28 th January 2016 LHC Performance Workshop Session 8: (E)YETS and Long Shutdown 2 Strategy and Preparation. HL-LHC.

Slides:



Advertisements
Similar presentations
Cryogenic system in P4: Possible options S. Claudet & U. Wagner LHC Workshop, “Chamonix XlV” January 2005 (Mostly for RF & beam scrubbing)
Advertisements

Improved anchoring of SSS with vacuum barrier to avoid displacement Ofelia Capatina (speaker), Katy Foraz (coordinates all the activities), Antonio Foreste,
H. MAINAUD DURAND, A. HERTY, A. MARIN, M. ACAR PERMANENT MONITORING OF THE LHC LOW BETA TRIPLETS: LATEST RESULTS AND PERSPECTIVES.
Status of the LHC Project L.Evans - C.Wyss Riunione CSN1 INFN Napoli, 21 Settembre 2005.
WP 13 : Beam Diagnostics Conceptual Specifications Rhodri Jones (BE/BI)
Laurent Tavian Thanks to contribution and helpful discussions with M. Jimenez, V. Parma, F. Bertinelli, J.Ph. Tock, R. van weelderen, S. Claudet, A. Perin,
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
Construction and Installation of the CLIC Experimental Area
LHC HARDWARE COMMISSIONING SAFETY TRAINING DAY S. Claudet (AT-ACR-OP) With great help from G. Lindell (Safety commission) CRYOGENICS.
CV activities on LHC complex during the long shutdown Serge Deleval Thanks to M. Nonis, Y. Body, G. Peon, S. Moccia, M. Obrecht Chamonix 2011.
CLIC CES Webex 12 Nov Summary: – Set of fire safety measures defined in CERN Safety Report – Proposed Structure for CLIC/ILC Fire Safety Report Fabio.
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
Workshop Chamonix XIV Shortcuts during installation and commissioning: risk and benefit H. Gruehagen, G. Riddone on behalf of the AT/ACR group 18 January.
1 Second LHC Splice Review Copper Stabilizer Continuity Measurement possible QC tool for consolidated splices H. Thiesen 28 November 2011 K. Brodzinski,
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Cryogenics in SPS & LHC (2 K / 4.5 K) LHC-CC11, 14 November 2011 L. Tavian, CERN, TE-CRG With the contribution of N. Delruelle, G. Ferlin & B. Vullierme.
Consolidation and Upgrade of the SPS Electrical Networks Current Status JP. Sferruzza, on behalf of EN/EL.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
1st LTEX 22 June 2009D.LACARRERE1 Protection of UX85 EDMS No IP8 Current Status & Plans  UX85 Expt Area  RB84 (8-7 sector)  RB86 (8-1 sector)
LEP3: integration issues at the LHC tunnel M. Koratzinos 2 nd LEP3 day, 23 October 2012.
R2E Mitigation Project P5 Relocation Options - Discussion R2E Mitigation Project CMS Relocation Options Towards An R2E Baseline 1 M. Brugger for the R2E.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
BDS: 1 October 13, 2007 BDS KOM EDR planning discussion Andrei Seryi October 13, 2007.
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
12th HL-LHC Parameter and Layout Committee meeting.
Hardware Commissioning  Preparation Documentation MTF Programme  Status The Review The commissioning activity in Resources  Outlook The new.
LHC-CC Validity Requirements & Tests LHC Crab Cavity Mini Workshop at CERN; 21. August Remarks on using the LHC as a test bed for R&D equipment.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Cryogenics for crab cavities – SPS/LHC 2 nd HiLumi LHC meeting – Frascati (Italy) 15 November 2012 K. Brodzinski and L. Tavian on behalf of cryogenic team.
Extraction and beamline progress B.Goddard TE/ABT.
SM18 cryogenics infrastructure upgrade L. Serio TE-CRG.
The integration of 420 m detectors into the LHC
Conclusions on UPS powering test and procedure I. Romera Acknowledgements: V. Chareyre, M. Zerlauth 86 th MPP meeting –
TE-CRG Activities D. Delikaris, TE-CRG.
D.Macina TS/LEATOTEM Meeting25/02/2004 Roman Pot test at the SPS Test of the Roman Pot prototype in the SPS proposed in December 2003 (CERN/LHCC ):
LMC 1 (Pre Chamonix) DN200 relief valve position DN200 relief valve position On top wherever possible. Open W bellows for MLI protection. On top wherever.
COOLING & VENTILATION PLANTS M. Nonis – CERN EN Department / CV Group Annual Meeting of the FCC study – Rome 14 th April 2016.
LHC Cryogenics, equipment & interventions around P3/P7 S. Claudet, “volunteer” for TE_CRG 16 Oct’14.
Bruno Vullierme Sept LHC-CC09 - 3rd LHC Crab Cavity Workshop Slide 1 CRAB CAVITY INTEGRATION CRYOGENICS INSTALLATION.
Fire and Oxygen Deficiency Detection Systems Risk Analysis S. Grau GS-ASE-Alarm Systems R2E Workshop, Tuesday Session 2: Equipment inventory,
Rad. Shield 2 Feb. 06D.LACARRERE1 IP8 POINT 8 – RADIATION SHIELD – UX85 Introduction  History (in brief)  Conceptual Design  Why installation shifted.
ELENA installation progress F. Butin / ELENA collaboration.
L. Tavian, TE/CRG, LSC Page 2 February 21 th, 2014 LS1 Committee (LSC) L. Tavian TE-CRG.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
LHC experience with installation Katy Foraz March 6th 2008, Dubna GDE Meeting - ILC Conventional Facilities and Siting Workshop ***********************************
TE-CRG Activities A. Perin, on behalf on the Cryogenics Group.
Cryogenics storage and distribution
Framework Schedule from EYETS 2016 to LS2
SPS Crab Cavity Test Stand: Safety review summary
HL-LHC IT STRING and Series test of SC link
IT-4189 Supply and installation of a cryogenic distribution system
Equipment simplified model SMR UR safety
Internal review of IR2 LEP cryostats (WP11/WP5) Close out session
The HL-LHC Circuits: Global View and Open Questions
on behalf of the RF group
SPS cryogenic proximity equipment and SM18 validation
The LHC - Status Is COLD Is almost fully commissioned
BE-ICS activities for LIU Project
CRYOGENICS – strategy, unavailability root causes and limitations
M. Alcaide Leon, Paolo Fessia
M. Alcaide Leon, Paolo Fessia
Keeping LHC cold during LS periods Preliminary proposal
Hollow e- lens, Cryogenic aspects
Accelerator and Experiment Interface Session: LS2, LS3
SPS EN-CV Planning LS (initial draft)
Cryogenic Risk Assessment in LHC
Overview & baseline of LS2 and roadmap for CRG
Status with crucial LSS5 kicker transmission line cables
ESS RF Development at Uppsala University
Impedance working group update
Presentation transcript:

28 th January LHC Performance Workshop Session 8: (E)YETS and Long Shutdown 2 Strategy and Preparation. HL-LHC activities during LS2, highlight of changes with respect to last year 2 Laurent Tavian (ATS-DO) Many thanks to HL-LHC WP leaders and engineers for their contributions

28 th January LHC Performance Workshop Session 8: (E)YETS and Long Shutdown 2 Strategy and Preparation. Outline Highlight of changes with respect to Chamonix’14 workshop, in particular: 11 T dipoles, cryo-bypasses and TCLD collimators configuration Cold/warm powering Cryogenics at P4 In-situ coating of IT beam screen at P2 and P8 Civil engineering work Safety of personnel working in the HL-LHC underground areas during LHC Run 3  Different scenarios under study with their impacts on LS2 activities Conclusions 3

28 th January LHC Performance Workshop Session 8: (E)YETS and Long Shutdown 2 Strategy and Preparation. HL-LHC project structure 4 With potential installation activities during YETS, EYETS and LS2 WP4: Mainly SPS/BA6 activities (see Julie and Giovanna presentation) Avoid large upgrade and consolidation activities in test or assembly facilities in parallel with (E)YETS and LS

28 th January LHC Performance Workshop Session 8: (E)YETS and Long Shutdown 2 Strategy and Preparation. 11 T dipoles, cryo-bypass & TCLD Chamonix 2014 : LS2 activity proposals Chamonix 2016: LS2 activity proposals 2-unit installation in L2 & R2 (DS)Alternative under study. Could be replaced by the installation in LS2 of 2 long-cryo-bypass & TCLD assemblies at the location of the connection cryostats (HL-LHC ECR (if alternative validated) and LHC ECR to be done) 2-unit installation in L7 & R7 (DS)Maintained (LHC ECR to be done) 5 WP3456A.B = 1 unit First unit to be ready before the beginning of LS2 (end 2018) Second unit not later than end 2019 Long cryo-bypass design/manufacture on the critical path for LS2 installation Remainder of ECR rules: - Changes affecting the configuration Baseline of HL-LHC  HL-LHC ECR will be used to trace decisions and actions that will come from changes on components. (discussed at the HL-LHC-TCC) - Installation of new components affecting the present LHC configuration  LHC ECR will be used to trace the LHC configuration change. (discussed at the LMC)

