Doc.: IEEE 802.11-07/2263r1 Submission July 2007 Peter Ecclesine, Cisco SystemsSlide 1 TGy July Closing Report Date: 2007-07-18 Authors:

Slides:



Advertisements
Similar presentations
Doc.: IEEE /0460r1 Submission March 2015 Slide 1 IEEE ah Closing Report for March 2015 Date: Authors: Yongho Seok (NEWRACOM)
Advertisements

Doc.: IEEE /0677r0 Submission May 2015 Slide 1 IEEE ah Closing Report for May 2015 Date: Authors: Yongho Seok (NEWRACOM)
Doc.: IEEE /0696r0 Submission May 2014 Slide 1 IEEE ah Closing Report for May 2014 Date: Authors: Yongho Seok (LG Electronics)
Doc.: Submission1 IEEE Motions in July Plenary DCN: Title: Request for Sponsor Ballot Approval for IEEE a.
Doc.: IEEE /0547r0 Submission May 2009 Menzo Wentink, QualcommSlide 1 IEEE TGz Montreal Agenda Date: May 10, 2009 Authors:
Doc.: IEEE /0144r01 Submission February 2015 Apurva N. Mody, BAE SystemsSlide 1 IEEE Motion at the February EC Telecon IEEE P Wireless.
Oct 2007 Richard Paine, BoeingSlide 1 doc.: IEEE /2662r0 Submission 11k San Jose Ad Hoc Agendas Date:
Doc.: IEEE /1187r0 Submission September 2015 Slide 1 IEEE ah Closing Report for September 2015 Date: Authors: Yongho Seok and.
September 2008 doc.: IEEE /1003r0 July 2011
Task Group G Report January 17, 2003
TGs Process, July Date: Author: July 2009 July 2009
TGaf San Francisco Closing Report
TGy January Chair’s Report
July 2016 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG4s Closing Report for July 2016] Date Submitted:
TGy July Opening Report
doc.: IEEE <doc#>
January 2017 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG4s Closing Report for January 2017] Date.
IEEE TGai Closing Report
November 2017 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [] Date Submitted: [7 November 2017] Source:
TGaf Waikoloa Closing Report
doc.: IEEE <doc#>
TGs San Diego Closing Report
IEEE TGai Closing Report
September 2017 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG4s Closing Report for September 2017]
TGs Atlanta Closing Report
TGs Waikoloa Closing Report
TGy January Closing Report
doc.: IEEE <doc#>
IEEE Motions in July Plenary DCN:
TGaf Geneva Closing Report
March 2015 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: Closing Report for TG4q (ULP) Task Group,
TGs Process, July Date: Author: July 2009 July 2009
doc.: IEEE <doc#>
TGaf San Francisco Closing Report
TGy March Closing Report
TGs Process, September Date: Author: September 2008
September 2017 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG4s Closing Report for September 2017]
TGs Process, November Date: Authors: November 2007
Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [A Brief Overview of Draft Approval.
TGs Process, November Date: Author: November 2009
doc.: IEEE <doc#>
Report of TGm – July 2005 DATE: July 2005 Author(s) January 2005
TGs Process, November Date: Authors: November 2007
TGaf Waikoloa Closing Report
September 2017 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG4s Opening Information for September.
IEEE TGaf DRAFT Meeting Plan and Agenda
TGy Sept Opening Report
TGy Nov Opening Report Date: Authors: November 2007
TGs Process, July Date: Author: July 2009 July 2009
TGy July Opening Report
TGs Process, September Date: Author: September 2009
TGy Sept Opening Report
TGs Process, September Date: Authors: September 2007
TGy Nov Opening Report Date: Authors: November 2007
TGy July Opening Report
TGs Process, March Date: Author: March 2009 March 2009
TGaf Orlando Closing Report
TGs Process, January Date: Authors: January 2007
Task Group G Report January 17, 2003
TGy July Opening Report
TGy Nov Opening Report Date: Authors: November 2007
March 2017 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG4s Closing Report for March 2017] Date.
IEEE TGv November 2010 Agenda
September 2008 doc.: IEEE /1003r0 July 2011
May 2008 Closing Plenary Motions
IEEE TGai Closing Report
January 2017 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG4s Closing Report for January 2017] Date.
TGs San Diego Closing Report
TGs Process, March Date: Authors: March 2008 March 2008
September 2008 doc.: IEEE /1003r0 Sep 2010
Presentation transcript:

doc.: IEEE /2263r1 Submission July 2007 Peter Ecclesine, Cisco SystemsSlide 1 TGy July Closing Report Date: Authors:

doc.: IEEE /2263r1 Submission July 2007 Peter Ecclesine, Cisco SystemsSlide 2 Abstract This submission summarizes the TGy activity for IEEE San Francisco (July 2007) meeting

