Lukens - 1 Contingency Reduction Review – 27 May 2005 The Run IIb CDF Detector Project Contingency Reduction Discussion Patrick T. Lukens Fermilab 27 May.

Slides:



Advertisements
Similar presentations
Budget Management. 57 Budget Management Budget Development Good scheduling skills and abilities Understanding of the project scope Well developed WBS.
Advertisements

US CMS DOE/NSF Review: May 8-10, US CMS Cost & Schedule Mark Reichanadter US CMS Project Engineer DOE/NSF Review 8 May 2001.
CDF Operations Bob Wagner, ANL May 09, 2005 All Experimenters’ Meeting.
CSSE Oct.2008 Monitoring and reporting project status Chapter 10, pages
Microsoft Project 2002 Sessions 5-6. Entering Tasks During this first session we will enter a set of tasks that comprise building a shed – data sheet.
Chapter 10 Project Monitoring and Control
Cost Management Week 6-7 Learning Objectives
Validating IPMRs, CPRs, and IMS Deliverables NAVY CEVM
W. Freeman, D0 PMG 25-Feb-03 1 Run IIb Schedule Status u Schedule Status u Update on near-term equipment expenditures u Budgeting Update u Summary.
October 24, 2000Milestones, Funding of USCMS S&C Matthias Kasemann1 US CMS Software and Computing Milestones and Funding Profiles Matthias Kasemann Fermilab.
Lukens - 1 Run IIb Project Motivations Integrated luminosity or duration of the run motivates us to  Replace the silicon detector - Radiation damage to.
Construction Accounting & Financial Management, 3/e Steven Peterson © 2013 by Pearson Higher Education, Inc Upper Saddle River, New Jersey All Rights.
9-1 Project Management from Simple to Complex. 9-2 This work is licensed under the Creative Commons Attribution-Noncommercial-Share Alike 3.0 Unported.
10/19/ :26 AM 1 Project Cost Control. 10/19/ :26 AM 2  Controlling involves making sure that the results achieved are in line with the planned.
Muon trigger upgrades, missing since not aimed towards DOE funding PHENIX upgrades: view presented to DOE R&D $3.5M Construction $16.6M Au-Au p-p 200 Si-Si.
Director’s Review 5/5/03 Spalding DRAFT RLS 1 Project Planning  Documentation to DOE June 1  DOE Review ~July 22 Documents Summary Project Overview,
DoE Review June 6, 2000 Cost Estimate  New Cost Estimate u Manpower Costs (Op. SWF) u Equipment Costs (Eq. M&S) u Contingency  Conclusions Mike Tuts.
1 EIR Nov 4-8, 2002 DAQ and Online WBS 1.3 S. Fuess, Fermilab P. Slattery, U. of Rochester.
Brenna Flaugher Sept. 24 th Lehman Review1 Run IIB Silicon Upgrade: Cost and Schedule Lehman Review Sept. 24, 2002 Brenna Flaugher Run IIB Silicon Project.
Project Setup and Execution For PMPlan Enterprise Presented by AlNik Solutions Copyright ©
US CMS DOE/NSF Review: April 11-13, Trig. - Estimate to Complete.
Introduction To Earned Value November 14, Definition Earned Value is a method for measuring project performance. It compares the amount of work.
Finance Roy Preece STFC RAL Oversight Committee Meeting 27 th November 2015.
OTE Building PMG Report October 25, 2012 Rhonda Merchut 1.
OTE Building PMG Report April 29, Agenda CDF D&D: J. Lewis OTE Building Project: R. Merchut Coordination State Activities Schedule Fiscal Summary.
CNGS Review 15 July 2003 M. Meddahi1 EVM for CNGS Definitions Pre-requisites Application to CNGS.
Project Management 1 Project Control. Project Management 2 Topics Project Control Status Reporting Earned Value Analysis.
Measuring Progress HNC Project Management. Measuring Schedule Performance Break project tasks up into small work units. Work units that are too large.
Area Covered. Work Done Quantity Financial Progress of work.
Title of presentation Name(s) of author / presenter / co-authors
Project Cost Management
Project Monitoring
TOPIC-8B- PROJECT COST CONTROL
Budget Planning.
CHAPTER:7 Project Cost Management
Earned Value Management
Project Management – PTM712S
IEVMC Lesson 8 FY14 Analysis Case Study Performance Management Analysis Tools Student guide page 8-5.
Overview of Project Planning
Cost Estimation and Budgeting
5. Cost resources & PLAN DURATION
Project Cost Management
Work Packages / Deliverables Completed
An introduction to Earned Value Management Simplex project management Education|Training|Mentoring|Coaching|Consulting.
Project Tracking Web Innovations 2017.
Progress and Performance Measurement and Evaluation
Cost estimation and budgeting
Project Genome Mapping
Earned Value Analysis It is a continuous comparison between the plan of the project data and the actual data. Budgeted and Committed Cost: Variance = Budgeted.
LSST Project EVMS Performance Overview Kevin E
An Introduction to Earned Value Performance Measurement
Implementing EV in IT A Three Step Approach John Chapman Touchstone Ltd
PROJECT COST MANAGEMENT
Project Cost Management
Preparations for a Lehman Review
Status, Misc Elton Smith Feb 21, 2003.
Earned Value Measures Planned Value (PV) Earned Value (EV)
Project Status Review Purpose: To anticipate prototype performance
فرآيند كنترل پروژه.
Controlling cost.
5. Cost resources & PLAN DURATION
5. Project PLAN & cost estimation
Mark McKinnon EVLA Project Manager
Project Cost Management
Linac Coherent Light Source (LCLS)
Project Management Life Cycle
Effective Project Management: Traditional, Agile, Extreme
Endstation Systems, Installation Costs and Schedule J. Hastings
Linac Coherent Light Source (LCLS)
Estimating Projects Estimating Types of Estimates
Presentation transcript:

Lukens - 1 Contingency Reduction Review – 27 May 2005 The Run IIb CDF Detector Project Contingency Reduction Discussion Patrick T. Lukens Fermilab 27 May 2005

Lukens - 2 Contingency Reduction Review – 27 May 2005 CDF’s Run IIb Projects Closeout of the Silicon Detector upgrade (WBS 1.1) Calorimeter upgrades (WBS 1.2)  Preshower replacement  Electromagnetic timing Data Acquisition and Trigger upgrades (WBS 1.3)  Upgrade of drift chamber TDCs  Upgrade of Level 2 trigger infrastructure  Upgrade of track trigger  Upgrade of the event builder  Replacement of Level 3 trigger processors  Upgrade of the silicon vertex trigger

Lukens - 3 Contingency Reduction Review – 27 May 2005 CPR for April 2005

Lukens - 4 Contingency Reduction Review – 27 May 2005 Obligations Report for April, 2005

Lukens - 5 Contingency Reduction Review – 27 May 2005 Completed Subprojects Silicon codes were closed at the end of FY04  Remaining BAC was returned to contingency in Feb 05 Calorimeter work is now complete  Codes are closed now.  One last P.O. (with MSU) was placed to close out the optical fiber work. Our baseline calorimeter cost was recently readjusted to cover all remaining closeout costs.

Lukens - 6 Contingency Reduction Review – 27 May 2005 Status of Remaining Subprojects Status of the DAQ subprojects as measured by costs:

Lukens - 7 Contingency Reduction Review – 27 May 2005 Adjustments in Cost Recently, we made the following corrections to our baseline: These changes were made after reevaluating the needs of each subproject. No additional use of contingency is planned at this time. Our budgeted cost represents our current understanding of the needs of the project.

Lukens - 8 Contingency Reduction Review – 27 May 2005 Project Costs, Funding All costs are in AY $K, and include G&A Additional contributed labor is required (but not included)  Physicists are not considered part of the project cost.

Lukens - 9 Contingency Reduction Review – 27 May 2005 Other tracking quantities We use the financial information available from the CPR and obligations reports to calculate other high level tracking quantities.  BAC – estimate of the total cost of the project at completion  EAC = BAC – BCWP +ACWP  ETC = EAC – ACWP + Contingency

Lukens - 10 Contingency Reduction Review – 27 May 2005 Cost Contingency Our cost contingency is calculated for the lowest level tasks in the schedules. Guidelines are as follows: DescriptionLevel Item is Complete0% Purchase order has been placed10% Engineering estimate, based on vendor information30% Physicist estimate, based on conceptual design50% Estimate based on experience100%

Lukens - 11 Contingency Reduction Review – 27 May 2005 Contingency Estimates We have recalculated our contingency needs at the task level. Guidelines are unchanged from our PMP. Today’s contingency estimate reflects the fraction of work done  Total is scaled by the percent complete, at the task level.  Details can be seen here: - In total, we then have three kinds of costs  Baseline  Adjustment to cost – anticipated uses of contingency - None at this time  Contingency – calculated on remaining work

Lukens - 12 Contingency Reduction Review – 27 May 2005 Forecast cost

Lukens - 13 Contingency Reduction Review – 27 May 2005 Cost Changes by Subproject Here are the cost estimates, comparing our new estimates with the baseline.

Lukens - 14 Contingency Reduction Review – 27 May 2005 Summary The calorimeter and Level 2 projects are in their closeout phase or near completion. Completion of some tasks and experience has given us better estimates for future costs, and reduced need for contingency. Contingency on remaining work has been recalculated in a “bottoms up” way. The project can be completed for a total cost of $8196K.