28 th January LHC Performance Workshop Session 8: (E)YETS and Long Shutdown 2 Strategy and Preparation. Collimation (DS excepted) Chamonix 2014 : LS2 activity proposals Chamonix 2016: LS2 activity proposals Secondary collimator (TCSPM) at P7 (1 unit prototype in EYETS, 7-9 units in LS2) (LHC-ECR to be done) Installation of an optional e-lens installation at P4 is still under consideration (HL-LHC-ECR and LHC ECR to be done) Small activities (IR7, crystals…) 6 WP3456A.B

28 th January LHC Performance Workshop Session 8: (E)YETS and Long Shutdown 2 Strategy and Preparation. Cold and warm powering Chamonix 2014 : LS2 activity proposals Chamonix 2016: LS2 activity proposals Installation of horizontal HTS links and current feedboxes in LSS7 and TZ76 Suppressed (HL-LHC ECR to be done) Installation of power converters in TZ76 Suppressed but to be replaced by the Radtol upgrade of existing power converters (HL-LHC ECR to be done) 7 WP3456A.B

28 th January LHC Performance Workshop Session 8: (E)YETS and Long Shutdown 2 Strategy and Preparation. New Q5 quadrupoles at Point 6 Chamonix 2014 : LS2 activity proposals Chamonix 2016: LS2 activity proposals Replacement of Q5 quadrupoles in LSS6 by installation of longer Q5 quadrupoles Maintained (LHC ECR to be done) 8 WP3456A.B HL-LHC proposal (Increase of longi- tudinal dimension by 3650 mm) Alternative under study to keep the existing Q5 quadrupoles and operate it at 1.9 K:  Additional impact on cryo (WP9) which has to supply and install 2 new QRL service modules  If validated probably to be postponed in LS3

28 th January LHC Performance Workshop Session 8: (E)YETS and Long Shutdown 2 Strategy and Preparation. Upgrade of cryogenics at P4 Chamonix 2014 : LS2 activity proposals Chamonix 2016: LS2 activity proposals Installation of a new 3-4 kW cryoplant cold box in UX45 Alternative under study. Could be replaced by the upgrade of the S45 Sector cryoplant and the installation of a small mobile cryoplant to be shared with SPS (HL-LHC ECR (if alternative validated) and LHC ECR to be done) Installation of a new helium compressor station in SUH4 New Cryo-distribution (Cryolines and valve box) for RF cavities Maintained but to be updated if cryoplant alternative validated (HL- LHC ECR (if alternative validated) and LHC ECR to be done) 9 WP3456A.B

28 th January LHC Performance Workshop Session 8: (E)YETS and Long Shutdown 2 Strategy and Preparation. In-situ amorphous-carbon coating of beam screens Chamonix 2014 : LS2 activity proposals Chamonix 2016: LS2 activity proposals Coating of IT2 and IT8 beam screens Coating of D2 beam screens in LSS2 and LSS8 under study. (HL-LHC ECR (if validated) and LHC ECR to be done) 10 WP3456A.B

28 th January LHC Performance Workshop Session 8: (E)YETS and Long Shutdown 2 Strategy and Preparation. Beam diagnostic Chamonix 2014 : LS2 activity proposals Chamonix 2016: LS2 activity proposals Installation of a prototype of fast wire scanners (BWSF) at P4 Maintained. (LHC ECR to be done) Installation of beam gas vertex detector (BGV) 1 st proto in YETS, 2 nd proto in LS2 Maintained, 1 st proto already installed and being tested. (LHC ECR to be done for the 2 nd proto) Installation of a wideband BPM Prototyping for LHC at P4 (LHC ECR to be done) Installation of halo Diagnostics (LHC ECR to be done) 11 WP3456A.B

28 th January LHC Performance Workshop Session 8: (E)YETS and Long Shutdown 2 Strategy and Preparation. Beam transfer and kickers Chamonix 2014 : LS2 activity proposalsChamonix 2016: LS2 activity proposals Installation of injection absorber (TDIS) in L2 and R8 Maintained. (LHC-ECR to be done) Installation of a MKI prototype in R8 during YETS Maintained. (LHC-ECR to be done) Installation of absorber/mask in front of D1 in L2 and R8 instead of TCDD aperture change (HL- LHC ECR (if alternative validated) and LHC-ECR to be done) Beam Dumping System: Replacement of extraction kicker generators switch and upgrade of control system of MKD generators (LHC-ECR to be done) 12 WP3456A.B TDIS D1 mask

