XML Description of Beam Pipe Geometry  For XML description of Beam Pipe were used: Det/XmlDDDB/v6, Det/XmlEditor/v4, Det/DetDesk/v8, Vis/GaudiLab/head.

Slides:



Advertisements
Similar presentations
PHENIX & The Beam Pipe. 1)Overview of the drawings 2)I will break down the beam pipe going from MuID-S to MuID-N piece by piece. 3)Important Information.
Advertisements

Beam-plug and shielding studies related to HCAL and M2 Robert Paluch, Burkhard Schmidt November 25,
Engineering Division 1 HFT Middle Support Cylinder Eric Anderssen, LBNL.
CE En 112 Engineering Drawing with CAD Application
Downstream e-  identification 1. Questions raised by the Committee 2. Particle tracking in stray magnetic field 3. Cerenkov and calorimeter sizes 4. Preliminary.
Intro to Conic Sections. It all depends on how you slice it! Start with a cone:
CERN, November 25, 2003 – Technical Board Support chariot for ITS & FMD services on the RB24 side Foreward –This presentation reports the current ideas.
HFT Geometry Considerations F.Videbæk BNL. Introduction This presentation is meant to be a living document, updated as more and better information becomes.
Unit 2 Present Progressive and Simple Present. Unit 2 Present Progressive and Simple Present 2 Present Progressive.
Engineering Division 1 Mechanical and Integration CD0 Walkthru, 19-Dec, 2007 Eric Anderssen, LBNL.
Status of vacuum & interconnections of the CLIC main linac modules C. Garion TE/VSC TBMWG, 9 th November 2009.
1 Fulvio TESSAROTTO Update on the thin RICH beam pipe project - prototypes validation and pipe production - microflanges and fixation system - the intervention.
Tracking Integration Challenges Y. meeting 2013/9/25.
Detector studies, Radiation Simulations, Organization FCC Hadron Detector Meeting July 27 th 2015 W. Riegler.
XML Description of ECAL Geometry  For XML description of ECAL Geometry were used: Det/XmlDDDB/v5, Det/XmlEditor/v4, Det/DetDesk/v6, Vis/GaudiLab/v1r4.
LAV Software Status Emanuele Leonardi – Tommaso Spadaro Photon Veto WG meeting – 2015/03/24.
Alice overview New detector and chamber ALICE TC.
ENGINEERING DESIGN AND FABRICATION OF X-BAND DAMPED DETUNED STRUCTURE V. Soldatov¹, D. Gudkov¹, A. Samoshkin¹, G. Riddone², A. Grudiev², S. Atieh², A.
Optimization of the Silicon Tracking System (STS) layout and beam pipe configuration for the CBM experiment. Andrey Chernogorov, Sergey Belogurov, ITEP,
MAE Advanced Computer Aided Design Your Name Title Place, Date.
Workshop Chamonix XV27-January-2006 DivonneMassimiliano Ferro-Luzzi 1 State of LHCb for the Sector Test  Overview  Agreement  Status of –VELO –exit.
EAR2 Beam Line Report on the Status C. Weiss EAR2 Beam Line - Report on the Status1.
03/22/2007HCal Electronics Meeting HO LIGHT GUIDE SIMULATIONS Justin Parsons, University of Iowa Jim Freeman, FNAL HO LIGHT GUIDE SIMULATIONS 1.
Status of Anti project. F. Raffaelli,A. Checchetti,C. Capoccia. INFN CERN, July 14 th, Status of the Anti construction test and schedule. -Status.
ECAL software development Yuri Kharlov IHEP Protvino.
Laboratoire de l’Accélérateur Linéaire, Orsay, France and CERN Olivier Callot 18 March 2003 Online Data Format and Condition Database Proposed data format.
1 Run7 startup M. Sullivan MAC Review Nov , 2007 M. Sullivan for the PEP-II Team Machine Advisory Committee Review November 15-17, 2007 Run 7 Startup.
A2-A5: The drawing has been revised (minor changes), the bid has been approved by INFN management and the invitation letter to the companies will be sent.
Xml News Slide 1 S. Ponce, 21 June 2001 Detector description language news.
IRC/SAC status Venelin Kozhuharov for the SAC/IRC working group NA62 Meeting
Hcal Geometry and Assembly Videoconference January 2008, 24th.
Pre-LHCb week / CALO meeting, CERN SBBeam plugs for in 1 
TECH 104 – Technical Graphics Communication Week 3: Multiview Drawings - 1.
October 6, 2009Bill Wisniewski1 State of drawings Remedies? Forward Region DIRC/DCH/EMC interplay Road Trip Discussion Beam pipe & forward cone plug ‘Quick’
SuperB Gen meeting Oct 5-9, 2009 IR Interface 1 IR Interface Issues M. Sullivan For M. Boscolo, K. Bertsche, E. Paoloni, S. Bettoni, P. Raimondi, et al.
What’s new at LAL-LLR ( MDI issues) M.Jore, C.Clerc Visit at CMS Forward detectors meeting at LLR Vacuum in Beam pipe, first LAL results.
M Sullivan SuperB Workshop Elba, Italy May 31 - Jun 3, 2008
Machine Detector Interface Design Updates
Bunching system for SPES project
Some input to the discussion for the design requirements of the GridPixel Tracker and L1thack trigger. Here are some thoughts about possible detector layout.
M. Sullivan SuperB General Meeting Perugia, Italy June 15-20, 2009
new straw end plug: D=10.6 mm straws support frame Levan option
DDF 102 – Size & Shape Description I
Status and Progress of NSW HUB and Extension
- STT LAYOUT - SECTOR F SECTOR A SECTOR B SECTOR E SECTOR D SECTOR C
Preliminary Y-chamber specifications – First draft
European Organization for Nuclear Research
The Interaction Region
CBM beam pipe current status
Optical Fibre Winder meeting #2 – Design introduction
Vacuum chamber for the CMS forward region
G. Carboni for the Muon Group
IDEA Detector Simulation Status
The IR beam pipe M. Sullivan For
ILD-0 overall dimensions C.Clerc ILD meeting, Seoul 17/02/09
Optimisation of the FETS RFQ
Visit for more Learning Resources
Challenges for FCC-ee MDI mechanical design
Simplifying Expressions in Algebraic Expressions
LHCb VErtex LOcator For precision measurements of CP-violation at CERN (GENEVE) HALF of DETECTOR Si strip detector Read-out electronics Secondary vacuum.
Detector Description in LHCb
LHCb VErtex LOcator ENGINEERING DEPARTMENT
Isotropic View Conceptual Design for MONALISA setup at CERN Magnet
Chapter Four Engineering Communication
Chapter Four Engineering Communication
Chapter Four Engineering Communication
TECH 104 – Technical Graphics Communication
Beam Halo Considerations for Back Angle Running
IR Beam Transport Status
Rough designs for The LEB and HEB for pCDR-100
Presentation transcript:

XML Description of Beam Pipe Geometry  For XML description of Beam Pipe were used: Det/XmlDDDB/v6, Det/XmlEditor/v4, Det/DetDesk/v8, Vis/GaudiLab/head Det/XmlDDDB/v6, Det/XmlEditor/v4, Det/DetDesk/v8, Vis/GaudiLab/head  Engineering Drawings of Beam Pipe with last proposed numbers by Gloria (web Beam Pipe 10/7/2001, pipe7.22.cdf )  Not final description: Beam Pipe construction is under the study Galina Pakhlova ITEP, Moscow LHCb-Computing meeting CERN 27/8/2001

2 Simple elements of Beam Pipe hkhk Numbers of simple elements : Cylindrical and Conical sections Flanges, Rings and Bellows and Materials: Al, AlBeMet160,St.Steel Thickness of Pipe: from 1.0*mm to 4.0*mm

3 Bellows and Cones In XMl Description each Bellow is simplified as logvolume with 2 Conical tubes 2 Conical tubes and Cylindrical tube between Beam Pipe includes 4 Bellows 4 Bellows

4 Beam Pipe XML Description Possibility Few ways to describe Beam Pipe: Few ways to describe Beam Pipe: - Logvolume as one long material=vacuum with simple elements inside - Logvolume as one long material=vacuum with simple elements inside Detector parts are too close to Beam Pipe, clearance is too small. Detector parts are too close to Beam Pipe, clearance is too small. - Logvolume as Union of simple elements: union of and gives unpredictable result in GaudiLab/head and overlapping does not help! union of and gives unpredictable result in GaudiLab/head and overlapping does not help! - Logvolume without shape and material with simple elements inside without clearance between them. Very quick and easy description with minimum parameters, simple *.xml files, no problem with GaudiLab. Very quick and easy description with minimum parameters, simple *.xml files, no problem with GaudiLab. Problems??? May be later… Problems??? May be later… Beam Pipe was divided into 5 Pipe Sections Beam Pipe was divided into 5 Pipe Sections

5 Beam Pipe Section1 Section1 includes: Cylindrical section with Flange and Ring Conical section (25 mrad) with Flange and Ring Conical section (-37 degree) Cylindrical section with Flange 9 physvolumes Starts at Z~1m, Length~1.5m

6 Beam Pipe Section 2 Section 2 includes: 3 Conical sections (10 mrad) 2 Flanges 2 Bellows (cone+cylinder+cone) 7 physvolumes Starts at Z~2.5m, Length~0.5m

7 Beam Pipe Section 3 Section3 includes: 4 Conical sections (10 mrad) 4 Flanges Support Ring 9 physvolumes Starts at ~3m, Length ~10m

8 Beam Pipe Section 4 Section 4 includes: 3 Conical Sections (10 mrad) Flange 2 Bellows (cone+cylinder+cone) 6 physvolumes Starts at ~13m, Length~1.5m

9 Beam Pipe Section 5 Section 5 includes: 2 Conical sections (10 mrad) Conical section (-17 degree) Cylindrical section 4 physvolumes Starts at ~14.5 m, Length~5.5m

10 Visualization of Beam Pipe Beam Pipe with 5 Pipe Sections installed: 3 Cylindrical Sections 16 Conical Sections 10 Flanges 3 Rings 4 Bellows 36 physvolumes about 200 parameters Starts at Z~1m, Length~19m

11 Again about GaudiLab Again about GaudiLab Problems with GaudiLab/head: Problems with GaudiLab/head: ! No = + ! No = + ( XML Beam Pipe Description ) ( XML Beam Pipe Description ) ! No = - ! No = - general trapezoid (Magnet XML Description) general trapezoid (Magnet XML Description) ! Impossible to visualize ECAL as a whole ! Impossible to visualize ECAL as a whole attempt to put in memory all elements of ECAL? attempt to put in memory all elements of ECAL? ! Visualization itself is not friendly yet ! Visualization itself is not friendly yet (nothing new from the last software week) (nothing new from the last software week)

12 Conclusion XML Description of Beam Pipe/v1 is done Not in CVS yet: Some tests should be done XML description of ECAL/v1 is done (tomorrow report at CALO software meeting) Not in CVS yet: GaudiLab problems XML description of new version of Magnet Geometry in progress: GaudiLab Problems (No Visualization) need to be solved as soon as possible