WP5: – STATUS REPORT EUCARD Steering Committee Meeting INFN-Frascati, November 4-5, 2009 Outline  HiRadMat – overview/reminder  Project.

Slides:



Advertisements
Similar presentations
HiRadMat : report from WG2&3 – WANF dismantling January 15, 2010S. Evrard 1 Worksite: activities achieved or in progress WANF cleaning: status Proposal.
Advertisements

Summary of the Design Report and Next Steps Edda Gschwendtner for the CERN AWAKE Project Team Edda Gschwendtner, CERN1.
NFMCC Meeting - 13 March 2006 I.Efthymiopoulos, A.Fabich, CERN AB-ATB-EA1 MERcury Intense Target (MERIT) Experiment Installation Issues I. Efthymiopoulos.
MERcury Intense Target (MERIT) Experiment – or nTOF-11 Mercury System Safety Review Ilias Efthymiopoulos Adrian Fabich (CERN - AB-ATB-EA) Hg-system Safety.
HIRADMAT IN THE WANF TUNNEL I. E FTHYMIOPOULOS, EN/MEF  HIRADMAT-Exp.Area Working Group  EN/MEF : I. Efthymiopoulos, A. Pardons, M.Lazzaroni, N. Gilbert.
STATUS REPORT ON HIRADMAT I. E FTHYMIOPOULOS, EN/MEF  Slides taken from HIRADMAT presentation to A&T management  R. Assmann, C. Hessler, I. Efthymiopoulos,
NuMI NuMI Overview NBI 2002 S. Childress (FNAL) 14 March ‘02 NuMI / MINOS Overview.
Collimation Meeting Tests on a Fully Assembled TCT Collimator in the HiRadMat Facility M. Cauchi, D. Deboy, on behalf of the Collimation Team.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Highlights of RP activities in support of ISOLDE operation and projects Joachim Vollaire, Alexandre Dorsival and Christelle Saury with material from others.
Partikeldagarna, Göteborg 21 September 2007 LHC: Status and Plans Lyn Evans.
Machine development - results and plans – critical results, what’s to be done? R. Assmann 15/07/2011 R. Assmann for the LHC MD coordination team (R. Assmann,
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
First radiological estimates for the HIRADMAT project H. Vincke and N. Conan 1.
Radiation Protection aspects for SHIP Doris Forkel-Wirth, Stefan Roesler, Helmut Vincke, Heinz Vincke CERN Radiation Protection Group 1 st SHIP workshop,
HIGH RADIATION TO MATERIALS P ROJECT R EPORT IEFC Workshop, session 4 CERN, February 11, 2010 Outline  The HiRadMat facility – what is it?  Project overview.
LHC-CC Validity Requirements & Tests LHC Crab Cavity Mini Workshop at CERN; 21. August Remarks on using the LHC as a test bed for R&D equipment.
HIGH RADIATION TO MATERIALS: EXPERIMENTAL AREA HiRadMat Users meeting, 14/7/2011 Outline  Location  Test zone  Test tables geometry and position  Services.
HIGH RADIATION TO MATERIALS: HIRADMAT STATUS HiRadMat Scientific Board, 23/4/2012 Outline  Location  Status  Beam line  Infrastructure  Exp. Area.
HIGH RADIATION TO MATERIALS 20 TH P ROJECT T EAM M EETING – O CTOBER 14, 2010 Project Team Meeting CERN, October 14, 2010  Beam requests - operation I.
LHC Injectors Upgrade Project 1/12/2010 R. Garoby.
Final Report – Injector Re- Commissioning Working Group (IRWG) Working group to find strategy for more efficient start-up of injectors and associated facilities.
R. Assmann, June 2009 Operational Experience with the LHC Collimation System R. Assmann, CERN 8/6/2009 for the Collimation Project Team Visit TU Munich.
HIGH RADIATION TO MATERIALS Ans Pardons for the HiRadMat project team IEFC Workshop, March 22, 2011 Outline  The HiRadMat facility – Why, What, When,
TPSG4 validation at HighRadMat #6 Cedric Baud, B. Balhan, Jan Borburgh, Brennan Goddard, Wim Weterings.
Proton-Driven Plasma Wakefield Acceleration CERN Project Structure Edda Gschwendtner, CERN Lisbon Meeting, 22 June 2012Edda Gschwendtner, CERN2.
