Insertion of 2 MBB with new coated vacuum chambers during technical stop week 35 J. Bauche for the SPSU study group, 24 June 2010.

Slides:



Advertisements
Similar presentations
P.-R. KettleMEG-Review February MEG Beam Line Studies  E5 Z-Branch NOW !!! NOW !!!
Advertisements

MICE VC 15/3/07Chris Nelson MICE Hall. Issues Realistically, I would expect D2 drawings to go for tender by end next week 23/3 but I hope we can use same.
Status of ATF/ATF2 and machine schedule in this fall Impact of the earthquake Recovery status, alignment Schedule in this fall N. Terunuma, KEK.
Costing Meeting Ajit Kurup 13 th June Page 2 Costing Meeting 13 th June 2011 Ajit Kurup Summary of CERN costing workshop. Proposed Level 3 breakdown.
All Experimenters’ Meeting January 09, Accelerator Operation Summary Calendar Week # 51 NuMI Weekly Integrated Intensity 8.81E18 protons BNB Weekly.
The Systems Development Lifecycle Your_Name_Here.
MuCool RF Status MICE Collaboration Meeting June 7-10, 2006, Fermilab A. Moretti June 9, 2006.
Vacuum, Surfaces & Coatings Group Technology Department Cleanness of the 3-4 cold beam lines Outline:  History: Status of 2009 cleaning  Foreseen and.
Machine Advisory Committee Review APS Upgrade Installation Plan and Schedule John Noonan November 15, 2006.
Carbon for SPS, state or the art and scrubbing runs, P.Chiggiato, P.Costa Pinto, P.Cruikshank, J.Ferreira Somoza, H.Neupert, A.Sapountzis, M.Taborelli,
SPS vacuum modification G.Vandoni SPS vacuum modification, 1.
Maintenance and Accelerator Support RHIC run10. Last Wednesday: Nice recovery Nice recovery Good work all especially: Good work all especially: HP, RF,
Claudio Bortolin. 1 st June: PT100 electrical connection failure (Temp Chiller water In&Out) 1) it required an access to the cavern to be fixed 2) access.
 A brief history of time  In the years BC.  My years at CERN  Current position  What is a Technical Coordinator?  The different type of intervention.
ATF2 Accelerator Status and Plans for JFY 2014 runs N. Terunuma, KEK.
QF1 vibration status A.Jeremie A.Jeremie, N.Geffroy, drawings by Araki-san.
Michel RAYMOND – April 14 th, 2011 Technical Support Activities in PH-ADO-PO Goals for 2011.
Paolo Guglielmini - TS / CV LHCb Install Meeting - 20/04/2005 LHCb Install Meeting 20/04/05 TS / CV / Detector Cooling Installations.
Status of and Installation Plan for DC Gas Control System and Target Work Scheduling Meeting 4 August 2006 PSI W. Molzon, Feng Xiao.
E. Richards EE Chamber installation. Summary Position Of the EE chambers General view of EEL chambers EEL5 chamber Installation of other chambers ex.
WEEK 1 You have 10 seconds to name…
NA61 11 October 2010Light Ion for NA61/ S. Maury1 Light Ion in SPS Foreseen to have primary Ar beam physics in 2012 Nothing runs in 2012 NA61 duty cycle.
WG2 (Proton FFAG) Summary G.H. Rees. Proton Driver Working Group  Participants: M. Yashimoto, S. Ohnuma, C.R. Prior, G.H. Rees, A.G. Ruggiero  Topics:
Maintenance Nov 28, Accelerator Access LINAC will remain on RA. It is not yet running. LINAC will remain on RA. It is not yet running. Booster-
Pressure data from SPS MDw35 H.Neupert, M.Taborelli For SPSU, 23/09/2010.
3:00. 2:59 2:58 2:57 2:56 2:55 2:54 2:53 2:52.
LIU-SPS e-cloud contribution to TDR Electron cloud meeting, 17/02/20141 o First draft by end of February Between 5 to 10 max pages per chapter, refer.
ECR - PSB: New KSW magnet in 16L1 Luis Feliciano, 4 th February.
SPSU – May 19, 2009 – Resources needed for SPS coating project– J. Bauche 1 Coating of the SPS Main Dipoles Vacuum Chambers: Resources Needed for Project.
All Experimenters’ Meeting November 25, 2013 Photo by Martin Murphy.
SPS BEAM DUMP UPGRADE FUTURE CABLING CAMPAIGNS Georgi Minchev Georgiev EN-EL-FC.
DA  NE: status report M. Preger on behalf of the DA  NE team 22/11/2010.
LSC 19 th April 2013 – SPS Magnet Test Campaign and Consequences for LS1 1 SPS Magnet Test Campaign and Consequences for LS1 J. Bauche*, P. Catherine,
Performed at Brookhaven National Lab for Fermilab Main Injector Electron Cloud Studies June 2009 Linda Valerio September 11, 2009.
ASTRID2 Niels Hertel Nov 2012 AARHUS UNIVERSITET ASTRID2 – Status ESLS XX Berlin 2012 Niels Hertel ISA, Aarhus University, Denmark 1.
SOLEIL OPERATION AND ON-GOING PROJECTS C. Herbeaux On behalf of SOLEIL Groups C. Herbeaux, November ESLS23, 24-25, 2015, PSI1.
Mechanical Upgrade Interaction Region IR1 Luigi Pellegrino Mechanical Engineering Group (LNF Scientific Committee, May 9, 2013)
SPSU M.Taborelli Results from MD week 45 Views of extracted liners and RF shields M. Taborelli for SPSU team.
LDR 531 Week 3 Summary R-531/LDR-531-Week-3-Summary For more details
Report Technical Director Storage-Ring-Installation Completed
Magnet activities in SPS during EYETS
LIU and TE/VSC activities Status September 2016 LIU-SPS aC coating & flange impedance reduction Paul Cruikshank on behalf of TE-VSC LIU & TE-VSC, 19/9/2016.
Teleconf ACS – FREIA 28th March 2017
CMS Luminosity Status Report
TE-MSC activities in SPS during LS2
SPS - EYETS 2016/17 Vacuum systems planning
EN-HE SPS works during EYETS
ELENA electron cooler and SEM grids status
SPS Planning for the EYETS Meeting 8 (07/12/2016)
Progress report on coatings for SPSU
TE-MSC activities in SPS during YETS
New SPS liners: the 2009 spring collection
Summary of Fuse Testing for Barrel Module Fuse Boxes
The situation for the coated magnets and what we learned in the LS1 installation: M.Taborelli, for TE-VSC.
EYETS septa status Septa activities TE/ABT Thierry Masson
Status of ATF/ATF2 and machine schedule in this fall
Top Fire Protection Services Ottawa available on Dubinskyconstruction
Mathew C. Wright January 26, 2009
Typical NC in Warm Modules Following X-ray campaign
MBBS in Russia Fees Call Us: , ,
MBBS in Russia for Indian Students Call Us: , ,
Characterization Update

