bank Telescope Very Long Baseline Array EVLA Early Science.
ATCA GPU Correlator Strawman Design ASTRONOMY AND SPACE SCIENCE Chris Phillips | LBA Lead Scientist 17 November 2015.
Rick PerleyEVLA Advisory Committee Meeting September 6-7, 2007 Some Illustrative Use Cases Rick Perley.
M.P. RupenEVLA Advisory Committee Meeting September 6-7, Correlator Test Plan Michael P. Rupen.
M.P. RupenCorrelator Connectivity Scheme Review 31 July Correlator Specifications Michael P. Rupen.
M.P. RupenCorrelator Connectivity Scheme Review 31 July Scientific Impact Michael P. Rupen.
Frazer OwenNSF EVLA Mid-Project Review May 11-12, Transition to EVLA
10 January 2006AAS EVLA Town Hall Meeting1 The EVLA: A North American Partnership The EVLA Project on the Web
Master Correlator Control Computer (MCCC) Requirements & Status Sonja Vrcic Socorro, December 12, 2007.
M.P. Rupen, Synthesis Imaging Summer School, 18 June Cross Correlators Michael P. Rupen NRAO/Socorro.
WIDAR Correlator Options and Potential Craig Walker NRAO Socorro U.S. VLBI Technical Coordination Meeting May 14-15, 2007.
Imaging issues Full beam, full bandwidth, full Stokes noise limited imaging Algorithmic Requirements: –PB corrections: Rotation, Freq. & Poln. dependence,
Bryan Butler EVLA Computing Division Head
Surveying Cosmic Time with the WIDAR Correlator
Mark 5 / VLBA Correlator Topics
EVLA Availability - or - When Can I Use It?
EVLA Project Peter Napier
JIVE UniBoard Correlator (JUC) Firmware
ngVLA Correlator Drivers & Requirements
Pulsar Timing with ASKAP Simon Johnston ATNF, CSIRO
Monitor and Control Software
Correlator – Backend System Overview
EVLA Advisory Committee Meeting System Status
EVLA Correlator New Connectivity Scheme Software Impact Sonja Vrcic
EVLA Status and Prospects
EVLA System PDR System Overview
Rick Perley National Radio Astronomy Observatory
EVLA M/C Software PDR, 14 May 2002
Shared Risk Observing Claire Chandler EVLA SSS Review, June 5, 2009
VLA to EVLA Transition Plan
Some Illustrative Use Cases
EVLA Advisory Committee Meeting
Science Commissioning
Prototype Correlator Testing
Shared Risk Science with the EVLA
Mark McKinnon EVLA Project Manager
EVLA Advisory Committee Meeting, March 19-20, 2009
Prototype Correlator Tests on the Critical Path
Correlator Growth Path
EVLA Construction Status
VLA EXPANSION PROJECT Correlator Issues.
EVLA Advisory Panel Mtg. System Overview
Presentation transcript:

SAGE meeting Socorro, May 22-23, 2007 WIDAR Correlator Overview Michael P. Rupen Project Scientist for WIDAR & Software

2 SAGE meeting, May 22-23, 2007 Key EVLA Processing Capabilities Deep Imaging Polarization 8 GHz Bandwidth (dual polarization). Full polarization processing. Wide-field imaging. Narrow spectral lines Wideband searches 16,000 channels at max. bandwidth (BW). >10 5 channels at narrow BWs. Spectral resolution to match any linewidth. Spectral polarization (Zeeman Splitting). 8, 2 GHz wide bands. Each band - 16 tunable sub-bands. Sub-band – independent spectral resolution. Simultaneous line and continuum. Flexibility Many resources High time resolution 1000 pulsar “phase bins”. “Single-dish” data output to user instruments. Very fast time sampling (20  s).

