Onsite Work Summary RIKEN/RBRC Itaru NAKAGAWA. Completed Re-capacitation St-1, Gap-1 N&S Completed St-2 Terminators Install to South Oct.5 (except for.

Slides:



Advertisements
Similar presentations
Post Run13 MuTR/MuTrig Maintenance 1. Cathode Cable in mis-contact : South Station-1 Oct-5, Gap-2 2.
Advertisements

Recap Clamp 1008 and Production RIKEN/RBRC Itaru Nakagawa 1.
Supermicro © 2009Confidential MCP N installation guide Rech Weng.
MuTRG for Run12 RIKEN/RBRC Itaru Nakagawa 1. Run12 Schedule 14 Cryoweeks -> Mid Jan. ~ End of April GeV pp (2+3 weeks) GeV pp (1+6 weeks)?
MuTr/MuTrig Performance of Run13 RIKEN/RBRC Itaru Nakagawa 1.
ADTX Threshold Scan RIKEN/RBRC Itaru Nakagawa 1. Run13 ADTX Threshold Scan March 3, 2013 MUID1D HV=Run12 Nominal Setting MuTrig e-Log entry=#
MuTr Recapacitation RIKEN/RBRC Itaru Nakagawa 中川格 1.
PLC Based Interlock systems Workshop 4-5 December ITER Organization Headquarters - St Paul-lez-Durance-France ITER Central Interlock System: Central.
Recap Clamp Production and Installation RIKEN/RBRC Itaru Nakagawa 1.
Minimum Bias Trigger Scintillators (MBTS) a project of: CERN Dubna Michigan State University University of Texas-Arlington presented by J. Huston Michigan.
John Arthur Photon October 12, Photon Systems Update John Arthur SLAC 1.
Walls crates cables gas chambers electronics CERN adb.
Trigger Bias Study at Test Bench Data RIKEN/RBRC Itaru Nakagawa.
Absorber Design Concept RIKEN/RBRC Itaru Nakagawa 1.
SQXF 25 m Cable Practice Winding at LBNL Miao Yu Dan Cheng 10/31/2013.
MuTr Recap Status and Plan. Plan We are shooting for North Station-1 for post Run10 shutdown installation. Best scenario is to mount portable “clamp”
Optical Alignment System (OASys) Masters Thesis of Yuki Ikeda Rikkyo University Presented by Itaru Nakagawa RIKEN/RBRC 1.
Run10 Preparation Status and Issues Itaru Nakagawa RIKEN/RBRC.
SAM PDR1 SAM LGS Mechanical Design A. Montane, A. Tokovinin, H. Ochoa SAM LGS Preliminary Design Review September 2007, La Serena.
Control Building Fiber Preliminary Design Review December 5, 2001.
MuTr HV Optimization RIKEN/RBRC Itaru Nakagawa 1.
Cost for Large Liquid Scintillator Detector Ken Heller University of Minnesota Active Detector – Liquid Scintillator Target Material - Water Read Out –
Waveguide for Station 5 M. Yoshida (Osaka Univ.).
Run11 MuTrig-FEE Summary RIKEN/RBRC Itaru Nakagawa 1.
Camera Pieces in Box TV Battery Battery Charger Camera Sun shade.
GHP 2014 Avery Andrews Archish Chaturvedi Nandan Dave.
LBT Q Engineering Review PSPI: PEPSI installation preparation, includes all of the pier modifications.
MuTR/MuTrig Readiness for Run13 Itaru Nakagawa on Behalf of MuTrig/MuTr Group 1.
HIRADMAT tungsten powder experiment Presented by Ottone Caretta Presented by Ottone Caretta
1 MuTRG-FEE Upgrade Status RIKEN/RBRC Itaru Nakagawa.
Mass production and mechanical structure P. Pakhlov (ITEP)
Introduction to High Momentum Trigger in PHENIX Muon Arms RIKEN/RBRC Itaru Nakagawa 中川格 1.
1 South Arm Installation Plan Itaru Nakagawa RIKEN/RBRC.
LAB #10. Governor Control Arm Using a 10mm socket install the two bolts that hold the governor control arm. Finger tighten then torque to 100 “#
1 Polarimeter build up and details Robert Lee. 2 View 1 Material (Removable plate, leg supports and rail guide spacer): Aluminum Leg supports attached.
