Progress with Zeuthen Meeting Actions Jim Clarke ASTeC, STFC Daresbury Laboratory.

Slides:



Advertisements
Similar presentations
A Study of Mechanical and Magnetic Issues for a Prototype Positron Source Target The positron source for the International Linear Collider (ILC) comprises.
Advertisements

30/10/09 Positron Workshop 1 Future Work Plan, Action Items, Future Meetings Jim Clarke ASTeC & Cockcroft Institute Daresbury Laboratory.
Ian Bailey University of Liverpool / Cockcroft Institute Target Design and Photon Collimator Overview EUROTeV: WP4 (polarised positron source) PTCD task.
ILC Positron Source Update Wei Gai Posipol ILC RDR baseline schematic (2007 IHEP meeting) Collimator OMD 150GeV e- ~147GeV e- Target TAP (~125MeV)
Friday 28 th April Review of the aims and recommendations from the workshop L. Rinolfi.
Ian Bailey Lancaster University / Cockcroft Institute Baseline Target Prototype Status TILC09, Japan.
20/03/2011 Global Design Effort 1 ALCPG11 – Eugene Positron Source N. Collomb J. Clarke, D. Angal-Kalinin,
Undulator R & D Jim Clarke STFC Daresbury Laboratory, UK BAW-2 SLAC Jan 2011.
JCS e + /e - Source Development and E166 J. C. Sheppard, SLAC June 15, 2005.
Status of Undulator-based Positron Source Baseline Design Leo Jenner, but based largely on a talk given by Jim Clarke to Positron DESY-Zeuthen,
Performance Studies on the Undulator Based ILC Positron Source Wei Gai ANL For ILC positron collaboration BAW II January 20, 2011,
Undulator Based ILC Positron Source Studies Wei Gai Argonne National Laboratory CCAST ILC Accelerator Workshop Beijing, Nov 5 – 7, 2007.
What’s been Achieved and What’s to be Done K. Yokoya ILC Annual Meeting 2012/12/20 ILC Annual, Yokoya1.
1 st October Linear Collider workshop The CLIC/ILC common work plan progress J. Clarke and L. Rinolfi.
28/10/09 Positron Workshop 1 Introduction and Setting the Scene Jim Clarke ASTeC & Cockcroft Institute Daresbury Laboratory.
1 Present members : KEK: J.Urakawa, T.Omori, T.Suwada, T.Kamitani, --- BINP, Novosibirsk :Pavel Logachev (BINP), V.M.Strakhovenko, --- Hiroshima: T.Takahashi,
2015/10/261 Present members : KEK: J.Urakawa, T.Omori, T.Suwada, T.Kamitani, BINP, Novosibirsk :Pavel Logachev (BINP), V.M.Strakhovenko, --- Hiroshima:
Nick Walker Marc Ross Akira Yamamoto 2010 (and beyond) Plans & Milestones.
WG3a Sources Summary Jim Clarke on behalf of John Sheppard, Masao Kuriki, Philippe Piot and all the contributors to WG3a.
Key luminosity issues of the positron source Wei Gai.
Positron Source General Update M. Kuriki(Hiroshima U./KEK) ALCW2015, April 2015,Tsukuba/Tokyo, Japan.
Update on ILC Positron source study at ANL since the Durham/UK Meeting10/2010 Wan-Ming Liu, Wei Gai.
EUROTeV WP4 Report Polarised Positron Source Jim Clarke, on behalf of the WP4 team DESY Zeuthen STFC (Daresbury and RAL) University of Durham University.
Current standing of the undulator based ILC positron source Wei Gai AWLC 14 FNAL, May
Development of a Positron Production Target for the ILC Positron Source Capture Optics Positron beam pipe/ NC rf cavity Target wheel Vacuum feedthrough.
15 th October CLIC workshop The CLIC/ILC common issues for the sources Jim Clarke and Louis Rinolfi.
Ian Bailey University of Liverpool / Cockcroft Institute UK Target Update EUROTeV: WP4 (polarised positron source) PTCD task I. Bailey, J. Dainton, L.
Target Mechanical R/D Magnetic Immersion Effects (Daresbury Experiment) Pass-Through/Seals (Vacuum, Water union)- leaks, survivability Thermal Loading.
Global Design Effort 1 Sources Parallel Session Summary Jim Clarke STFC Daresbury Laboratory.
20 April 2009 AAP Review Global Design Effort 1 The Positron Source Jim Clarke STFC Daresbury Laboratory.
