VELIGALLU PROJECT 1 PROJECT PROFILE: Formation of earth dam, construction of spillway & fabrication and erection of 5 Nos. Radial gates for Veligallu Project.

Slides:



Advertisements
Similar presentations
Jawaharlal Nehru National Urban Renewal Mission JNNURM PROGRESS REVIEW APRIL 2007 Reforms-Projects-Funds Mobilisation & Grant Utilisation State___________.
Advertisements

Bundelkhand Special Package Animal husbandry Department Madhya Pradesh 1.
1 PROJECT PROFILE : Lining of TGP Canal from KM to KM (Up to Kurnool – Kadapa Border) etc. 2No. of Packages:6 (2 EPC + 4 Old Packages) 3Agreement.
OBJECTIVES OF PMS  PMS is a web based application for monitoring progress of all projects undertaken by CPWD  Monitoring of projects both at pre and.
Sl. N. Name of ProjectAgencyEstimated Cost Latest Estimated Cost by Planning Commission Fund Release by GoI ExpenditurePhysical Status ENERGY.
MUSURUMILLI PROJECT 15 km 35.4 km Project cost : cr
SPILLWAY ( 77 mt) 31.5 Km SEEPAPALLY VAGU RESERVOIR Right Earth Dam226 Mt Left Earth Dam 522 Mt Non EPC Package Works under progress EPC Package Works.
Pranahita – Chevella Project PHASE - II
(A) Completion of on going works of dam, canals,etc. including restoration of works of dam. PROJECT WISE DETAIL Total Provision Rs Crore Measure/Project/SectorDistt.
Jawaharlal Nehru National Urban Renewal Mission JNNURM PROGRESS REVIEW JUNE 2007 Reforms-Projects-Funds Mobilisation & Grant Utilisation State:- Goa City:-
No.Name of PackageEstimate CostStatus IProjects approved. a.Remodeling of water supply distribution network Rs croresWorks under.
SRIPADASAGAR PROJECT (YELLAMPALLY PROJECT)
(POLAVARAM) (Head Works)
TADIPUDI LIFT IRRIGATION SCHEME
PRESENTATION BY Manaranjan Mali, Addl.P.D Technical, DRDA, Nabarangpur.
ALISAGAR LIFT IRRIGATION SCHEME – 2 years period
PEDDAGEDDA PROJECT Project cost : Crores Ayacut : Acres
PUSHKARA LIFT IRRIGATION SCHEME (2 years period)
HANDRI NIVA SUJALA SRAVANTHI (IRRIGATION SCHEME) (1.98 LAKH ACRES)
GNSS PROJECT (PHASE-I)
Mid Day Meal Scheme AWP&B Arunachal Pradesh.
LEFT LINK CHANNEL 540M RIGHT LINK CHANNEL 210 M LEFT HEAD SLUICE RIGHT HEAD SLUICE PROPOSED RIGHT MAIN CANAL 1,20,000 ACRES Km Km LEFT.
VELIGONDA PROJECT 1. Teegalem Canal (48.15 km) 62,000 Ac
PULICHINTALA PROJECT NSP Reservoir Barrage Halia Musi Paleru Munneru
30Nos. Distributaries under the 3 canals are in progress and are to be completed by 3/2006. Lining works for all 3 Main Canals proposed in package 94,
(Water Availability : 57.50TMC, Ayacut proposed: 2,55,510Acs)
PHASE – I & PHASE - II.
Under execution YELLUR BALANCING RESERVOIR EXISTING SINGOTAM RESERVOIR
PACKAGE 22PACKAGE 23 Total Ayacut under this scheme: 50,250 Ac. KOILSAGAR LIFT IRRIGATION SCHEME, MAHABOOBNAGAR DISTRICT (FLOW DIAGRAM) Approach channel.
1 VENKATANAGARAM PUMPING SCHEME. 2 LOCATION OF THE PROJECT  At Km of Akhanda Godavari Left Bank  Longitude 81°- 35’ – 56” E  Latitude 17°- 8’
DISTRIBUTORIES (D19, D22, D25, D37, D39, D40 TO D55) CONSTRUCTION OF WHOLE DISTRIBUTORY SYSTEM, CM & CD WORKS AND MICRO NETWORK (FIELD CHANNELS) The main.
SRI RAMA SAGAR PROJECT STAGE-II
TELUGU GANGA PROJECT (2 years period)
1 Project Profile : Lifting of 20 tmc of water from foreshore of PJP and Ookachettivagu Project Pondage 2 Administrative Sanction : G. O. Ms. No. 166,
SRI RAMATHEERTHAM BALANCING RESERVOIR NAGARJUNASAGAR RESERVOIR KRISHNA RIVER ONGOLE NAGARJUNASAGAR RIGHT MAIN CANAL ONGOLE BRANCH CANAL RAMATHEERTHAM BALNCING.
CHINA TUMBALAM TANK (Existing) DUDDI LI SCHEME DUDDI RESERVOIR (New) BASALA DODDI LI SCHEME MADHAAVARAM LI SCHEME Location : DUDDI (V), Madhavaram Tanda.
52, 060 Ac. Cap TMC Cap TMC 28, 000 Ac. Under Progress.
Erdeneburen HPP Project Implementation Unit
UTTAR PRADESH IRRIGATION DEPARTMENT BUNDELKHAND PACKAGE.
Karnataka Urban Infrastructure Development & Finance Corporation Working towards better urban living KARNATAKA MUNICIPAL REFORMS PROJECT 1.
Presented by Telangana Retired engineers forum 11.
FLOW DIAGRAM OF C.B.R RIGHT CANAL (LINGALA CANAL FROM KM TO KM ) WORKS GROUNDED COMPLETED CHITRAVATHI BALANCING RESERVOIR (Existing) KM 0.00.
TARAKARAMA THIRTHA SAGARAM PROJECT Project Cost : Crores Ayacut: Acres Km. Excavation of RMC including Distributories, Field Channels.
Hyderabad city water supply system
Sardar Sarovar Narmada Nigam Ltd.
Polavaram Irrigation Project
City:- Corporation of City of Panaji
Polavaram Irrigation Project
Polavaram Irrigation Project
Polavaram Irrigation Project
Polavaram Irrigation Project
Polavaram Irrigation Project
Polavaram Irrigation Project
Polavaram Irrigation Project
Polavaram Irrigation Project
Virtual Review - #61 by Chief Minister Dt
Polavaram Irrigation Project
#80 Virtual Review by Hon’ble CM dt: 5 Nov. 2018
Polavaram Irrigation Project
#28 Site Visit of Hon’ble Chief Minister Dt. 22nd October, 2018
Polavaram Irrigation Project
#79th Virtual Review by Hon’ble Chief Minister Dt. 29th October, 2018
Polavaram Irrigation Project
#82 Virtual Review by Hon’ble CM dt: 19th Nov. 2018
Polavaram Irrigation Project
#85 Virtual Review by Hon’ble Chief Minister, Dt. 21st January 2019
#87 Virtual Review by Hon’ble Chief Minister Dt: 04 FEB 2019
#89 VIRTUAL REVIEW BY HONBLE CHIEF MINISTER Dt. 25th FEBRUARY 2019
Polavaram Irrigation Project
#86 Virtual Review by Hon’ble Chief Minister, Dt. 28th January 2019
Presentation transcript:

VELIGALLU PROJECT 1 PROJECT PROFILE: Formation of earth dam, construction of spillway & fabrication and erection of 5 Nos. Radial gates for Veligallu Project in Galiveedu (M) of Kadapa District 2Admn. Sanction: G.O.Ms.No. 209, Dt: for Rs Crores 3 No. of Packages [1 No. (Old) Head works & canals 1 (New) gates] :2 4Agreement value of package:Rs Crs. 5Budget Provision:Rs Crs. 6Expenditure of the project :Rs Crs :Rs Crs. Cum. Exp. :Rs Crs. 7Utilisation:1.64 TMC 8Reservoir capacity:4.643 TMC 9Ayacut:24,000 acres 10Land Acquisition Require d :3124 Acres Acquire d :2561 Acres

VELIGALLU PROJECT 11Forest Land: 95 acres Proposals sent & CCF, GOI, Bangalore on Approval awaited. 10Mob. Adv. (Old and New Packages): Paid Recovered Rs Crs. Rs Crs Rs Crs. Rs Crs. TOTALRs Crs. 11Target Date of completion:9/2006

ONGOING : (OLD PACKAGES): Pkg. Value : Rs Crs.  Formation of earth bunds: Rs Crores.  Right Earth Bund: Completed  Left Earth Bund: Progress  Construction of Spillway: Rs Crores – 90% Completed  Expenditure up to 3/2006 ( ): Rs Crores  Mob. Advance recovered: Rs Crores. EPC Package :  ECP package for canals & gates: Rs Crores – In progress. VELIGALLU RESERVOIR PROJECT

Package No.5 / Cat - II i.Excavation of canal and fabrication, & supply of 5 Nos. radial gates. VELIGALLU RESERVOIR PROJECT Name of the Contractor: P.Lakshmu Reddy & M/s Kranthi Constructions (JV) Agreement Amount : Rs Crs. Agreement Date: Period of Completion: 18 Months Target date of Completion: 9/2006  Investigation: Completed  Designs (Canals): Approved Structures: 26 Nos approved against 95 Nos.  Execution (canal): 54 Km progress against Km  Qty. of earth work done: 19,40,700 cum against 40,76,450 cum  No. of Machinery deployed : 82 Nos. (Poclains-21, Tippers-25, Water tankers-6, Drilling Machines-14, Road roaller – 4, Concrete Mixer – 8, Dozers -4)  EXPENDITURE : Rs.62.24Crs. (inc. mob. adv. Rs.7.29 Crs.) against Rs Crs.  : Rs Crs. (Mob. Adv.)  : Rs Crs. (Inc. Mob. Adv. Rs Crs.) Mob. Advance recovered: Rs Crores.  Land Acquisition: Required Ac., Acquired – Ac.