OTE Building PMG Report October 25, 2012 Rhonda Merchut 1.

Slides:



Advertisements
Similar presentations
East Hampton High School July 2013 – July 2014 Design Phases.
Advertisements

Project Description and Needs Lincoln Way Widening Addition of a center-turn lane and safety improvements to the grade and horizontal alignment. Needs.
THE HELP PROCESS. Professional medical equipment project management is the systematic, knowledgeable process through which all items of capital equipment.
Project Planning: Assembling a Mortenson “Integrated Work Plan”
SUBMITTALS PROCESSING Fall 2008 ARCH 330
April 21, 2010 Barbara C. Jordan Elementary School Update Presented by.
Progress Report 12/13/11. Progress Schedule December 2011 Work Completed December: Installed Concrete topping on roof Rough In M&E East side screen wall.
Education Campus What a Difference a Year Makes! Takoma.
Capital Program Update Maintenance Garage On schedule - Final Completion is May 19, 2007 but the District needs to move in April because the.
West Contra Costa Unified School District Facilities Subcommittee Meeting March 11, 2014 State School Facility Program Seismic Funding Update.
Interior and Exterior Demo Continue Dust Control Measures for Air Quality Management Per LEED Construction Plan 4/16/12 – 4/20/12 Iconic Birdcage Removed.
1 BROOKHAVEN SCIENCE ASSOCIATES Central Chilled Water Facility – Phase II Alan Raphael MPO Project Manager CFAC Committee Review November 9, 2009 Sub-basement/Pipe.
Industry information day INDUSTRY INFORMATION DAY Assembly & Installation Laurent Schmieder Buildings Infrastructure and Power Supplies Project.
Project Startup Hmwk Due 10/11/ # 1,3,7,8 8.9 #1 9.7 #1,3,4,5, #1,2,3,4,10.
TECHNICAL ASSIGNMENT #1 – NATHAN BRASKEY SUNNYVALE PLAZA [Cooper Carry, Inc.]
Types of Drawings University of Palestine Eng. Nagham Ali Hasan
PIONEER HIGH SCHOOL WEST STADIUM PHASE 1. EXECUTIVE SUMMARY Erickson Hall (EHCC) was the awarded the Pioneer High School Phase 1 Construction Contract.
Dirty Tour December 2005 UN Capital Master Plan. 2 Dirty Tour- introduction The UN building was a state-of-the-art, code compliant structure when it was.
PH-DT Infrastructure Investments M.Capeans SPOB meeting CERN, 20/3/14.
1 BROOKHAVEN SCIENCE ASSOCIATES As-Built Drawings and Commissioning Status Steve Sawch Assistant Director for Construction Management NSLS-II Conventional.
© Ameresco, Inc. 2012, All Rights Reserved Oconto Falls School District September 10, 2012 Energy Savings Performance Contract Update.
Commissioning of Fire Protection and Life Safety Systems Presented by: Charles Kilfoil Bechtel National Waste Treatment Plant Richland WA.
1 BROOKHAVEN SCIENCE ASSOCIATES LOB - Ring Building Construction Coordination Michael P. Bromfield Construction Engineer NSLS-II Conventional Facilities.
1 BROOKHAVEN SCIENCE ASSOCIATES Construction Management Status Steve Sawch Assistant Director for Construction Management NSLS-II Conventional Facilities.
1 BROOKHAVEN SCIENCE ASSOCIATES Ring Building Construction Status Steve Sawch Assistant Director for Construction Management NSLS-II Conventional Facilities.
1 BROOKHAVEN SCIENCE ASSOCIATES Ring Building Construction Status Michael P. Bromfield Construction Engineer NSLS II Conventional Facilities Advisory Committee.
Board of Education Presentation 2015 Referendum Projects September 9, 2015 Update.
Progress Photos Goodnoe Elementary School Additions and Renovations Project November 2013 Goodnoe Elementary School.
DSA 101 July 2010 Plan Approval Process for the Career Technical Education Facilities Program (CTE)
Code Officials and the Code Process.  To design the interior of the building in conjunction with codes, standards and federal regulations required in.
Palomar West Medical Center Segmental Review Brett W. Beekman, S.E. Senior Structural Engineer, Southern California.
IARC Milestones completed Sept 2011: End of Tevatron Run, FESS obtains ~full access to infrastructure at CDF, PPD begins D&D in CDF assembly bldg Sept.
Regulatory Streamlining Task Force Update Discussion Item December 6, 2011 Board of County Commissioners.
Cassidy Elementary – Renovation Architect: Tate.Hill.Jacobs: Architects General Contractor: D.W. Wilburn, Inc. Substantial Completion Date:August, 2010.
Estimating and Scheduling CEE 492
Procurement of Professional Services.  Professional Services:  Architects, Engineers  Surveyors  Geotechnical engineers  Nonprofessional Services:
OTE Building PMG Report June 25, 2012 Rhonda Merchut 1.
OTE Building PMG Report March 2, 2012 Rhonda Merchut 1.
Coordinating with Project Managers Cassie Reiter, P.E., ENV SP Utility Coordinator/Project Manager CMT Engineers and Consultants June 2016.
Schedule and Milestones Roy Preece STFC RAL FAC 17 th April 2015.
Department of Public Works FY 2015 Operating Budget May 19, 2014.
OTE Building PMG Report September 10, 2012 Rhonda Merchut 1.
OTE Building PMG Report 02/07/2011 (December 2010 & January 2011 update) Rhonda Merchut.
OTE Building PMG Report April 29, Agenda CDF D&D: J. Lewis OTE Building Project: R. Merchut Coordination State Activities Schedule Fiscal Summary.
Chicago Public Library Board of Directors Meeting January 13, 2015 Projects in Planning Schedule/Activity Phase 1 – Under construction. Refer to YOUmedia.
Camera PDR/CD1 Planning 19 September 2008
Upon completion of this module, you will be able to:
CODE REVIEW: DOH Article 28 Compliance
SCT Project Management Issues
UPDATE ON DOE RUN ELEMENTARY CONSTRUCTION PROGRESS
Hays County Commissioners Court
Fall 2017 Update: Physical properties and sinking fund
October 2017 Mustang panther package b update
4 November 2013 LEHIGHTON AREA SCHOOL DISTRICT.
Leading Indicators and Dashboarding for Advanced Work Packaging
FIVE PROJECT PHASES 5C-3 Sun. 8:00-10:00am 21/ 2/2016.
FIVE YEAR CAPITAL FACILITIES PLAN (Five Year Plan)
Minuteman Vocational Technical Regional High School Progress
PCC Update 08/26/09 Implementation Phase 1
Minuteman Vocational Technical Regional High School Progress
Adoption of the FY Capital Improvement Program Budget
Fruita Monument High School Entry Project
Minuteman Vocational Technical Regional High School Progress
Minuteman Vocational Technical Regional High School Progress
Minuteman Vocational Technical Regional High School Progress
Master Facilities Committee Evaluation and Identification
Bunker Project Schedule/Budget
Community Practice Asset Management.
Lafayette Airport Commission New Terminal Program Update
Lafayette Airport Commission New Terminal Program Update
Presentation transcript:

OTE Building PMG Report October 25, 2012 Rhonda Merchut 1

Agenda Coordination OTE Building Project State Activities Fiscal & Schedule Summary Action Items 2

3 IASU Update Phase 1 has been complete. CDF Coordination OTE work on east side general assembly is complete & returned to CDF use. West ramp remains closed – CDF roof reinforcing continues – OTE/CDF Bridge prep work underway

CDF Refurbishment Project scope development underway Priorities: – Building fire and life safety Building Use to remain as science. No expansion of tours. Update per Code required. End of life equipment to be replaced – Regulatory compliance: ADA, Guiding principles – Building systems & infrastructure: replacement vs repair evaluation underway upgrade 4

5

6

7 (loaded)

8

9

OTE Project Status: Schedule analysis, reporting, and cost curve continues. Shop drawing review well underway. Approx 60% through anticipated 800+ submittals. Subcontractor’s BIM model developed for coordination. Extensive coordination required. Safety procedures continue to be expanded as more subs come onto the project. 10

OTE Project Status: LEED procedures & Action Plan implemented. – 91% construction waste has been recycled. – On track to meet goal of 20% (by cost) of regionally manufactured materials. – On track to meet goal of 20% (by cost) of recycled content in materials used. 11

OTE Building Construction Status: Sub structure complete (SOG underway) – Under-slab utilities underway Superstructure nearing completion – West decks poured – Slab pours for east side on-going Interior CDF steel underway Detailing perimeter vertical structural steel tubing underway Transformer & Switchboard rec’d 12

Super structure 13

14 At CDF

15 Cantilever at CDF

16 Utilities

17 Deck

18 Inside CDF

Two Week Look Ahead Prep and Pour west slab on grade (except polished concrete areas) Begin interior MEP ceiling rough- in Continue vertical steel tube work Pour east decks 19

State DCEO Activities DCEO line item budget revised based on Barton Malow schedule of values & revised burdens Budget Modification Request approved 10/22/12 20

Schedule 21

Schedule 22

Schedule Adjustments 8 additional days for underground work (SA05) Anticipated 10 additional days for deck penetration changes. (EC 049) Anticipated revised MS 3, Project Complete: 12/10/13 23

24 BCWS & ACWP Cost Curve 29% costed 30% time

Unaligned Activities 25

Change Order Tracking 26 Continue to maintain Change Order Log. – 60 identified EC’s = +$119K – Existing Conditions, A/E omissions, value engineering are the primary categories – Discipline coordination remains a challenge 145 RFI’s to date PA working diligently with BMC to insure timely submissions of Modification Requests

PP Tracking Milestones 27

Contingency Management Sources available to fund change orders: – IGPP; – De-scope from anticipated T&M work; ALL T&M has been cancelled: – Service Screen Wall, Bike path realignment, native prairie garden, Art & Science Window Film – De-scope from A/E support work; – DOE backstop – Subject to FY 13 funding; – De-scope from main construction work (will not recover all funds); – Value engineering main construction work 28

Contingency Opportunities status: Change CMU 2-hour wall to Gyp Board 2-hour wall Mechanical modifications Glazing Type changes To date $170K in savings 29

Summary Action Items Obtain Status of block pivoter. Obtain final decision on CDF tours. No public Tours Obtain samples for polished concrete floor. Aggregate has been selected. EC must be issued. Continue overarching IARC development: Outfitting needs, costs, and schedule including VoIP, CDF refurbishment scope. Coordinate Lecture Hall furnishings with under slab electrical placement. Under slab electrical finalized. Continue contingency opportunities identification. Submit to DCEO revised line item budget. Approval rec’d Continue cost loaded schedule evaluation & cost curve analysis with Subcontractor. Continue shop drawing & change order review, RFI responses Continue construction coordination & oversight. Next PMG re: Thanksgiving & Christmas? 30