J.C. Sheppard, SLAC Americas Region September 27, ILC Positron TDR and R&D Meeting 1: Oxford ILC GDE Activities Update and Undulator Scheme Status.
REMOTE-HANDLING OVERVIEW I. Bailey Cockcroft Institute / University of Liverpool.
Undulator Based ILC Positron Source Parameters Wei Gai ANL ALLCPG 2011 March 20, 2011,
Polarimetry Report Sabine Riemann on behalf of the DESY/HUB group January 24, 2008 EUROTeV Annual Meeting, Frascati.
Welcome and Introduction to the Workshop Jim Clarke ASTeC & Cockcroft Institute Daresbury Laboratory ILC Positron Source Collaboration Meeting 29 – 31.
ILC/CLIC e + generation working group Jim Clarke, STFC Daresbury Laboratory and Louis Rinolfi, CERN.
Discussion, Action Items, & Future Work Plan Jim Clarke ASTeC & Cockcroft Institute Daresbury Laboratory ILC Positron Source Collaboration Meeting 29 –
10/9/2007 Global Design Effort 1 Optical Matching Device Jeff Gronberg / LLNL October 9, 2007 Positron source KOM - Daresbury This work performed under.
Ian Bailey Cockcroft Institute/ Lancaster University IWLC October 21 st, 2010 Overview of Undulator-Based Sources for LC.
10/02/2011 Global Design Effort 1 Positron Source meeting J. Clarke, D. Angal-Kalinin, N. Collomb.
Undulator based polarized positron source for Circular electron-positron colliders Wei Gai Tsinghua University/ANL a seminar for IHEP, 4/8/2015.
22 th October 2010 IWLC Sources working group J. Clarke, T. Omori, L. Rinolfi, A. Variola Summary of Sources working group WG1 with contributions from.
WG3a Sources Update Jim Clarke on behalf of WG3a GDE Meeting, Frascati, December 2005.
POSIPOL Berlin ILC/CLIC e + generation working group Wei Gai, ANL Louis Rinolfi, CERN Thanks to Omori-san for the coordination of the Webex meetings.
November 20, 2008 A. Brachmann Slide 1 Sources Session Summary LCWS 2008 A. Brachmann, J. Clarke.
Positron Source Update Jim Clarke ASTeC & Cockcroft Institute Daresbury Laboratory ILC 08, University of Illinois at Chicago, 17 th November 2008.
29/10/09 Positron Workshop 1 Working Assumptions for Low Energy Operations Jim Clarke ASTeC & Cockcroft Institute Daresbury Laboratory.
1 Positron Source AD & I Report Jim Clarke ASTeC & Cockcroft Institute Daresbury Laboratory.
ILC e - and e + sources overview Jim Clarke STFC Daresbury Laboratory, UK On behalf of ILC Positron Sources Group.
February 4, 2007 Global Design Effort 1. February 4, 07 Global Design Effort IR&MDI: 2 Tuesday’s discussion EDR organization Work Package distribution.
ILC Positron Production and Capturing Studies: Update Wei Gai, Wanming Liu and Kwang-Je Kim Posipol Workshop, Orsay, France May 23-25, 2007 Work performed.
ILC Undulator Based Position Source Target System Wei Gai, HEP, ANL TB meeting 8/5/2014.
Oct. 6, ILC Positron Source Group Meeting Short report by S. Riemann September 2006, RAL.
Positron Source for Linear Collider Wanming Liu 04/11/2013.
Positron Source Report Jim Clarke STFC Daresbury Laboratory/Cockcroft Institute.
Photon Collimator and Conversion Target Status I. Bailey University of Liverpool / Cockcroft Institiute Cockcroft Institiute.
1 Positron Source Configuration Masao KURIKI ILC AG meeting at KEK, 2006 Jan. Positron Source Configuration KURIKI Masao and John Sheppard  BCD Description.
AD&I Meeting 23/6/10 Jim Clarke
Polarised Positron Source Target and Collimator
Pair-Production Target
Positron Update ILC R&D Meeting/ March 12, 07 VB & JCS
AD & I : BDS Lattice Design Changes
CLIC Undulator Option for Polarised Positrons
ILC/CLIC e+ generation working group
Future Work Plan and Action Items
Beam Dump outline work plan (UK perspective)
ILC RDR baseline schematic (2007 IHEP meeting)
Summary for the Sources working group
Lithium lens and window tests
J. C. Sheppard SLAC September 29, 2006
Presentation transcript:

Progress with Zeuthen Meeting Actions Jim Clarke ASTeC, STFC Daresbury Laboratory

Collimation Study of Photon collimators in undulator – Adriana, EPAC  Heat load, activation, vacuum level, materials, … High power photon collimator needs to be studied and engineered  Report from Lei on heat loading, activation (next meeting) Positron collimation – design documented, needs updating as source evolves

Undulator Generate beam test plan – Jim (next meeting) Horizontal magnet measurements required at some stage Electron beam tests required at some stage Modules need to be engineered for large scale production and operation Intermodule connections need engineering “Real” Undulator spectrums required for modelling of source – Duncan (next meeting) Write a Report on vertical test results – Nick/Duncan (next meeting) Store cryomodule safely so can be powered at a later date – Jim Alignment requirements justified/jitter studies/impact on polarisation

Target Complete Eddy current tests at Daresbury – Ian/Leo Nov 08 (store properly afterwards!) Generate simulations to compare with experimental results – Jeff / RAL? Nov 08 Pressure shock wave analysis – Stephan (next meeting) and numerical modelling – Tom (later) Guarding thickness verification – Tom (now) Ensure consistency between ANL/DESY simulations – Wei/Andriy (next meeting)  Energy compression before DR Lifetime studies of target (LLNL) Engineered solution, including prototype tests – water, vacuum, … Alternative liquid metal (BINP/KEK tests) – Junji Where are ferrofluidic seals used – Ian (next meeting)

Compton Continue DR stacking studies and work with DR group to ensure optimum solution - Frank cavity stability tests (LAL/KEK) - Omori Laser demonstration – Fabian Zomer, Vitaly ATF demo – Omori 2010 demo of high gamma flux at ATF

Polarisation Write brief report justifying need for 5Hz positron spin flipping at some point and ability to reverse – Sabine (next meeting) [Scheme to destroy polarisation in DR completely – Des Barber] Low energy polarimeter – check impact of foil temperature on performance & background studies – Ralph (next meeting) Close contact with IP group polarimeter Ensure spin survives to DR Electron spin also within undulator – Des early 09 Close contact with simulations group – spin track to IP Optimise spin rotator design (5GeV/125MeV?)

Remote Handling Preliminary use of detailed target model in Fluka – Luis/Lei/Andriy (next meeting) Collimator in RH (next mtg) Activation of water - Luis/Lei/Andriy (next mtg) Shielding thickness around target etc – Andriy (next mtg) RH scenarios refined  Changeover times (requirement ties in with lifetime of kit in RH)  Replacement of pillow seals? Auxiliary source (needs RH as well) – KEKB? Pillow seals need R&D Need engineered design compatible with source layout (remove inconsistencies!) If yield increases then RH not needed (limited only?)

Source Modelling Write-up undulator emittance effect – Wei (next meeting) Benchmark G4 polarisation/yield against other codes – Andriy/Andreas (next meeting) Study activation of linac after target, copper vs aluminium – Andriy (next meeting) Re-evaluate undulator K if target/OMD changes (Wei) Ongoing yield/polarisation evaluation with source design evolution (Wei)

OMD Li Lens  Evaluate level of radiation damage in window & implications for lifetime  Stress-strain in window  Thermal cycling fatigue  Cavitation wear on windows  Proton beam tests?  Contact experienced Li lens experts to discuss this idea (Jerry Dugan?) – Marc to provide names  KEKB BN window tests (liquid lead target) Flux Concentrator  Need feasible design

Other Issues Begin “system integration” engineering – Norbert/Jim/John Define new specification for Auxiliary positron source – Jim Understand timing issues for ILC, work with DR group to look at options – Jim/Andy W Establish link with KEKB high intensity conventional source project – Jim/Kamitani