7/8/20161 Pixel detector status and infrastructures Pixel detector status and infrastructures G. Bolla.

Slides:



Advertisements
Similar presentations
COBRA Status W. Ootani MEG Review Meeting Jul. 18th, 2007.
Advertisements

CMS Pixel Technical Board Meeting – Dec. 16, Forward Pixel Cooling System Information Joe Howell.
CV activities on LHC complex during the long shutdown Serge Deleval Thanks to M. Nonis, Y. Body, G. Peon, S. Moccia, M. Obrecht Chamonix 2011.
Introduction to Engineering Lab 4 – 1 Basic Data Systems & Circuit Prototyping Agenda REVIEW OF LAB 3 RESULTS DEFINE a DATA SYSTEM  MAJOR TYPES  ELEMENTS.
Claudio Bortolin. 1 st June: PT100 electrical connection failure (Temp Chiller water In&Out) 1) it required an access to the cavern to be fixed 2) access.
Concept idea for the modular 2PACL system for the Atlas ITK 3 June 2015 Bart Verlaat 1.
19 May 09P. Tropea1 Fluorocarbon systems –SS1 hydraulics completed, now under commissioning –SS2 connections and sensors installation done –Pixels ready.
CPPM Pixel Evaporative Cooling Plant Description & Operation with C 3 F 8 or C 4 F 10 G. Hallewell, CPPM, Feb 07, 2005.
DSS  Informal review Tuesday 24 th October 10:00 Room , organized by Laurent Roy.  Subsystems will not be allowed to run overnight or at weekends.
TK Dry Gas System Operation  System overview  Dry Gas Consumption  Interlocks and thresholds  Documentation  Operational model  Final comments.
D0 Status: 01/14-01/28 u Integrated luminosity s delivered luminosity –week of 01/ pb-1 –week of 01/ pb-1 –luminosity to tape: 40% s major.
André Augustinus 9 October 2006 Interlocks update.
CMS Proposal for a Maintenance & Operation agreement with EN/CV/DC for fluorocarbon detector cooling circuits v.2 P. Tropea For the CMS experiment.
1 OperationsOperations CSC is stable running since HI run has started. The low CSC occupancy in HI running allows us to operate all HV channels at nominal.
R. Boyd 1 February  Dr. M. Saleem  D. Jana  M. R. Meera Labbai  R. Boyd.
Overview of the main events related to TS equipment during 2007 Definition Number and category of the events Events and measures taken for each machine.
9/17/2008TWEPP 2008, R. Stringer - UC Riverside 1 CMS Tracker Services: present status and potential for upgrade Robert Stringer University of California,
TS-CV-Detector Cooling 22-Jan-04P. Tropea - JCOV1 Design, construction and installation of a double loop fluorocarbon 150 kW cooling plant for the CMS.
CMS consolidation activities of detector cooling system Detector cooling project P. Tropea.
I & C.
Phase 1 FPix Cooling Tube Testing Erik Voirin, C.M. Lei, Harry Cheung, Stefan Gruenendahl (FNAL) Kirk Arndt, Qiuguang Liu (Purdue) Phase 1 FPIX cooling.
The InGaAs IR Array of Chunghwa Telecom Laboratory Chueh-Jen Lin and Shiang-Yu Wang, Optics and Infrared Laboratory In 2006, Advanced Technology Laboratory.
Shutdown plans for the FPIX 27/01/2009 Mauro Dinardo University of Colorado – Boulder, USA Mauro Dinardo University of Colorado – Boulder, USA Pixel General.
R. Fantechi. Shutdown work Refurbishment of transceiver power supplies Work almost finished in Orsay Small crisis 20 days ago due to late delivery of.
G. Bolla For the CMS Pixel Group 2/25/20161 Status at P5 and infrastructures (mainly cooling) Status at P5 and infrastructures (mainly cooling)
Tracker Goals o Main issue is to be able to run cold as more radiation is accumulated. o Due to “uncontrolled” humidity behavior, our present limit is.
CV Industrial Control SystemsJCOV Meeting October 23, 2003 ST/CV ACTIVITY Industrial Automation ST/CV is responsible for the design and implementation.
Claudio Bortolin. pump: replaced outlet filter: replaced demineralized cartridge: replaced mechanic filter on air control: replaced SSD chilled water.
Tracker cooling status General status Production: Manifolds, Distribution lines Work at P5 Plan Conclusions 19/05/091E. Focardi.
Pixel Action Matrix C. Newsom July 15, Overview Critical Parameters Initial Discussion – Top 6 critical failures Discussion - Detailed Documentation.
TRIPLEGEM and VFATs at The Test Beam Area TRIPLEGEM and VFATs at The Test Beam Area N. Turini……reporter Eraldo Oliveri! Eraldo Oliveri main worker! N.
MVD COOLING STATUS-PAST AND UPDATES PIXEL COOLING PROJECT: -STUDIES and TEST on MATERIALS (Carbon Foam) -THERMAL FEM ANALYSES and TEST on DISKS and STAVES.
V Thermo-siphon Workshop Test protocol Jan Godlewski PH/DT-PO On behalf of thermo-siphon working group
MVD COOLING STATUS COOLING PLANT UPDATE: -ADDITION of the NEW CIRCUITS FOR GBT AND DC-DC Converter BOARDS IN THE COOLING PLANT -THERMAL STUDY OF GBT AND.
Arnd Meyer (RWTH Aachen) Sep 8, 2003Page 1 Integrated Luminosity Total data sample on tape with complete detector > 200pb -1.
1 04 April 2007 L. Roy Detector Safety System for infrastructure - General fire detection (barracks, cavern) - Sniffer system (smoke detection above the.
ECAL Shift Duty: A Beginners Guide By Pourus Mehta.
Detector Safety System overview DSS is a PLC based system designed to protect ATLAS detector from damages. Front end (hardware) 2 redundant PLC ~700 input.
SCADA Supervisory Control And Data Acquisition Pantech Solutions Here is the key to learn more.
MVD COOLING STATUS COOLING PLANT: -UPDATE of THE HYDRAULIC SYSTEM -INTEGRATION OF THE MVD COOLING CIRCUIT PATHS INSIDE THE PANDA AREA -DEFINITION OF THE.
S A Griffiths CM42 June 2015 Electrical & Control.
European Organization for Nuclear Research - Organisation européenne pour la recherche nucléaire CO 2 IBL plant failures 16/06/ /06/2016 O.Crespo-Lopez.
MVD COOLING STATUS MVD COOLING PROJECT: CHOICE of COOLING FLUID,
STATUS OF KLOE F. Bossi KLOE GM, ROMA Nov. 13/14.
Uppsala University Contract UH2015/09 - UA2016/05 Job nr. 5973
LBDS TSU & AS-I failure report (Sept. 2016)
Internship final presentation
Rosario Turrisi INFN Padova
Commissioning and Calibration Strategies for Micromegas Vertex Tracker
GaAs Photocathode Development
Uppsala University Contract UH2015/09 - UA2016/05 Job nr. 5973/7200
Christian Veelken last updated 11/09/06
Pixel cooling specifications
Part II: Integrated Design of Infrastructures
Tracker cooling loop “check out” draft for discussion
Pixel DQM Status & Plans
the CERN Electrical network protection system
CV maintenance works during YETS
DT Infrastructure: LV, HV, Gas
August 23, 2000 R.N. Dubois Dow Chemical
Loop Water Controller Overview
A Study of the Tracker DCS
NAF Product Training.
Tuesday August 21, 2018 (Lab Safety).
Automation and Mechanization Assessment Template
SVAC Configuration Verification
Ola Ingemansson Electrical & Instrumentation Engineer
Operation of Target Safety System (TSS)
CSC DSS Status Report by Fred B.
CSC Shift Training and Operation + B904 Status
Presentation transcript:

