All Experimenters Meeting PIP Report Fernanda G. Garcia on behalf of PIP team 10/06/2014.

Slides:



Advertisements
Similar presentations
PIP Update Oct Agenda Summary Update – Current Activities/Updates – Recent PIP News – Upcoming Talks, Reports, Meetings Updates/Talks: Ken Domann.
Advertisements

F.Brinker, DESY, July 17 st 2008 Injection to Doris and Petra Fitting the detector in the IP-region Radiation issues Beam optic, Target cell Polarisation.
MuCool RF Status MICE Collaboration Meeting June 7-10, 2006, Fermilab A. Moretti June 9, 2006.
Proton Source Workshop December 7 & 8, 2010 John Reid December 8, 2010.
NOvA meeting PIP Update W. Pellico. PIP Goals and Scope (Provided in 2011 – Directorate S. H. / DOE Talk ) Goals: Specific to the issues surrounding the.
PIP Update June 25 th Agenda Summary Update – Current Activities/Updates – Ryan Crawford: Anode Supply Update – Peter Prieto: BPM Update – CY Tan:
PIP Update Linac Utilities for 2014 shutdown Matthew Gardner, 4/23/14.
ANU Shutdown Status AEM meeting Cons Gattuso 6/3/2012.
Proton Plan PMG 3/22/07 E Prebys 1 Proton Plan Status February Eric Prebys.
Proton Improvement Plan (FY13 PMG Q4). William Pellico, Fermilab PMG, Nov PIP FY13 Q4 Summary Task Highlights Budget and Labor Review Summary.
PIP Update April 30 th Agenda Summary Update – Current Activities/Updates – Nathan Eddy – Booster Longitudinal Damper.
PIP Update Aug 6 th Agenda Summary Update – Current Activities/Updates – New Tuner Test Result: Reid & Slabaugh – Anode Supplies: Crawford.
Proton Improvement Plan Bob Zwaska August 3, 2015 All-Experimenters Meeting.
Getting Beam to NuMI (It’s a worry!) Peter Kasper.
PIP Update Feb 20 th Agenda Summary Update – Current Activities/Updates – Startup Schedule Highlights – Upcoming Talks, Reports, Meetings Updates/Talks:
Muon Campus Projects Jerry Annala Jan 23, µ AIP Scope Recycler RF system to provide needed bunch structure to future Muon Experiments Recycler RF.
All Experimenters Meeting PIP Report William Pellico on behalf of PIP team 4/7/2013.
09/28/07Shutdown’07 Week 8 F.G. Garcia1 MTA beam line installation Weekly Report September 28, 2007 Period covered: September 24 th September 28 th (Week.
PIP Update Jan Agenda Summary Update – Current Activities – Updates (Ken, Pat and John) – Additional Meetings/Notes.
All Experimenters Meeting PIP Report Fernanda G. Garcia on behalf of PIP team 11/04/2013.
Proton Improvement Plan Bob Zwaska July 7, 2014 All-Experimenters Meeting.
PIP Update Dec. 4th Agenda Summary Update – Current Activities/Updates – Recent PIP News – Upcoming Talks, Reports, Meetings Updates/Talks: Trevor.
PIP Update June 3 rd Agenda Summary Update – Current Activities – Updates Ken Domann – Budget & Schedule Ryan Crawford – Anode Supply Update – Additional.
PIP FY14 PMG W. Pellico 7/8/14 7/8/2014PIP PMG. PIP Activities RIL & Linac – 200MHz RF Power System High Level RF Linac Modulator 7835 Procurement – Accelerator.
2015 Shutdown Joe Compton 3/11/2015. RIL PIP Work  Install operational laser notcher  5 days  Dave Johnson & Todd Johnson.
Accelerator and NuMI Upgrades Shutdown Update Cons Gattuso July 02, 2012 July 2, 2012 Cons Gattuso1.
Proton Improvement Plan Bob Zwaska January 7, 2013 All-Experimenters Meeting.
F Proton Plan Eric Prebys, FNAL Accelerator Division.
PIP Update Dec. 4th Agenda Summary Update – Current Activities/Updates – Recent PIP News – Upcoming Talks, Reports, Meetings Updates/Talks: Ken.
PIP Update Oct Agenda Summary Update – Current Activities Updates/Talks: Dave Johnson – Linac Notching (laser)
PIP FY15 PMG W. Pellico PIP PMG March 5 th PIP FY15 Year to Date Outline –FY15 activities PIP quarterly milestones Linac Booster Project Controls.
Proton Improvement Plan Keith Gollwitzer January 5th, 2015 All Experimenters’ Meeting 11/5/2015Gollwitzer AEM.
MINU GPP WBS 1. Main Injector Neutrino Upgrades - Infrastructure Project Dixon Bogert APD Department Report – March 7, 2007 Russ Alber - FESS Engineering.