3 SAGE meeting, May 22-23, 2007 Correlator Basics 32 stations Four 2 GHz (per pol’n) baseband pairs Two digital sampling modes (before the correlator): –Four streams of 8 2 GSamp/sec Used for low frequency bands (~S and below) where RFI is a major issue –Eight streams of 3 4 GSamp/sec Used for high frequency bands (~C and above) where broader bandwidths are available

4 SAGE meeting, May 22-23, 2007 Sub-band Filtering and Special Modes Each baseband is digitally sub-divided into 16 sub-bands –independently tunable to (almost) any frequency within the baseband –sub-band bandwidths (independently selectable): 128, 64, …, MHz –sub-bands stitched together digitally, with at most a factor 2 loss in noise at boundaries Highly flexible in trading total BW, sub-band BW, polarization products for frequency resolution (number of channels) Nearly limitless sub-arraying Pulsar phase binning and gating –At least as capable as any existing single dish VLBI-ready; phased array possible Special sub-band and phase array outputs available for specialized (user- built?) backends RFI excision –Sub-band by sub-band at very high time resolution –Channel by channel at 10s of msec time resolution Flexible programming of Correlator Backend Initially (2012) throttled to 25 MB/sec

5 SAGE meeting, May 22-23, 2007 Correlator – FIR Filter Each of 8 inputs, each 2048 MHz wide, is digitally divided into 16 sub-bands Gsamp/sec x 3 bits, or 2048 GSamp/sec x 8 bits. Sub-bands independently tunable in frequency, BW, frequency & time resolution, number of bits correlated Simplest mode: 16,384 channels over full bandwidth 16 multi-stage FIR filters Input data stream

16 digitally defined subbands for each of 8 inputs Max sub-band width = 128 MHz, min width = KHz Eight 2 GHz Inputs in Four Pairs 1R 1L 2R 2L 3R 3L 4R 4L Each column processed by one sub-correlator, providing 1024 channels Each sub-band independently tunable in freq, BW, dt, Nchan, …

7 SAGE meeting, May 22-23, 2007 Correlator Flexibility Flexibly trade resources between sub-bands and basebands –Increases resolution for one sub-band by up to a factor 256 Recirculation is available on all four* baseband pairs --> up to 4 million total channels/baseline – Presuming the proposed rewiring plan is accepted. Can trade sensitivity for channels (“wideband recirculation”) Simultaneous autocorrelations –Per baseband –Per sub-band

8 SAGE meeting, May 22-23, 2007 Timescale and Major Releases Now

9 SAGE meeting, May 22-23, 2007 Correlator Schedule Prototype correlator (4 stations, 2 GHz/pol’n) –Q2 2008: arrives at VLA –Q Q1 2009: On-the-sky testing Critical tests required before full production orders –PTC is a hardware/software testbed -- not intended for scientific use Limited-production hardware (12 antennas, ~2 GHz/pol’n) –Q2 2009: arrives at VLA –another (smaller!) WIDAR correlator to eMERLIN Correlator software (backend, ObsPrep, etc.) –Q1 2010: subset available for “regular” use Full correlator (32 antennas, 8 GHz/pol’n) –Q Q2 2010: installation and testing at VLA Gradual adding capabilities to limited-production hardware –Q Q1 2011: commissioning (turning off the VLA correlator)

10 SAGE meeting, May 22-23, 2007 Correlator Schedule Risk factors –Still testing correlator chip & prototype boards –Complex system with hardware and software tightly coupled –Schedule here bounded by possibility of board re-spin Capabilities are set by both hardware and software

11 SAGE meeting, May 22-23, 2007 Prototype Correlator Hardware/software development testbed 4 stations, 2 GHz/polarization Correlator hardware checkout: on-the-sky tests –Does WIDAR work as planned? Fringes; recirculation; 3- and 7-bits; sub-band filters; deep integrations; pulsar modes; phasing; … Subset of these tests required before full production orders Software testing and integration in the field –Correlator setup & control –Correlator Backend FT; averaging; smoothing; weights; SDM; … –Post-processing (CASA & AIPS) Visibilities & meta-data (Reading, displaying, sub-band stitching, …) Development & checkout –Wideband feeds –Wideband calibration & stability –RFI environment & excision

12 SAGE meeting, May 22-23, 2007 Limited Production Hardware 12 antennas, roughly 2 GHz/polarization Hardware arrives Q –Very aggressive schedule –Capabilities partly set by correlator-related software ==> still used for integration, testing, and checkout Limited correlator software available Q –Currently discussing whether we can get something up by Q Potentially very interesting scientifically –12 antennas (set by correlator hardware) –Roughly 2 GHz/pol’n bandwidth (set by correlator hardware) –14 independently tunable sub-bands within the 2 GHz –Each sub-band can have different channelization, and possibly pulsar phase binning –Thousands to hundreds of thousands of channels Gradually builds as full production hardware arrives