1 Onsite Status Itaru Nakagawa RIKEN/RBRC. 2 Schedule.
10/2/2002MJL - MuTr DC Report Muon Tracking Status South North.
Recap Clamp for MuTr Station-3 Itaru Nakagawa For the PHENIX Muon Trigger Upgrade Collaboration Especially credit to: Tsutomu Mibe (KEK) Yoshinori Fukao.
Onsite Status RIKEN/RBRC Itaru Nakagawa. OASys Light Source Spacer.
2011 Sept 14-16Ivo Polák, FZU, Prague1 LED notched fibre distributing system QMB1 single LED slice Ivo Polák, on behalf prague’s group 1.QMB1.
Recap Clamp Installation RIKEN/RBRC Itaru Nakagawa 1.
MuTrig-FEE Install Status RIKEN/RBRC Itaru Nakagawa 1.
Run11 MuTrig Performance RIKEN/RBRC Itaru Nakagawa 1.
DATA COMMUNICATION Lecture-25. Recap of Lecture 24  Cable Modems  Electromagnetic Spectrum  Transmission Media and its Types  Guided Media.
1 Installation Status Remaining Issues RIKEN/RBRC Itaru Nakagawa.
Onsite Report Itaru Nakagawa RIKEN/RBRC. Schedule.
Installing Branch Circuits Unit #32. What are Wiring Boxes? hold cable or conduit and protect connections attached to building contain all electrical.
LumiCal High density compact calorimeter at the ILC Wojciech Wierba Institute of Nuclear Physics PAS Cracow, Poland.
Preparation for Run10 RIKEN/RBRC Itaru Nakagawa. TLD badges (to be replaced every two weeks) Location of dosimeters in MuTr.S St.1 TK361 TK362 TK363 TK364.
System Test Assembly 20th Oct 2009 M. Kurosawa. Current Status Performed system test with new FEM and software. Visit VICRISE on 13th Oct. 2-L and 8-R.
USTileCal Planning UTA ITC Scintillator Project R. Miller May 13, E3 C10 B11 E1 D5 A14 - A15 B14 D6 A D4 A12 A13 B12 - B
Radiation Shutter Re-Purposing Roy Preece STFC RAL 18 th December 2014.
BM&N STS ladders assembly in VLHEP
Florian Buchsteiner (HEPHY Vienna)
OPERATION & INSTALLATION
4x8 Mosaic Camera Development
Plan for the installation of the TAMU screen
cooling and supports of the forward endcap EMC
LumiCal mechanical design, integration with LDC and laser alignment
CNRAD dosimetry and Summary of the TS
From: A Novel, Real-Time, In Vivo Mouse Retinal Imaging System
Z. Szillasi On behalf of GEM Alignment group November 15, 2017
Chapter 2 The Physical Layer.
(Preliminary) WIYN 0.9 Meter Collimation Procedure
RPC SYSTEM LAYOUT and DIMENSIONS
The light refracts at an angle f.
1.4 Pairs of Angles.
Welcome To Online Help 247 Learn to Set Up Arlo Camera With Solar Panel.
Goodman Acquisition Camera
Presentation transcript:

Onsite Work Summary RIKEN/RBRC Itaru NAKAGAWA

Completed Re-capacitation St-1, Gap-1 N&S Completed St-2 Terminators Install to South Oct.5 (except for 2 inner ones of Gap-1 and 2) and 8. Recap Clamp Test

This screw hole needs to be Slightly shifted Spacer Incompatibility in South Mike will work on this.

Fiber Scope Small diameter  =6mm Focus 20 ~ 80 mm Side mirror ~54,000Yen ~10mm pad Scope angle

デモ版アリ 郵送2週間/ショールームならすぐ

無料お試し申し込み済み

Schedule

Mike: Station-1 terminal Install, South Spacer

Re-connect South Optical Fiber Cables & Check Threshold test South St-3, Oct-7, Brd-1 Toggle Switch OASys N2 Camera Debugging South Camera Check Light Source Mount w/ spacer Recap Clamp Install to North St-3 Re-connect South Optical Fiber Cables & Check Threshold test South St-3, Oct-7, Brd-1 Toggle Switch OASys N2 Camera Debugging South Camera Check Light Source Mount w/ spacer Recap Clamp Install to North St-3

November

December