PIP Update July 30 th Agenda Summary Update – Current Activities/Updates – Project Controls Update: K. Domann – Linac Lattice – Valeriy Kapin.
PIP Update April 8 th Agenda Summary Update – Current Activities – Updates (V. Kapin: Booster Collimator) – Additional Meetings/Notes.
PIP Update April 8 th Agenda Summary Update – Current Activities – Updates (Joe Compton - shutdown) – Additional Meetings/Notes.
All Experimenters Meeting PIP Report Fernanda G. Garcia on behalf of PIP team 07/01/2013.
PIP Budget Codes Budget FY12 Updates October 19, 2011 PIP Meeting.
Proton Improvement Plan Bill Pellico April 19, 2013 NOvA collaboration Meeting Bill Pellico NOvA.
Accelerator Status and Plans
Proton Improvement Plan Overview Bob Webber July 13, 2011.
PIP Update June 17 th Agenda Summary Update – Current Activities – Updates (Alexander Valishev - Simplified Modeling of Space Charge Losses in Booster.
PIP Update June 18 th Agenda Summary Update – Current Activities/Updates – Reid, Slabaugh.
Proton Improvement Plan (FY13 PMG Q3). William Pellico, Fermilab PMG, Aug PIP FY13 Q3 Summary Task Highlights Budget and Labor Review Summary.
PIP Update Aug. 21 st Agenda Summary Update – Current Activities/Updates – Startup Plans – Upcoming Talks, Reports, Meetings Updates/Talks: B Pellico.
Substation L1/ MCC L1 Update #2 July 27,2012. Status of Procurement  Substation  All approval drawings submitted  Testing is expected to take place.
PIP Update April 3 rd Agenda Summary Update – Current Activities/Updates – Startup Plans – Upcoming Talks, Reports, Meetings Updates/Talks: Trevor.
Proton Plan PMG 2/22/07 E Prebys 1 Proton Plan Status January Eric Prebys.
High Intensity Booster Operations William Pellico PIP II collaboration Nov. 9 th 2015.
PIP Update Dec 17 th Agenda Summary Update – Current Activities – Updates – Additional Meetings/Notes.
SNuMI: WBS 1.1 Booster Upgrades Eric Prebys $642K FY06$ (no contingency, no G&A) xx% contingency Main Injector & Recycler BNB NuMI Tunnel Booster Ring.
Proton Planning Eric Prebys FNAL Accelerator Division.
Booster Shutdown Work - Week 4 Dump and Shielding installation completed Q805/Q806 re-installed, Septum in place Need to align quads and septum before.
High power RF tests places at CERN O. Brunner, CERN 4th SPL Collaboration Meeting jointly with ESS.
PIP Update Oct 29 th Agenda Summary Update – Current Activities – Updates – Additional Meetings/Notes.
August 2007 Booster RF Upgrades J.Reid Booster RF Upgrades West Gallery LCW modifications: – Headers in select locations to be upgraded by.
Proton Improvement Plan Bob Zwaska September 9, 2013 All-Experimenters Meeting.
PIP Update July 29 th Agenda Summary Update – Current Activities – Updates Tom Kubicki (Station 20,21,22 – Gallery and Equipment Work) – Additional.
PIP Update August 12 th Agenda Summary Update Current Activities Update – Ryan Crawford - Booster Anode Power Supplies – Dave Johnson - Laser Notcher.
PAC Meeting, December 12, Prebys 1 The Problem.
PIP Update March 6 th Agenda Summary Update – Current Activities/Updates – Startup Schedule Highlights – Upcoming Talks, Reports, Meetings Updates/Talks:
PIP Update May 28 th Agenda Summary Update – Current Activities/Updates – Ken Domann.
PIP Shutdown Status 9/17/2014. RIL/Linac Jobs L1 Transformer ◦Rigging complete ◦Electrical work started ◦Turn on this coming weekend Laser notcher flange.
Booster High Power RF at PIP-II Era John Reid February 18, 2014.
Proton PMG September 3 rd 2015 Cons Gattuso AD Shutdown Manager.
PIP Update May Agenda Summary Update – Activities – Budget – Plans Update Slides – Solid StateTom – ModulatorsRene – High Power Ferrite Testing.
PIP Update June 17 th Agenda Summary Update – Current Activities – Updates (Matt – Cavity Refurbishment) – Additional Meetings/Notes.
10/3/2014 Proton Source Update. RIL Update Source B is back in place and under vacuum It will be baked over the weekend It will be started early next.
Proton PMG May 7 th 2015 Cons Gattuso AD Shutdown Manager.
ELENA installation progress F. Butin / ELENA collaboration.
Presentation transcript:

All Experimenters Meeting PIP Report Fernanda G. Garcia on behalf of PIP team 10/06/2014

PIP Report F.G. Garcia AEM - PIP Report 10/06/2014 Ongoing Complete 3 L2 tasks 9 L3 tasks 31 L4 tasks 30% Linac 70% Booster

Linac

 Modulator Upgrade  35kV, Marx-topology modulator  Progress made on various fronts  Enclosure design complete and near delivery  Gate driver circuit board design/layout done  Short circuit testing continues  Successful design and tests, with available end-of-year funds procure the long-lead items for the full voltage modulator PIP - Linac 200 MHz RF Power System F.G. Garcia AEM - PIP Report 10/06/2014  HLRF – SBK201  Successful CDR review early July  Focus now shifted to drafting & purchase of long-lead items

PIP - Linac Accelerator Physics  Laser Notch  Internal review carried out early August  Readiness for vacuum cavity / optical cavity installation during shutdown F.G. Garcia AEM - PIP Report 10/06/2014 Laser port Assembly at lab area Assembly installed RIL beam

PIP - Linac Utilities  Power distribution (Dec’11-Sept’14)  L1 transformer fully installed  13.8kV to 480Y/277V  Better heat loss (80C vs 115C)  Low voltage breakers, trip control and instr.  What will become of the removed equipment?  Transformer will be kept as spare for Linac  additional 2 other old-style transformers in use  Breakers & primary switch will be rebuilt and tested – spares L4 task complete! F.G. Garcia AEM - PIP Report 10/06/2014 July’14 Sept 17 ‘14 Sept 24 ‘14 Original L1 sub-station

PIP - Linac Utilities  LCW system  Dual temp. system  Replace cooling provided by EOL DTW piping and fan coil units to a rooftop AC unit  Contract awarded and pre-meeting conducted  Gallery work starts Oct10 th  CUB 55 LCW backup pump  Extensive delay  Overran in costs forced the project to be restructure to a FP rather T&M  Process complete in time for the shutdown  Job still has not started!  Vacuum upgrade  Turbo pumps (shutdown’14)  Original pumps in service since day-one  Belt driven / oil reservoir  Heavy, big, replacement parts no longer available  New pumps are sealed clean bearings, compact, high speed, freq. drive control L4 task complete! F.G. Garcia AEM - PIP Report 10/06/2014

Booster

PIP - Booster RF Anode & Bias Supplies  Anode Supplies  Goal: install both supplies during shutdown 2014  Delays in the delivery of long lead items prevented this task to be complete  AD/EE continue to make progress with assembly  Supplies may be built but not tested by the end of the shutdown  Await for opportunistic shutdown next year to install F.G. Garcia AEM - PIP Report 10/06/2014  Bias Supplies  Scope of work: Replace transformers, re-plumbing and re-wiring for 15 Hz operation Current Situation East gallery: 100% complete West gallery: 10% complete

PIP - Booster RF Cavity & Tuner Refurbishment  Work progressing well with the cavity refurbishment  Scope of work: refurbish all 19 cavities in Booster  Up to now, 11 cavities fully refurbished and re-installed in tunnel  Additional cavity (#20) installed prior the shutdown  Cavity built from leftover parts F.G. Garcia AEM - PIP Report 10/06/2014 Current Situation  Cones are bottleneck  Time consuming to rework a used cone 10 step process

PIP - Booster Notch system  Scope of Work: Reconfigure and replace notch kickers & corresponding high voltage system for faster rise/fall time F.G. Garcia AEM - PIP Report 10/06/2014 Short kickers beam 3 bucket notch Current Situation  Complete installation of  6 “short” kicker magnets & corresponding high voltage system  redesigned S12 spool piece  improve aperture at downstream of notch kickers (~10%)  standard Booster BPM’s pickup plates proved to be aperture restriction

PIP - Booster Radiation Shielding  Scope of Work: Revised Booster shielding assessment to allow high intensity operations.  Present SAD allows for 1.8E17 p/hr  Above ground radiation protection  Practical limit determined by the array of detectors spread around the ring  50+ interlocked detectors placed above ground at specific locations covering all loss points  Tunnel radiation protection  Overall loss rate limited by the “watt meter” – 525W &  Local control loss possible with array of 60+ BLMs along the tunnel  During the shutdown, 8 TLM’s installed in Booster tunnel  High loss points: Injection, extraction, collimator, notch regions  Beam tests to characterize system F.G. Garcia AEM - PIP Report 10/06/2014

PIP - Booster Utilities  Power distribution  Transformers  First transformer replaced 09/27 (west side)  Problems with the breaker will prevent the installation on the east side this shutdown F.G. Garcia AEM - PIP Report 10/06/2014  Vacuum upgrades  Turbo pumps  All pumps on-hand  Auxiliary cables and relay rack work moving along  Pump installation progressing well  Unlikely to complete this shutdown BWG - transformer

PIP PIP-II adjustments F.G. Garcia AEM - PIP Report 10/06/2014 Meetings and discussions began to adjust PIP to PIP-II

PIP - Conclusions  PIP continues to make positive progress towards its goals  Linac  Lots of progress made on the 200 MHz RF system  First step completion of R&D project to create a notch within linac beam pulse using laser system  Completion of two L4 tasks during shutdown 2014  Vacuum system  Power Distribution  Booster  >50% cavities refurbishment complete  Complete installation of BW house transformer  Setup complete for TLM’s beam tests run  Complete installation of short kicker magnets for notch creation  PIP plan adjustments for PIP-II  Discussions started between PIP and PIP-II to redirect and modify existing PIP activities to line up with PIP-II program F.G. Garcia AEM - PIP Report 10/06/2014