Coastal Engineering Waterfront & Marinas Civil Engineering Regulatory Permitting Site Investigations Marine Environmental Construction Destination Development.

Slides:



Advertisements
Similar presentations
Ocean City Beachfill Ocean City, NJ Bureau of Coastal Engineering New Jersey Dept. of Environmental Protection Office of Engineering & Construction.
Advertisements

New Directions in Beach Policy? Leadership changes DEP Sand Memo Legislature (Beach Bill) Rule review and possible changes – –Sand – –Armoring – –Lighting.
1 The Status of Capitol Lake Planning Washington State Capitol Committee October 12, 2010.
1 Ocean View Shoreline Project Update Overview for Norfolk City Council January 7, 2014.
Coastal Zone Management.  Coastal Zone Management Act (1972) –Administered by Coastal Programs Division of NOAA –Covers over 22% of U.S. Land Area –Multi-purpose.
DEVELOPMENT PLANNING FOR COASTAL HAZARDS JUNE 30, 2006 BY ENGINEERING SECTION COASTAL ZONE MANAGEMENT UNIT COASTAL ENGINEERING FOR NATURAL HAZARDS.
Northeast Corridor Greenway Acquisition – Mitigation Feasibility Study Results City Council Workshop June 24, 2014.
Baird Government of Barbados Inter-American Development Bank Coastal Infrastructure Programme Addressing the Challenge of Coastal Erosion Prepared by Baird.
Federal Policy III Deductions for mortgage interest and property taxes on second homes Casualty loss deduction for damage caused by natural hazard Rental.
WAVE INDUCED SET UP, MARINA DI PISA, ITALY. For background see….. PDF Link: Pranzini & Farrell_ICS_2004.pdf.
Winthrop awx/index.jsp?c= | &sf=18750&ds=ArcWeb: GlobeXplorer.Deluxe_Tiles.Worl d|ArcWeb:TA.Streets_VectorsF.
Beach Nourishment Effects on Nesting Marine Turtles Whitney Pyatt NC Coastal Reserve & NERR May 9, 2011.
63 rd Street, Miami Beach Proposed Submerged Reef Ball Breakwater Proposed Submerged Reef Ball Breakwater R-45 R-46.
Coastal Wind Energy Study In summer 2008, the North Carolina General Assembly directed the UNC Board of Governors to study wind energy feasibility University.
San Francisco District San Francisco District Coastal Activities Frank Wu CERB Meeting June 4, 2009.
Mouth of the Columbia River Jetties Major Rehabilitation.
Blind Pass Project Update Bayous Preservation Assoc. February 9, 2011.
Los Angeles District and South Pacific Division CERB June 4, 2009 Technical Tools for Regional Sediment Management Susan Ming – USACE, Los Angeles District.
U.S. Department of the Interior Minerals Management Service Capital Hill Oceans Week Renee Orr Chief, Leasing Division Minerals Management Service Herndon,
Folly Beach 1-yr Post-Construction Monitoring Report Nicole Elko, Ph.D. September 8, 2015.
Beneficial Use at Deer Island A Decade of Design and Implementation Presented by Walter Dinicola, P.E., and Wendell Mears Anchor QEA, LLC George Ramseur.
Tracking No Template Master – Update Tracking Number and Date Information Here Update tracking number and date on this slide Template Master.
1 Dark Background Body Slide This background is best for on-screen presentations only—the background shows up best on-screen but uses excessive toner if.
Broad Beach Sand & Dune Habitat Restoration Project Broad Beach Revetment Owners August 29, 2015.
A World of Solutions North Topsail Beach Shoreline Protection Project Phase 1 – New River Inlet Channel Realignment & Beach Restoration NC Water Resources.
US Army Corps of Engineers BUILDING STRONG ® USACE-IOOS Missions, Priorities, Recommendations Linda Lillycrop IOOC Member USACE Liaison, U.S. IOOS US Army.