SPS Planning meeting for LS2 #19 Vacuum sectors & Magnet campaign situation Antonio Grande EN-ACE 06-Mar-2019.
3 Week A: May 1 – 19 3 Week B: May 22 – June 9
Energy Changes and the IR
SPS Planning meeting for LS2 #25 Vacuum sectors status
SAME 15 existing quadrupoles (QFS, QDS, QFL)
SPS Planning meeting for LS2 #26 Vacuum sectors status
HAVING FUN 2nd May to 28th June 2011 Topic 5 - Having Fun.
Presentation transcript:

Insertion of 2 MBB with new coated vacuum chambers during technical stop week 35 J. Bauche for the SPSU study group, 24 June 2010

Accelerator Schedule v1.7 Access 19/07 from 8:00 to 20:00 Access from 30/08 - 8:00 to 31/ :00

Magnet exchanges for coating during TS week Uncoated magnet ‘Old’ coated magnet ‘New’ coated magnet Waterleak

ChronologyPositionMagnet INMagnet OUTMotivationStatus MBB 096MBB 273 Magnet maintenance + SPSU - test 'old' coating Magnet removal needed (waterleak) - Magnet insertion proposed MBB 085MBB 057SPSU - test 'old' coatingProposed MBB 289MBB 085SPSU - test 'new' coatingConfirmed MBB 015MBB 096SPSU - test 'new' coatingConfirmed QF 052QF 027Magnet maintenanceNeeded (waterleak) QD 159QD 182Magnet maintenanceTBC after repair during TS W29 3………Magnet maintenanceTBC if no more breakdowns until then… Summary of magnet exchanges foreseen during TS week 35