CDR Feb 2006Mar 2008Dec 2009 Mar Design Study Preparatory Phase TDR tendering construction data taking governance legal entity pre-production.
Advertisements

WP F/L Development of the Dom support and rope- and cable management for KM3-Net. KM3Net General meeting 2012 Catania - Edward Berbee - Nikhef Edward Berbee.
Rope & Cable management A vertical electro-optical backbone cable for KM3NeT Gertjan Mul On behalf of the km3net collaboration Nikhef.
Jan 2009 U. Katz: Astroparticle Physics 1 What is KM3NeT – the Vision  Future cubic-kilometre sized neutrino telescope in the Mediterranean Sea  Exceeds.
The Multi-PMT Optical Module P.Kooijman, University of Amsterdam University of Utrecht Nikhef.
Antares/KM3NeT M. de Jong. neutrinos  p Scientific motivation: – origin cosmic rays – birth & composition relativistic jets – mechanism of cosmic particle.
Paolo Musico on behalf of KM3NeT collaboration The Central Logic Board for the KM3NeT detector: design and production Abstract The KM3NeT deep sea neutrino.
John Coughlan CMS Week Mar FED Update FED Production Status Transition Card.
Amsterdam 29 March 2011 Fernando Urbano IFIC (CSIC – Universidad de Valencia) KM3NeT Optical Calibration Laser Beacon and Nanobeacon Status.
Maintenance of the ANTARES deep-sea neutrino telescope 1 Marco Circella --- INFN Bari on behalf of the ANTARES Collaboration.
Flavio Gatti,Frascati-PSI, Jan 31 th, 06 1 TC status. Flavio Gatti UNIVERSITY and INFN of Genoa, Italy.
M. Circella, Technical and Planning issues, KM3NeT SC meeting, 29 July In this talk Preparation of mass construction (including DOM and DU integration)
Presented by E.G. Anassontzis University of Athens on behalf of NESTOR COLLABORATION 5-8 October 2003 NIKHEF - Amsterdam Title Mechanics for “km 3 ” neutrino.
VLVnT11 - Erlangen 12-14/10/ Giorgio Cacopardo NEMO Phase2 mechanical design G. Cacopardo on behalf of NEMO collaboration.
Status of the PMT light detection system Gian Luca Raselli 20-AUG-2015 ICARUS executive meeting.
S.MonteilCOMMISSIONING1 PS/SPD ELECTRONICS OUTLINE 1)STATUS OF PS/SPD FE BOARDS PRODUCTION 2)PHASES OF PS/SPD COMMISSIONING 1)LEDs AND DETECTORS 2)TUBES.
Mechanical design of the Pre-Production Detector Unit Model of KM3NeT Mario MUSUMECI and Riccardo PAPALEO KM3NeT PP DU subgroup coordinators on behalf.
Steering committee Mechanics 29/07/ KM3NeT steering committee Edward Berbee - nikhef 2 DU-1 pictures at CPPM.
Three inch PMTs. Manufacturers ETEL 72 mm photocathode tube ready Passes all specifications (has higher than wished afterpulse rate: this is being fixed.
1 Motivations KM3Net VEOC Based on developments on solid cable at NEMO and Antares project and proto cable of Seacon. Optimizing properties like; flexibility.
STATUS AND PHYSICS GOALS OF KM3NET Paolo Piattelli P. Piattelli, ICHEP14 Valencia INFN – LNS, Catania (Italy)
J-W Schmelling Nikhef Amsterdam Electronics- Technology of January PPM-DU optics for KM3NeT Collaboration meeting Marseille PPM-DU: A three.
Antares status and plans  Reminder  Project status  Plans M. de Jong.
CLB meeting APC Tentative action/work list.
Progress on the Vertical Electro- Optical Cable P.Kooijman UU/UVA/Nikhef.
CLBv2 issues Diego Real 5 March A SVN repository created for KM3NeT svn+ssh://isvn.ific.uv.es/repos/KM3NeT.
Agenda Mededelingen PMT – Measurements of Hamamatsu PMTs, Erwin – New persons Dorothea – Test area, euipment, etc. VEOC/String – debriefing meeting at.
ΒΡΑΔΙΕΣ ΚΟΙΝΟΥ – ΑΣΤΡΟΝΟΜΙΑ ΓΙΑ ΟΛΟΥΣ Ε.Γ. Ανασοντζής – Ε.Κ.Π.Α. Τίτλος WP5, Paris, Feb.09.