The HiRadMat Facility Outline  Location  Status  WANF dismantling  Beam line  Experimental area  Schedule  Project management S. Evrard – EN/MEF.
A. Herlert, CERN PH-IS ISOLDE scientific coordinator’s report INTC meeting, May 19, 2008 ISOLDE scientific coordinator’s report INTC meeting, May 19, 2008.
HiRadMat : Coordination meeting 02 October S. Evrard 1 News from project team General information : access,... PR532 repair : plans Existing services.
Summary Session 5 Chamonix 2011, 24. – Session 5: “High Intensity: Present and Future” R. Assmann & S. Redaelli Thanks to Frank Z. for his notes…
Eric Prebys, Fermilab Program Director, LARP July 10, 2012.
PRESENT AND FUTURE TEST FACILITIES FOR HIGH- INTENSITY TARGETRY CERN I.Efthymiopoulos, CERN with input from Jacques Lettry & Rende Steerenberg.
Thanks to all members of organisation committee for the preparation of this event Thanks to all participants for their interest R.Schmidt Introduction.
LARP Crab Cavities Cryomodule Integration Meeting Final Notes A.Ratti LBNL.
Upgrade of the irradiation facilities in the PS East Hall Maurice Glaser, Michael Moll 30 April 2010 – PH-DT steering board meeting activities are part.
HiRadMat Summary of Phase-I and plans for Phase-II commissioning J. Blanco, N. Conan, V. Kain, K. Cornelis, B. Goddard, C. Hessler, M. Meddahi, C. Theis,
HiRadMat Primary Beam Overview C. Hessler, B. Goddard, M. Meddahi On behalf of the HiRadMat Primary beam line working group HiRadMat Project Review
LS1 Day: The Injectors S. Baird EN/MEF Thanks to R Brown, N Gilbert, D McFarlane & V Chohan, IEFC workshop…. LS1 Day: The Injectors 1.
Engineering Department ENEN Introduction to EuCARD2 WP 11: Collimator Materials for fast High Density Energy Density Deposition (ColMat-HDED) Alessandro.
29 October 2015 B. Di Girolamo. B. Di Girolamo – Collider-Experiments Day – 5 th HiLumi Annual Meeting 2 Collider-Experiments Interactions There is a.
V. Raginel, D. Kleiven, D. Wollmann CERN TE-MPE 2HiRadMat Technical Board - 30 March 2016.
Summary of IAP comments from 2007 EURISOL Town Meeting
ColMat Welcome and Task 1 Ralph W. Aβmann Kick off Meeting of EuCARD/ColMat CERN – June 17 th, Jun 09 1R. Assmann.
on behalf of the Phase II Collimation Design team
News and Introduction from CERN June 15th, 2005
ICE SECTION The coolest place to be! Elias Métral
HiRadmat requests A. Fabich MSWG, 30. January 2015.
Access to material testing facilities (WP10)
S. Roesler (on behalf of DGS-RP)
WP13: Access to Plasma Beam testing facilities
M. Tomut GSI Helmholtzzentrum für Schwerionenforschung
Installation of an Instrument on a CERN machine
Outlook by the Physics Coordinator
“hot spots” SIS100 internal beam dump Super-FRS production target
Accelerator Research and Innovation for European Science and Society
High Radiation to Materials HiRadMat Project : Construction, Installation & Operation of the facility Reminder : brief overview of the facility News.
Target and Horn status report
High Radiation to Materials 16th Project Team Meeting – May 20, 2010
Steering Meeting of EuCARD
Steering Meeting of EuCARD
Accelerator R&D for Future Neutrino Projects
2th EuCard Col/Mat WP Meeting
Beam Dump outline work plan (UK perspective)
W. T. Weng Brookhaven National Laboratory
HiRadMat Test Facility
Present and Future test facilities for High-intensity Targetry CERN
Experimental Areas – LS2 planning
Beam Line to the HiRadMat Test Facility
A High Intensity Neutrino Oscillation Facility in Europe
East Hall under construction
Presentation transcript:

WP5: – STATUS REPORT EUCARD Steering Committee Meeting INFN-Frascati, November 4-5, 2009 Outline  HiRadMat – overview/reminder  Project : status – work plan  Web pages - Open access  Summary I. Efthymiopoulos – CERN

The HiRadMat Facility ie-EUCARD-SC, Nov 4-5,  Study the impact of intense pulsed beams on materials  Thermal management (heating) material damage even below melting point material vaporization (extreme conditions), cavitation  Radiation damage to materials – change of properties  Thermal shock - beam induced pressure waves  Test bed, important for the design validation of LHC near-beam components before installation in the machine  Requires LHC-type beam from pilot to 288 nominal bunches  Foreseen clients : LHC collimators, protection devices, machine components, material studies (bulk, superconductors), high-power targetry, irradiation tests of electronics What is it?

The HiRadMat Facility ie-EUCARD-SC, Nov 4-5, Examples High-intensity beam on a solid target MERIT experiment: High-intensity beam on a liquid Hg-target High Energy Density Plasma formation, proton “Tunneling Effect” LHC collimator: Displacement analysis – 500kW load case for 10s Loss rate 4x10 11 p/s (Beam Lifetime 12min)

The HiRadMat Facility ie-EUCARD-SC, Nov 4-5, Primary beam layout SPS TI 2 T9 target area / TNC TT60 Beam End of common part with TI 2 transfer line 50 m C. Hessler, 26/01/09 Beam TT66 line (new)

The HiRadMat Facility ie-EUCARD-SC, Nov 4-5,  Beam in shared mode during SPS operations Primary proton/ion beam parameters ParameterUnitValue (proton beam)Value (lead ion beam) Beam energyGeV ×10 3 (177.4 GeV/n) Bunch intensityparticles5×10 9 to 1.15(1.75)× ×10 9 to 4.1×10 10 Bunch lengthcm11.2 Number of bunches-1 – 2881 – 592 Bunch spacingns25 ≥ 25 Pulse energyMJ2.428×10 -3 Pulse length ss 7.2 Peak powerGW Normalized emittance (1  ) mm  x ×  y at exp. (baseline) mm  x ×  y at exp. (request) mm – 4.0 Integrated beam intensity (protons) protons/year 10 experiments × protons(max)/exp ~30  100 extractions/exp

The HiRadMat Facility ie-EUCARD-SC, Nov 4-5, Irradiation area layout: TT66 line & TNC tunnel Test area  ~10 m long. space upstream the T9 target  [1.5,3.0] m lateral space  Possibility for fast installation of experiments  Cool-down space downstream the TNC tunnel  If requested, areas for test of electronics or component irradiation can be prepared

The HiRadMat Facility ParameterValue Experiments per year10 Maximum intensity per experiment 1×10 15 protons <30 full intensity pulses Waiting time after experiment for de- installation ≥ 2 weeks Access during experiment (except urgent interventions) no Control of experiment and data taking remote Maximum intensity per year1×10 16 protons ParameterValue Installed experiments1 Material exposed to beamC, CFC, Cu, W, hBN, Al, Be, …, advanced composite materials Volume of exposed material≤ 16,800 cm 3 Equipment size  Length (flange-to-flange)  Width  Height below beam line  Height above beam line  ≤ 7.0 m  ≤ 1.0 m  1.1 m  ≤ 0.8 m Weight≤ 4,000 kg Handling zone (L × W × H) 15  2.0  2.2 m 3 Equipment supportcomes with experiment – quick installation interface required Cool-down spacesee equipment size Crane supportmobile cranes sufficient Handlingprepare fast handling and remote installation with crane ie-EUCARD-SC, Nov 4-5, Design parameters for the experimental area Specification document  Additional requirements for the exp. area will depend on the type of equipment and test planned  Safety and RP constraints should come in addition