28 th January LHC Performance Workshop Session 8: (E)YETS and Long Shutdown 2 Strategy and Preparation. Collider-Experiment interface Chamonix 2014 : LS2 activity proposals Chamonix 2016: LS2 activity proposals Installation of a neutral absorber in front of D2 in L8 Maintained. (LHC-ECR to be done) Installation of 2 TAXN for LHCb in P8Maintained. (LHC-ECR to be done) 13 WP3456A.B TAXN Neutral adsorber

28 th January LHC Performance Workshop Session 8: (E)YETS and Long Shutdown 2 Strategy and Preparation. Civil engineering Chamonix 2014 : LS2 activity proposalsChamonix 2016: LS2 activity proposals Identified as Run 3 activityExcavation of underground structure at P1 and P5: 2018 (shaft), (Cavern and galleries) Construction start of surface building at P1 and P5 in WP3456A.B Shaft Cavern UR gallery UL gallery UA gallery UA gallery UL gallery

28 th January LHC Performance Workshop Session 8: (E)YETS and Long Shutdown 2 Strategy and Preparation. Civil-engineering present schedule 15 Connection to the LHC tunnel (including personnel evacuation bypasses) foreseen beginning of LS3 Time slot now available for services installation (lighting, ventilation, electrical distribution, doors…)… but what about personnel safety due to the non-availability of evacuation bypasses?

28 th January LHC Performance Workshop Session 8: (E)YETS and Long Shutdown 2 Strategy and Preparation. Safety of personnel 16 No access need in UL, i.e. fence at the entrance. (special measures during HTS link and cryo-line installation) Evacuation bypass at the extremity of the UAs LHC tunnel Basic rule: no dead-ends i.e. having always escape paths at each end (the PM shaft on one side and UA extremities in the other side) Discussion in close collaboration with HSE Unit

28 th January LHC Performance Workshop Session 8: (E)YETS and Long Shutdown 2 Strategy and Preparation. Safety of personnel during Run 3: Option 1 Keep the initial schedule for service installation in underground areas: no use of the new available time slot underground access forbidden start of activities during LS3 after the completion of the CE work, i.e. important level of coactivity with associated risks (safety, delays…) 17

28 th January LHC Performance Workshop Session 8: (E)YETS and Long Shutdown 2 Strategy and Preparation. Safety of personnel during Run 3: Option 2 Installation of a safe room at the end of the UR. Operation and maintenance of the room during 2 years? Training of personnel (periodicity?) or dedicated operators? “GVA Police du feu” recommendation: if you use a safe room, be sure that you can rescue the group of persons in less than few hours. 18

28 th January LHC Performance Workshop Session 8: (E)YETS and Long Shutdown 2 Strategy and Preparation. Safety of personnel during Run 3: Option 3 Construction of the evacuation bypasses during LS2: Impact on schedule (extra time for excavation?) Impact on LHC activity: Rerouting of services which could be on the LHC tunnel wall Removal of fragile hardware in LHC tunnel? creation of a protection sas in the LHC tunnel to prevent dust migration during the LHC wall drilling phase. Impact on logistics/coactivity: no transport across the protection sas areas Impact on extra services required: interconnection of the LHC and HL-LHC will require the implementation of: Pressure-fire-resistant ventilation doors Active pressurization (DP= Pa) of a interface sas protecting the HL-LHC areas against tunnel air inlet. Beam interlock system (beam dump in case of door opening during Run 3) ODH and radiation monitoring? 19 WP3456A.B LHC tunnel UA Evacuation bypass Protection sas Fire & pressure resistant door Pressurized sas Interlocked door

28 th January LHC Performance Workshop Session 8: (E)YETS and Long Shutdown 2 Strategy and Preparation. Conclusions HL-LHC activities will be present during the LS2 and must be coordinated and included in the LS2 master schedule. Some alternatives to the HL-LHC baseline are still under study. Decisions and/or HL-LHC ECR must be done in the coming months to allow sufficient procurement/fabrication time. For all (E)YETS & LS2 HL-LHC activities impacting the LHC configuration, LHC ECRs must be issued. Civil engineering for underground areas is now integrated in the LS2 and will be on the critical path. Post-LS2 personnel safety in HL-LHC underground areas has to be addressed. Decision has to be taken in collaboration with HSE. Option 3 seems more attractive but the impacts on LHC, on additional works and on LS2 schedule must be studied more in detail. Remarks: If all the addressed HL-LHC LS2 activities are accepted, the warm-up of 7/8 LHC sectors will be required. 20 WP3456A.B S12S23S34S45S56S67S78S81 11 T or alt. 11 T or alt.Cryo Q511 T Q5 11 T