WP F/L Dom production. KM3Net meeting 2012 Erlangen - Edward Berbee - Nikhef22/06/20121.
Report from the Erlangen Meeting Uli Katz ECAP, Univ. Erlangen ANTARES collaboration meeting - KM3NeT day Bologna, 5. October 2012.
KM3NeT WPF/L NIKHEF- MECABAR 1 A.Cosquer on behalf of the KM3NeT consortium MECABAR PROJECT PLAN 1- Context 2- 3D views and responsibilities 3-
Site for the PPM-DU String Layout Possible Site / Properties Power / Communication Contribution / Planning R.Papaleo, P.Lamare, E.Heine Bologna.
Antares/KM3NeT M. de Jong. Antares  2000NL joined collaboration (3.3 M€)  2006 ‒ 2008construction  2006 ‒ todaydata taking 24h/day  2012MoU signed.
Deployment Test Program P.Kooijman. Goal of tests Validation of the LOM deployment – Has had three previous tests – First included rudimentary cable –
VEOC for the String DU Objectives Design Properties Trends Break out Box Penetrator Production Cost review Status Vertical Electric Optical Cable /eh.
Agenda Mededelingen – equipment for rope stretch test arrived – ropes SK78 40 m for tests arrived – rope DM20 offer asked (6 x 1 km) (1 euro / m, deliverty.
Mechanical design of the Pre-Production Detector Unit Model of KM3NeT Mario MUSUMECI and Riccardo PAPALEO KM3NeT PP DU subgroup coordinators.
S.BEURTHEY CPPM/IN2P3 anémone ανεμώνη anemone Preliminary Development plan A ntares NEMO NE stor CATANIA 12 of March 2008.
Status report Els de Wolf Annual Meeting 2011, Nikhef.
WP F/L Detection Unit Mechanical Structure and Deployment R. Papaleo 130/03/2011.
Summary of Calibration and Instrumentation Session Robert Lahmann KM3NeT Collaboration Meeting, CPPM, 31-Jan-2013.
DOM developments Mini DOM PPM-DOM in Antares PPM future WP F-L.
CEA Saclay – Institute of research into the fundamental laws of the Universe PPM DU Pre Production Model Detection Unit Status and plans Th. Stolarczyk.
Organizing future KM3NeT production 06-July-2010.
Status of the NEMO tower validation Integration Tests Improvements Deployment program M.Anghinolfi- km3-day meeting )
Dom mechanics.. Earlier design; Reflector-ring mounted to the Pmt before the assembly of the complete Pmt foam-support. The support was made of milled.
Electronic department 5/7 July 2010, KM3NeT meeting at Nikhef - Mar van der Hoek et.al. Status and experiences with oil-filled Pressure Balanced backbone.
Multi-PMT DOM P.Kooijman University of Amsterdam-GRAPPA Presentation for SSC.
Status procurement of PMTs Oleg Kalekin KM3NeT WPF/L General Meeting Amsterdam
Pre-Production Models for KM3NeT
PPM 30/10/2012. In-situ validation programme Oct/Nov 2012: VEOC prototype in Atlantic (monitor fibres, pressure) Dec(?) 2012: multi-PMT.
DOM & DU tendering and assembly
Deep-sea neutrino telescopes
On behalf of Patrick Lamare
Write-up and Definitions for Cost Model
Characterization of the ETEL and HZC 3+ inch PMTs
KM3Net General meeting 2012 Catania - Edward Berbee - Nikhef
PMT test setup in Erlangen
P.Kooijman, UVA-GRAPPA, UU, Nikhef
Concluding remarks E. Migneco
DOM integration meeting
Els de Wolf, Nikhef/UvA KM3NeT WP345-meeting 23 February 2009
Els de Wolf 20 February 2012, Catania
SciFi option for neutrino target tracker
DOM Integration Meeting D. Vivolo - DOM Integration Meeting
Mini-drawers, FE-ASIC , Integrator
Junction Boxes for KM3NeT
PPM-DOM. SPM DOM LCM SS-part ILxx
Sea Operations for “km3” neutrino telescope
Nanobeacon: A low cost calibration instrument for KM3NeT
Presentation transcript:

The PPM project

The PPM PPM-DOM in Antares (already presented) Tests of the Vertical Electro-Optical cable Deployment of a small scale production model

The VEOC First tests to test oil properties and fibre properties under pressure 430 m half section of VEOC built at Nikhef – Learned a lot – Some things a lot easier than expected – Some harder To be deployed end of October in Atlantic at m (on ship already) – Test of oil property (compression versus depth) – Transmission of fibres at 400+ bar In same cruise deploy m ropes for long term test of Dyneema in sea (2 for 3 months 2 for 1 year)

Making a VEOC

Making a VEOC II

Deployment of Full Length DU with VEOC In March deployment of DUs with VEOC near Malaga 14 days of deployment with 2 LOMS As many as possible deployments and LOM- reloading When successful – Deployment of PPM-DU – Where?

Cable deployment tests All items must be on Texel on Feb 20 Items – 40 spheres + buoys – 2 LOMs – 4 VEOCS – Many compass-tilt-meters – 3 DOMs + VEOC for PPM Pelagia used for deployment near Malaga Simple ROV with camera probably available

Parts DOM for PPM-DU – All parts in hand or to be delivered soon – CLB ready in November (Spain) – Cores Production by rapid prototyping for Hamamatsu tubes in Erlangen – Cooling structures available – Spheres available – Instrumentation available – Power boards available soon (Greece) – Shore station electronics (need volunteer) – PMTs 62 ETEL and many Hamamatsu (>31)

CLB: CURRENT STATUS A completely operational CLB already exists!! Developed by Saclay Based on Virtex 5 Xilinx FPGA KM3NeT day – Bolonia 5 October 2012 – Diego Real9

Batch of 4 CLBs already in production: o Expected data: mid-october o Test to be carry out in Saclay where the IFIC team will be formed by the Saclay experts. Many thanks Saclay! o To be used in the PPM-DU Batch of 8 CLBs to be produced after validation of the first batch: o Test to be carry out in Valencia (Already started the process to install a test bench in Valencia – Saclay will produce a crate for the test bench) o To be used in the different test setups CLB: CURRENT STATUS KM3NeT day - Bolonia 5 October 2012 – Diego Real10

O. Kalekin: KM3NeT DOM at ECAP 11 DOM components Integration tools and mechanical components under designing and production PMT and lens dummies for training Gel Wacker 612 A/B

O. Kalekin: KM3NeT DOM at ECAP 12 Core manufacturing Plastic/foam core: 3D Printing against moulding 1/4 of core will be made at Technical Faculty with 3D jet printer BitsFromBytes: 3DTouch 3D Printer Build area 275x275x201 2,590 Euro Plastic PLA (polylactic acid) 59 Euro/kg TheFutureIs3D: Glacier Steel 3D Printer Build area 406x406x406 $2,700

O. Kalekin: KM3NeT DOM at ECAP 13 PMTs Hamamatsu 80mm diameter R PMT 6+25 PMTs have been tested at ECAP and Nikhef TTS(sigma) < 2ns (all) Dark rate < 1kHz (5 of 6) QE at 470nm > 20% (5 of 6) Next bunch of 50 PMT is expected to be Nikhef this/next week