SPS Enamelled flanges Simulations & Measurements Fritz Caspers and Jose E. Varela.

Slides:



Advertisements
Similar presentations
Microwave Instability : Importance of impedance model
Advertisements

Using the real lattice and an improved model for the wake field, the extraction jitter can now be calculated more accurately. Assuming an injection jitter.
PETS components and waveguide connections CLIC Workshop 2007 David Carrillo.
1 Fields and Signals in Coupled Coaxial and Cylindrical Cavities John C. Young Chalmers M. Butler Clemson University.
Emittance Measurement Simulations in the ATF Extraction Line Anthony Scarfe The Cockcroft Institute.
3D Target Simulations with Front Tracking/Ghost Fluid Method Wurigen Bo (Sept. 9, 2009) Brookhaven National Lab.
1 IR Vacuum M. Sullivan MAC Review Jan , 2006 M. Sullivan for the Machine Advisory Committee Review January 18-20, 2006 IR Vacuum.
Finite wall wake function Motivation: Study of multi-bunch instability in damping rings. Wake field perturbs Trailing bunches OCS6 damping ring DCO2 damping.
Longitudinal instabilities: Single bunch longitudinal instabilities Multi bunch longitudinal instabilities Different modes Bunch lengthening Rende Steerenberg.
Effect of Mutual Coupling on the Performance of Uniformly and Non-
Efficient design of a C-band aperture-coupled stacked microstrip array using Nexxim and Designer Alberto Di Maria German Aerospace Centre (DLR) – Microwaves.
Design of Compact and Sharp-Rejection Ultra Wideband Bandpass Filters Using Interdigital Stepped-Impedance Resonators IEICE TRANS. ELECTRON., VOL.E90–C,
Introduction to beam impedance O.Berrig 23/
Impedance and Collective Effects in BAPS Na Wang Institute of High Energy Physics USR workshop, Huairou, China, Oct. 30, 2012.
Ivan Bazarov, Single HOM two-pass analysis, SRF mtg, 4 June CHESS / LEPP Single HOM, two-pass analysis Motivation: explain the plot produced by.
Sensorless Sliding-Mode Control of Induction Motors Using Operating Condition Dependent Models 教 授: 王明賢 學 生: 謝男暉 南台科大電機系.
Acknowledgements F. Caspers, H. Damerau, M. Hourican, S.Gilardoni, M. Giovannozzi, E. Métral, M. Migliorati, B. Salvant Dummy septum impedance measurements.
Beam observation and Introduction to Collective Beam Instabilities Observation of collective beam instability Collective modes Wake fields and coupling.
Simulation of Beam Instabilities in SPring-8 T. Nakamura JASRI / SPring-8
Status of the SPS impedance model C. Zannini, G. Rumolo, B. Salvant Acknowledgments: H. Bartosik, O.Berrig, G. Iadarola, E. Métral, N. Mounet, V.G. Vaccaro,
Beam Pattern for a Single Slot Antenna Larry Isenhower Summer 2002.
Update of the SPS transverse impedance model C. Zannini, G. Rumolo, B. Salvant Acknowledgments: H. Bartosik, O.Berrig, F. Caspers, E. Chapochnikova, G.
Shielding of the SPS Vacuum Flanges - Design Studies – Update Jose E. Varela and Jaime Perez 21 May 2015.
2.1 GHz Warm RF Cavity for LEReC Binping Xiao Collider-Accelerator Department, BNL June 15, 2015 LEReC Warm Cavity Review Meeting  June 15, 2015.
Lecture 25 - E. Wilson - 12/15/ Slide 1 Lecture 6 ACCELERATOR PHYSICS HT E. J. N. Wilson
The Quadrupole Pick-up in the CPS -intro and progress report PPC 3 Dec 1999 A. Jansson.
Outline: Motivation Comparisons with: > Thick wall formula > CST Thin inserts models Tests on the Mode Matching Method Webmeeting N.Biancacci,
SPS flanges Simulations & Measurements Update Fritz Caspers and Jose E. Varela.
CLIC workshop 2015 EXTRACTION KICKER STRIPLINE MEASUREMENTS C. Belver-Aguilar (IFIC) On behalf of: A. Faus-Golfe (IFIC), F. Toral (CIEMAT), M.J. Barnes.
Longitudinal Impedance Characterization of the SPS MBA-QF Unshielded Pumping Ports Simulations, bead-pull and wire measurements Fritz Caspers, Jonas Ghini.
Constant Impedance Tunable IOT Power Extraction Circuit Amith Hulikal Narayan February 10, 2016.
SPS flanges Simulations & Measurements Update Fritz Caspers and Jose E. Varela Acknowledgements: Jose A. Ferreira and Thomas Bohl.
Main activities and news from the Impedance working group.
2 February 8th - 10th, 2016 TWIICE 2 Workshop Instability studies in the CLIC Damping Rings including radiation damping A.Passarelli, H.Bartosik, O.Boine-Fankenheim,
LER workshop 2014 Update on the Extraction Kicker for CLIC DRs: Calibration Tests C. Belver-Aguilar (IFIC) On behalf of: A. Faus-Golfe (IFIC), F. Toral.
Outcome of beam dynamics simulations - Scenarios, requirements and expected gains s LIU-SPS Coordination meeting 26/08/2015 A. Lasheen, E. Shaposhnikova,
Flange Insulation and Grounding in the SPS Jose E. Varela 06 October 2015.
Midterm Review 28-29/05/2015 Progress on wire-based accelerating structure alignment Natalia Galindo Munoz RF-structure development meeting 13/04/2016.
DESIGN OF TOOTHED LOG PERIODIC ANTENNA
Summary of discussion on isolating flanges E. Shaposhnikova With input from LIU-SPS BD WG (in particular H. Bartosik, F. Caspers and J. Varela), K. Cornelis,
New Contributions to the SPS Longitudinal Impedance Model
Synchrotron frequency shift as a probe of the CERN SPS reactive impedance s HB2014 – 11/13/14 A. Lasheen, T. Argyropoulos, J. Esteban Müller, D. Quartullo,
SPS Longitudinal Impedance Simulations & Measurements Update Benoit Salvant, Carlo Zannini, Thomas Bohl, Helga Timko, Fritz Caspers, Elena Shaposhnikova.
Before the presentation: a short introduction
Agenda for today Today we will do another tutorial example together to continue introduction to Lumerical FDTD software. Task #1: Tune the resonance frequency.
FORTH - Modelling Issues addressed
Follow up on SPS transverse impedance
Longitudinal beam parameters and stability
10 MHz amplifier status G. Favia
Parallel Density-based Hybrid Clustering
Benchmarking the SPS transverse impedance model: headtail growth rates
Update on PS Longitudinal Impedance Model
Measurement of “new” SPS-WS
TRANSVERSE RESISTIVE-WALL IMPEDANCE FROM ZOTTER2005’S THEORY
ATF Fast Kicker R&D at LBNL ILCDR06, Cornell University
Small step towards understanding bench measurements’ curves
Beam impedance of 63mm VM with unshielded Bellows
impedance aspects for the beam screen
Impedance working group update 21st August 2013
CEPC Main Ring Cavity Design with HOM Couplers
Longitudinal Impedance Studies of VMTSA
Simulations and RF Measurements of SPS Beam Position Monitors (BPV and BPH) G. Arduini, C. Boccard, R. Calaga, F. Caspers, A. Grudiev, E. Metral, F. Roncarolo,
Generic S-parameters Considerations for Extending the Touchstone File Format EEsof EDA John Moore R&D Tech Lead January 10, 2007 Generic S-parameters.
FEA of strut sample.
TRANSVERSE RESISTIVE-WALL IMPEDANCE FROM ZOTTER2005’S THEORY
Elias Métral ( min, 19 slides)
CEPC Waveguide HOM 5-cell and 2-cell Cavity Study and EP Facility
Probability.
Lecture 6 ACCELERATOR PHYSICS HT E. J. N. Wilson
Status of the EM simulations and modeling of ferrite loaded kickers
Presentation transcript:

SPS Enamelled flanges Simulations & Measurements Fritz Caspers and Jose E. Varela

Outline Introduction Simulations Measurements Next Steps Conclusions

Introduction We are tracking down a, possibly, 1.4GHz microwave instability in the SPS. We are working now to asses the possibility that the enamelled flanges are the ones responsible of this instability. Several Wake field simulations and measurements have been carried out.

Simulations A new model has been built. Several 30Mcell wake field simulations (≈1.5 days/sim.) have been carried out. Electromagnetically complex structure - Very resource demanding.

Simulations Simulation results are NOT consistent. Further research, together with the impedance group, is going on. On the bright side: All simulations show impedance peaks around 1.4 and 3.4.

Measurements Several different measurements have been carried out. No meaningful results have been obtained jet. Until now we have encountered several difficulties: The enamel flange available was not isolating. The pick-ups along the ring are “floating”, i.e. they are not grounded in the tunnel. The “ensemble”, flange + bellow, has many resonances around the frequency of interest. We have found that it is very difficult to sort them out.

Measurement Measured scattering parameters of the wire measurement set-up.

Next Steps Carefully study the work of G. Dome back in He made a theoretical study and carried out several measurements on “all” the bellow + beam pipe combinations. As a result, a number of bellow now have “resistors” to damp the resonances.

Next Steps Simulations: – Discuss the results with the impedance working group. – Include the “real” environment of the flanges. Study all possible combinations.

Next Steps Measurements – Consider stop trying to sort out the harmful resonance between the many that we see and focus our efforts in trying to measure what the “beam sees”. – Try to find a “naked” flange. The fact that the flange is attached to the pickup makes our life difficult.

Conclusions The problem under consideration is very complex. Simulations have not provided consistent results. “Trees don’t let us see the forest” when we try to measure. Work in progress – any ideas are welcomed.

Simulations (additional) A 30Mcell simulation allows “accurate” modelling of the structure.