7/8/20161 Pixel detector status and infrastructures Pixel detector status and infrastructures G. Bolla

Pixel detector status 7/8/20162Gino Bolla Tracker day Same as last meeting! (Skip the next two slides) BUT There is a new problem in FPIX: Started last Friday. It involves up to 5 ROGs. It is recoverable with a configuration. Mauro is following up and will present a few slides after me. (I better be quick)

Pixel detector status (FPIX) 7/8/20163Gino Bolla Tracker day Since Re-installation Newly developed The newly developed problems are all of the same kind and on the same readout group. There is a dedicated presentation toward the end of the meeting. BPIX at 97% during CRAFT 09

Pixel detector status (BPIX) 7/8/20164Gino Bolla Tracker day Since Re-installation Newly developed BPIX at 99% during CRAFT 09 The newly developed problem is likely to be solved by swapping the FED.

Pixel cooling 7/8/20165Gino Bolla Tracker day Running stable at target Temperature (4 deg C) since last Thursday. Work during the shutdown: Inserted the new quadrelli ( Interface between actuators and valves ) for long term reliability) Added position sensors on critical Valves (reliability). Improved/deployed/tested new PLC code (Automation of manual procedures) Came back after 16 days OFF without any special action (Just turn ON) Change the mech. Interface between actuators and valves. Flowmeter in pixel-loop-2 (BPIX) is reading with bigger noise and offset. Paola and EN-CV are investigating (Strip works has priority) Still to do: Exchange the filters in the cooling plant (they are now missing the gaskets) Evaluate the results of the chemical analysis of the fluid sample.

FLOW-meter misbehaving 7/8/20166Gino Bolla Tracker day NowBefore

Other work during September shutdown 7/8/20167Gino Bolla Tracker day Taken data at about 6% humidity for a couple of days for HMX calibrations. Changed filters in the racks cooling circuits Cleaned Heat Exchangers in the Racks. Exchanged turbines in the CAEN Racks.

Pixel maintenance place at P5 7/8/20168Gino Bolla Tracker day I attended this meeting on September 15 th. I posted to tech-coord our general specifications. (Thx to Mauro, Pasquale etc… for helping me out) Nothing is moving. Austin is still trying to understand what can actually be done with the buildings at P5 (French authorities involved). It is not yet clear what is the general plan of Austin. The “Crystal room” might not end up to be our place. There might be a bigger clean room to accommodate Pixel BCM Pre-shower

Important dates in the near future: 7/8/20169Gino Bolla Tracker day Today (in parallel) Tech-coord review of handout to central DCS. October 13 th TSS (Tracker safety System) review This includes our response to power cuts etc… October 20 th (to be confirmed) TK Operation procedures with beams and general Tracker Operation Procedures.

Cooling work during September 7/8/201610Gino Bolla Tracker day