The HiRadMat Project ie-EUCARD-SC, Nov 4-5,  The facility was originally proposed by R. Assmann in 2006 and included as part of the new initiatives program of CERN. A working group, coordinated by R. Assmann, did a conceptual design. The results were presented to A&T sector management in February 2009, and a summary specification document is under publication.  The creation of the HiRadMat facility was included and recommended in the summary Memo from the CERN Irradiation Facilities WG (Lucie Linssen/PH – chair)  The HiRadMat Project was approved in summer’09 and included in the CERN MTP for 6MCHF  Project leader : Ilias Efthymiopoulos (EN/MEF)  Target dates : First beam in the facility by June 2011 then two months of commissioning, first users by Q  HiRadMat is also included in the EUCARD/FP7 project as Transnational Access   Funds available to support EU users for the exploitation of the facility – within limits! Overview - reminder

The HiRadMat Project ie-EUCARD-SC, Nov 4-5,2009 Project structure 9 HiRadMat Facility Project Project Leader : I. Efthymiopoulos Deputy PL : S. Evrard Project Team User Selection Panel Operation Primary beam WG M. Meddahi, C. Hessler WANF Dismantling WG S. Evrard, Hel. Vincke Irradiation area WG A. Pardons, S. Evrard Beam Commissioning M. Meddahi Operation & Maintenance CCC, M. Lazzaroni (superintendent) User support Team EN/MEF A & T Sector Mgmt SPS & LHC Physics coordinators & scientific committees IEFC Committee  Safety:, L. Bruno, GS, E. Paulat  RP issues: Y. Algoet, L. Ulrici  Planning : H. Gaillard, N. Gilbert  Integration : M. Lazzaroni  External collaborators : SLAC team  Users : invited/informed (R. Assmann, B. Goddard, R. Schmidt, J. Blanco-Sancho…)

The HiRadMat Facility ie-EUCARD-SC, Nov 4-5,  Ongoing work to finalize the functional specifications for the facility.  First contact to (known) users for Beam Request Survey  WGs starting their work : prepare work packages and contact various groups for resources and budget estimates  Project review January 19-20, 2010  A doctoral student funded by EUCARD will start on April’10 – focus on RP issues for the design and operation of the faclity  Schedule guidelines:  Access in BA7/TCC6 is limited due to LHC operation. Try to profit the most from the foreseen LHC technical stops (~3 days/month)  flexibility !!!  Plan : dismantling from WANF equipment completed in 2009/2010  access limitations installation of new TT66 beam line and irradiation area in TNC in 2010/2011 shutdown  competition with other shutdown works in the injectors after the 20month operation Status Very challenging!

The HiRadMat Facility ie-EUCARD-SC, Nov 4-5, Tentative schedule

EUCARD/WP5 – HiRadMat  Web pages for project and open access available   Article in CERN Courier in 2010 to advertize the facility? – other ideas? ie-EUCARD-SC, Nov 4-5, Status

EUCARD/WP5 – HiRadMat ie-EUCARD-SC, Nov 4-5,  First contact with the users  Known colleagues (~35) from CERN and outside labs LHC equipment: obstacles, vacuum, beam instrumentation, electronics Target R&D : isolde, neutrino beams Material R&D  Asked to fill BeamRequestSurvey form as feedback for the design specifications of the facility  stakeholders  Doctoral student funded by WP5 selected  Will start on April’10 with FLUKA simulations for RP characterization and access conditions for the facility  Most likely his Ph.D will be submitted at EPFL (Prof. L.Rivkin) Status

EUCARD/WP5 – HiRadMat ie-EUCARD-SC, Nov 4-5,  The HiRadMat project is getting into shape  Excellent team and WG coordinators  Project review last week of January 2010  Q as target date for user access remains, but the schedule is very challenging – we’ll do our best to make it! Leaves ~7(11) weeks in full 2012 run for users/open access  WP5/Transnational Access EUCARD web pages done  First official announcement to users for Beam Request Survey  8 replies so far, more to come…  Next step: finalize user selection procedures and related documentation Summary Thank you!