Oregon Department of Transportation Stormwater Management Initiative: Meeting New Challenges Presented by: William Fletcher, ODOT February 5, 2008.
E GNV Orange County Solid Waste Management Facility Southern Expansion Site Project.
San Francisco Ocean Beach-Great Highway Erosion Control Project.
California Coastal Commission Permitting For Emergency Response to the 2010 El Nino Storm Event Department of Public Works July 2011.
TOPSAIL BEACH 30 Yr Beach Management Plan June 8, 2011.
Julio A. Zyserman, DHI, Solana Beach, California
Los Angeles District CERB June 4, 2009 Regional Sediment Management Plan Development throughout California Heather Schlosser Los Angeles District.
US Army Corps of Engineers BUILDING STRONG ® Mississippi Coastal Improvements Program (MsCIP) “Comprehensive Barrier Island Restoration Plan” PIANC 2012.
C HARLOTTE C OUNTY B EACHES & S HORES A DVISORY C OMMITTEE J ANUARY 7, 2016 C HARLOTTE C OUNTY E ROSION C ONTROL P ROJECT U PDATE.
US Army Corps of Engineers BUILDING STRONG ® And Taking Care Of People! Josephine Axt, Ph.D. Chief, Planning Division Los Angeles District July 10, 2013.
Bay Club Marina Reconstruction Coastal Commission Hearing December 15, 2010; Agenda Item W16b These materials have been provided to the Coastal Commission.
August 19, 2015 Port Bienville Rail EIS Scoping Meeting Presented by: Rhea Vincent Mike McGuire.
May 14, 2013 North Ogden PW Land Purchase. Location: Approximately 130 East Pleasant View Drive Seller Scott Holt.
A Collaborative Approach to Assessing Watershed Conditions in Coastal National Parks Kristen Keteles, Cliff McCreedy, Jim Tilmant and Mark Flora.
Getting Started: Summary of Bylaw and Regulatory Options for Stormwater and Low Impact Development Lexington & Wakefield 1 st Workshop - February 7, 2007.
US Army Corps of Engineers BUILDING STRONG ® ENGINEERING WITH NATURE “ Beneficially Integrating Engineering and Natural Systems” PIANC 2012 Dredging Conference.
HAMPTON ROADS REGIONAL WATER RESOURCES MANAGEMENT PROGRAM Presentation John M. Carlock, AICP Deputy Executive Director, Physical Planning Hampton Roads.
1 Calcasieu River & Pass, Louisiana Dredged Material Management Plan (DMMP) Kick off Meeting February 2, 2005 Project Manager Mireya Laigast, Civil Engineer,
Agnes Water Desalination Project Preliminary Studies – Aquatic Ecology John Thorogood and Kylie McPherson.
Sand Dollars Federal Shore Protection Appropriations
Barrier Islands… The low down.. On these important depositional features The low down.. On these important depositional features.
What does a Civil Engineer do?
Ecology and environment, inc. ecology and environment, inc. International Specialists in the Environment Georganna B. Collins, International.
COSA Committee Meeting
Charlotte County Beach Funding Plan
Treasure Coast Regional Planning Council
Parks and Recreation Commission
Hunting Island State Park Beach Restoration Project
FOR LOCAL AGENCY FEDERAL AID PROJECTS
COSA Committee Meeting
Editor of Journal of Coastal Zone Management
Hung Shiu Fung, Thomas Fischer
Civic Center Sports Field Study Session & Quarterly Update
Looking to the Future to Protect the Past: Managing the effects of climate change and sea level rise on archaeological sites at Fort Eustis, Newport News,
Measure A Financial Oversight Committee August 7, 2013
COSA Committee Meeting
COSA Committee Meeting
California’s Plan to Deal With Once-Through Cooling At
FOR LOCAL AGENCY FEDERAL AID PROJECTS
Shoreline Processes and Features Outline
Environmental Protection Division
Agricultural Land & Avian Foraging Habitat Mitigation Fee
BOSTON HARBOR DEEP DRAFT IMPROVEMENT PROJECT
FLAGLER COUNTY, FLORIDA
Presentation transcript:

Coastal Engineering Waterfront & Marinas Civil Engineering Regulatory Permitting Site Investigations Marine Environmental Construction Destination Development

Feasibility Study Town of Palm Beach Reach 8 Beach Nourishment Town of Palm Beach Reach 8 Beach Nourishment

Aerial Photographs ( ) History

Reach 7 Beach Nourishment Nourished in early 2006 Serves as “feeder beach” to Reach 8 Approximately 1,095,600 CY Utilized offshore borrow areas Borrow material was finer than native beach sand Beach subjected to accelerated erosion and longshore transport

Reach 8 Masterplan Proposed Improvements

Material Summary Estimated Volume of Fill (North) = 143,000 CY o Maximum 60 CY/ft Estimated Volume of Fill (South) = 118,000 CY o Maximum 40 CY/ft Total Estimated Volume = 261,000 cubic yards Source: Ortona Sand Co, Inc., LaBelle, FL (~94 miles) Estimated Volume of Fill (North) = 143,000 CY o Maximum 60 CY/ft Estimated Volume of Fill (South) = 118,000 CY o Maximum 40 CY/ft Total Estimated Volume = 261,000 cubic yards Source: Ortona Sand Co, Inc., LaBelle, FL (~94 miles)

Methodology & Scheduling 2 Simultaneous offloading/placement operations 9am-5pm, Monday-Friday trips/truck/day/operation Est. Production = 3240 CY/day 216 Trucks/day, three bridges Est. Construction Time = 16 weeks for 261,000 CY 2 Simultaneous offloading/placement operations 9am-5pm, Monday-Friday trips/truck/day/operation Est. Production = 3240 CY/day 216 Trucks/day, three bridges Est. Construction Time = 16 weeks for 261,000 CY

Site Access & Staging Potential Access Locations Ambassador South I & II R.G. Kreusler Park Palm Beach Hampton Condominiums Thirty Two Hundred Condominiums Atriums of Palm Beach Condominiums I & II Lake Worth Bridge Southern Blvd. (3.7 miles) Ocean Ave (0.5 miles)

Preliminary Cost Estimation ItemQuantityUnit Unit Price Cost 1Supply Sand390,000Ton $ 9.78 $ 3,814,200 2Transport & Delivery (First Ton-Mile)390,000Ton-Mile $ 1.05 $ 409,500 3Transport & Delivery (Additional 93 miles)36,270,000Ton-Mile $ 0.16 $ 5,803,200 4Conveying of Material (Initial 300')390,000Tons $ 1.70 $ 663,000 5Conveying of Material (Extra 300')390,000Tons $ 1.11 $ 432,900 6Beach Place and Grade (<1000' from Access)322,500Ton $ 1.68 $ 541,800 7Beach Place and Grade (1000'-2000' from Access)67,500Ton $ 3.05 $ 205,875 8Maintenance of Traffic1LS $ 15, $ 15,000 9Pre/Post Construction Surveys1LS $ 40, $ 40,000 10Miscellaneous1LS $ 50, $ 50,000 TOTAL ESTIMATED COST: $ 12,000,000 Note: Assumption of 1 CY Sand is equal to 1 Ton

Performance Sediment Transport Rate Performance 30% greater w/ 0.6mm sand than use of 0.23 mm sand North fill performance approximately 6-8 years South fill performance approximately 5 years

Performance 25-Year Storm Event Profiles R-130 Monument

Impacts Hardbottom & ETOF - North

Impacts Hardbottom & ETOF - South

Permitting Permitting Issues Hardbottom impacts – 2.1 acres Mitigation location – north R-110 Sea turtle nesting season Sea turtle foraging habitat - hardbottom Acropora, survey for species and consult Cumulative impacts analysis for fill Permitting Issues Resolved Borrow area Compatibility of sand/fines Use of borrow area sand for non-critically eroded beach Substantial reduction in hardbottom impacts Processing and Mitigation Timeframe = months Est. Design & Permitting Fees = $300,000 Est. Monitoring Costs = $300,000/year Est. Mitigation Cost = $2,250,000

Conclusions & Recommendations Project is feasible Project would provide additional protection from 25-yr storm Project performance would be 5-8 yrs Project construction time ~ 4 months Project addresses petitioner’s concerns Based on reduced impacts and compatible sand Project is permittable Permitting time ~ months Maximum permittable project in foreseeable future Serve as an interim measure until Reach 7 renourishments stabilize Recommendation - Proceed with Truck Haul Renourishment

Next Steps Decision by Town Council to Proceed with Project JCP Coastal Systems full design and prepare JCP permit application Peer Review of JCP permit application and Approach

Questions?