doc.: IEEE /2263r1 Submission July 2007 Peter Ecclesine, Cisco SystemsSlide 3 Review LB106 comments and Submissions 11-07/2019r5 has all comments –Review ‘Master LB106 Original Comments’ and ‘Master LB ’ sheets y-phy misc comments resolution.doc y-coexistence-assurance.doc y-LB106-Submission-for-DSE-comments.doc y-LB106-Non-Editorial-comments- submission.doc y-LB106-Editorial-comments-submission.doc y-discussion-on-cca-ed.doc y-tgy-conditional-sponsor-ballot-report.pdf

doc.: IEEE /2263r1 Submission July 2007 Peter Ecclesine, Cisco SystemsSlide 4 Motions (4) Motion: Move to accept draft normative text changes in submissions 07/2058r2, 07/2072r2, 07/2073r2, 07/2080r2, and merge their comment resolutions into r4, and instruct the technical editor to prepare P802.11y draft 3.1. Moved:Victoria Poncini Second:Jim Raab Vote: Motion: Passes

doc.: IEEE /2263r1 Submission July 2007 Peter Ecclesine, Cisco SystemsSlide 5 Motions (5) Motion: Move to change the resolutions of comments #288, #289, #436 from Declined to Counter, and #1034, #1101 to Accept in Principle Moved: Victoria P. Second: Rich K. Vote: Unanimous consent Motion: Passes

doc.: IEEE /2263r1 Submission July 2007 Peter Ecclesine, Cisco SystemsSlide 6 Motions (6) Motion: Move to accept draft normative text changes in submission 07/2197r0, and merge the comment resolutions into r5, and instruct the technical editor to prepare P802.11y draft 3.2. Moved: Victoria P. Second: Rich K. Vote: Unanimous consent Motion: Passes

doc.: IEEE /2263r1 Submission July 2007 Peter Ecclesine, Cisco SystemsSlide 7 Motions (7) Motion: Instruct the technical editor to rename y draft 3.2 as P802.11y draft 4.0. Having addressed all comments arising from the WG Letter Ballot 106, Task Group y resolves to forward P802.11y draft 4.0 to the working group for the purpose of conducting a 15-day recirculation letter ballot. The purpose of the working group letter ballot is to forward the draft to sponsor ballot. –The text of the motion to be presented to the working group will be “Move to authorize a 15-day Working Group Recirculation Letter Ballot of P802.11y draft 4.0, asking the question “Should the P802.11y draft 4.0 be forwarded to sponsor ballot?”” Moved:Victoria P. Second:Rich K. Vote:3-0-0 Motion: Passes

doc.: IEEE /2263r1 Submission July 2007 Peter Ecclesine, Cisco SystemsSlide 8 Motions (8) Motion: Move to accept 07/2066r1 as the Coexistence Assurance letter from y to satisfy the requirements of the TGy 5 Criteria Moved: Rich K. Second: Victoria P. Vote: Unanimous consent Motion: Passes

doc.: IEEE /2263r1 Submission July 2007 Peter Ecclesine, Cisco SystemsSlide 9 Motions (9) Motion: To approve document 07/2208r2as the report to the 802 Executive Committee (EC) on the requirements for conditional approval to forward y to sponsor ballot, requesting the chair of to forward this report to the EC on behalf of the working group. Moved: Rich K. Second: Victoria P. Vote: Unanimous consent Motion: Passes

doc.: IEEE /2263r1 Submission July 2007 Peter Ecclesine, Cisco SystemsSlide 10 Motions (10) To request conditional approval to send y to sponsor ballot upon conclusion of a working group recirculation ballot that meets all requirements in the LMSC Policies and Procedures. Moved: Victoria P. Second: Rich K. Vote: Unanimous consent Motion: Passes

doc.: IEEE /2263r1 Submission July 2007 Peter Ecclesine, Cisco SystemsSlide 11 Motion (11) To authorize the working group chair to send y to sponsor ballot, upon successful completion of a working group recirculation ballot that meets all requirements for conditional approval as set forth in the LMSC Policies and Procedures. Moved: Victoria P. Second: Rich K. Vote: Unanimous consent Motion: Passes

doc.: IEEE /2263r1 Submission July 2007 Peter Ecclesine, Cisco SystemsSlide 12 Motion (12) To authorize an ad hoc comment resolution meeting on October 23, 2007 in San Jose CA starting at 09:00 PDT Moved: Rich K. Second: Victoria P. Vote: Unanimous consent Motion: Passes

doc.: IEEE /2263r1 Submission July 2007 Peter Ecclesine, Cisco SystemsSlide 13 Schedule Projected at San Francisco (July) May 2007 (Montreal, Quebec) –Second Letter Ballot Re-circulation, Sponsor Ballot pool formed July 2007 (San Francisco, California) –Comment Resolution, Sponsor Ballot conditionally authorized September 2007 (Waikoloa, Hawaii) –Comment Resolution, 1st SB Issued November 2007 (Atlanta, Georgia) –Sponsor Ballot Comment Resolution, 1 st SB Re-circ January 2008 –Sponsor Ballot Comment Resolution March 2008 –WG, ExCom Approval, RevCom Approval

doc.: IEEE /2263r1 Submission July 2007 Peter Ecclesine, Cisco SystemsSlide 14 Attendance Tuesday AM1: 12 Thursday PM2: 11