Proton PMG May 7 th 2015 Cons Gattuso AD Shutdown Manager.

Slides:



Advertisements
Similar presentations
Chris Smith Booster RF Cavity Upgrade Contents: The Booster Existing RF Cavities Why Upgrade? New Cavities Prototype Plans University Involvement Prototype.
Advertisements

Proton Source Workshop Booster Downtime Wednesday, December 8, 2010 T. Sullivan.
Proton Source Task Shutdown 2014 RFQ Injection Linac Tank 1 to 2 emmittance probe and Collimator NTF Beam Line Repair 400 MeV Turbo Station Replacement.
FAC, 10/12/06 D. Schultz 1 Readiness for 2007 Startup Linac Injector Controls ARR David Schultz.
ANU Shutdown Status AEM meeting Cons Gattuso 6/3/2012.
ILCTA_NML Progress at Fermilab Jerry Leibfritz September 10, 2007.
Proton Plan PMG 3/22/07 E Prebys 1 Proton Plan Status February Eric Prebys.
Machine Advisory Committee Review APS Upgrade Installation Plan and Schedule John Noonan November 15, 2006.
PIP Update Aug 6 th Agenda Summary Update – Current Activities/Updates – New Tuner Test Result: Reid & Slabaugh – Anode Supplies: Crawford.
Bubble Chamber Installation Kick-Off Meeting May 28, 2014, Grames Let’s discuss two jobs between the cryounit and injector gate. Bubble chamber (5D) New.
PIP Update Feb 20 th Agenda Summary Update – Current Activities/Updates – Startup Schedule Highlights – Upcoming Talks, Reports, Meetings Updates/Talks:
Muon Campus Projects Jerry Annala Jan 23, µ AIP Scope Recycler RF system to provide needed bunch structure to future Muon Experiments Recycler RF.
Shutdown 2012 ES&H Friday April 27, 2012J. Anderson Jr. Page 1 Draft Schedule Beam off to Experiments 0000 Monday April 30 th Linac continues operations.
09/28/07Shutdown’07 Week 8 F.G. Garcia1 MTA beam line installation Weekly Report September 28, 2007 Period covered: September 24 th September 28 th (Week.
ANU Shutdown Status AEM meeting Cons Gattuso 7 May 2012.
August 05, Startup 2013 Machine Status:  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac Booster  Main Injector Startup.
All Experimenters’ Meeting November 03, 2014 Photo by Greg Vogel.
All Experimenters’ Meeting February 09, Accelerator Operation Summary Calendar Week # 06 NuMI Weekly Integrated Intensity 6.69 E18 protons Beam.
HINS 6-Cavity Test 3 Month Plan Jan 12, Current Schedule 2-3 day shutdown scheduled to start Jan 18 (Wednesday) to upgrade BPM system and reinstall.
PIP Update June 3 rd Agenda Summary Update – Current Activities – Updates Ken Domann – Budget & Schedule Ryan Crawford – Anode Supply Update – Additional.
2015 Shutdown Joe Compton 3/11/2015. RIL PIP Work  Install operational laser notcher  5 days  Dave Johnson & Todd Johnson.
Accelerator and NuMI Upgrades Shutdown Update Cons Gattuso July 02, 2012 July 2, 2012 Cons Gattuso1.
Proton Improvement Plan Bob Zwaska January 7, 2013 All-Experimenters Meeting.
F Proton Plan Eric Prebys, FNAL Accelerator Division.
08/31/07Shutdown’07 Week 4 F.G. Garcia1 MTA beam line installation Weekly Report August 31, 2007 Period covered: August 24 th to August 31 st (Week 4)
Proton Improvement Plan Keith Gollwitzer January 5th, 2015 All Experimenters’ Meeting 11/5/2015Gollwitzer AEM.
PIP Update July 30 th Agenda Summary Update – Current Activities/Updates – Project Controls Update: K. Domann – Linac Lattice – Valeriy Kapin.
PIP Update April 8 th Agenda Summary Update – Current Activities – Updates (V. Kapin: Booster Collimator) – Additional Meetings/Notes.
PIP Update April 8 th Agenda Summary Update – Current Activities – Updates (Joe Compton - shutdown) – Additional Meetings/Notes.
TD Help for Shutdown 2012 Preliminary, will be updated April 18, 2012.
PIP Budget Codes Budget FY12 Updates October 19, 2011 PIP Meeting.
Proton Plan PMG 7/7/05 E Prebys 1 Proton Plan Status June Report Eric Prebys.
Proton Plan PMG 9/27/07 E Prebys 1 Proton Plan Status Eric Prebys.
F All Experimenters' Mtg - 2 Jun 03 Weeks in Review: 05/19/03 –06/02/03 Keith Gollwitzer – FNAL Stores and Operations Summary Standard Plots.
Accelerator Status and Plans
All Experimenters’ Meeting January 26, Accelerator Operation Summary Calendar Week # 03 NuMI Weekly Integrated Intensity 2.74 E18 protons Beam.
PIP Update June 17 th Agenda Summary Update – Current Activities – Updates (Alexander Valishev - Simplified Modeling of Space Charge Losses in Booster.
Updated Overview of Run II Upgrade Plan Beam Instrumentation Bob Webber Run II Luminosity Upgrade Review February 2004.
All Experimenters’ Meeting October 20, 2014 Photo by Greg Vogel.
All Experimenters’ Meeting December 8, 2014 Photo by Greg Vogel.
PIP Update June 18 th Agenda Summary Update – Current Activities/Updates – Reid, Slabaugh.
PIP Update April 10 th Agenda Summary Update – Current Activities/Updates – Startup Plans – Upcoming Talks, Reports, Meetings Updates/Talks: Eliana.
09/07/07Shutdown’07 Week 5 F.G. Garcia1 MTA beam line installation Weekly Report September 07, 2007 Period covered: August 31 st to September 7 th (Week.
PIP Update April 3 rd Agenda Summary Update – Current Activities/Updates – Startup Plans – Upcoming Talks, Reports, Meetings Updates/Talks: Trevor.
July 15, 2013 Photo by Greg Vogel. Shutdown Machine Status:  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac Booster.
All Experimenters’ Meeting September 23, Accelerator Operation Summary Calendar Week # 38 NuMI Weekly Integrated Intensity 4.57 E18 protons BNB.
Proton Plan PMG 4/18/05 E Prebys/J. Sims 1 Proton Plan Status March Report Eric Prebys Jeff Sims.
August 12, Machine Status: 2013  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac : Roof hatch installed Booster : Magnet.
Proton Source Meeting, August 8, 2003 – E. Prebys 1 Major Projects in Linac/Booster  New Linac Lambertson  (4) New EDWA magnets in MI-8 line  (3) New.
PIP Update July 29 th Agenda Summary Update – Current Activities – Updates Tom Kubicki (Station 20,21,22 – Gallery and Equipment Work) – Additional.
Intensity Dependent Quad Ramps We know that in order to get the most intensity, the quad ramps must be tuned for a particular intensity. The way this is.
All Experimenters’ Meeting November 25, 2013 Photo by Martin Murphy.
All Experimenters’ Meeting November 4, Accelerator Operation Summary Calendar Week # 44 NuMI Weekly Integrated Intensity 5.97 E18 protons BNB.
09/21/07Shutdown’07 Week 7 F.G. Garcia1 MTA beam line installation Weekly Report September 21, 2007 Period covered: September 14 th September 21 th (Week.
Booster Status, September 4, 2003 – E. Prebys 1 Frantic Shutdown Preparations Continue…
09:00 Meeting Shutdown Update June 29 th 2015 Cons Gattuso AD Shutdown Manager.
Proton PMG September 3 rd 2015 Cons Gattuso AD Shutdown Manager.
ILCTA_NML Progress at Fermilab Jerry Leibfritz August 16, 2007.
PIP Update June 17 th Agenda Summary Update – Current Activities – Updates (Matt – Cavity Refurbishment) – Additional Meetings/Notes.
Work in the Tevatron A0 D0 B0 C0 E0 F0 Separators A49 Separator B48 TEL 2 installation A0 Xtal Collimator 1.5 m collimator A48 Shimming 6 magnets/day At.
MI/RR Shutdown 2012 Dec Gev Lines/Injection region: Staging equipment, cleaning and prepping new part to start vacuum work. Preparing to modify the.
10/3/2014 Proton Source Update. RIL Update Source B is back in place and under vacuum It will be baked over the weekend It will be started early next.
Mike Andrews January 31, Weeks Activities Target Pile Fan Upgrades Install piping for new cooling coil units Install controls for new coil.
All Experimenters Meeting PIP Report Fernanda G. Garcia on behalf of PIP team 10/06/2014.
Status of Mechanical Design of LEBT Rich Andrews, Matt Alvarez, Tim Hamerla, Danny Snee.
Machine operation and daily maintenance management in SOLEIL
Injector –Linac Status & Schedule E. Bong LCLS FAC October 12, 2006
Injector / Linac Installation Current Status
Upgraded Injector Test Facility
Polarized 3He target installation
Presentation transcript:

Proton PMG May 7 th 2015 Cons Gattuso AD Shutdown Manager

Project Schedule Assumptions made… –Work day is 6 hours –Work week is 5 days –External help rated at 80% efficiency factor 11/4/14C. Gattuso| AD Shutdown Manager2

Major Jobs in the shutdown Linac –Laser Notcher installation Booster –Anode power supplies replacement –Vacuum upgrades –Installation of BRF 20 and prepare area BRF21 & 22 install –Water system upgrades MI/RR –TSP to Ion Pump conversion Muon Campus –F0 Aperture improvement –F17 region rework –AP1 line rework –RR to P1 installation NuMI –Multi wire replacement –Target inspection – New as of last week Control –Standard Database system and JAVA updates 11/4/14C. Gattuso| AD Shutdown Manager3

Planning Status Controls -98% Planned –Need to schedule power outage which will impact schedule some of the controls work Safety System Testing -98% Planned –Driven by individual machine schedule up time Linac/Booster -98% Planned Main Injector/ Recycler -90% planned –RR loss issue External Beams -75% planned –NuMI- ~60% planned Target inspection – Newly added to the shutdown Muon Alcove Shielding Block Installation –BNB ~80% complete Instrumentation cable pulls MI Safety system reconfiguration/gate installation –SY120 beam line-75% planned Muon Campus -90%complete –RR to P1line/F0/F17/M1 line 11/4/14C. Gattuso| AD Shutdown Manager4

Linac and Booster Shutdown Readiness Linac –Laser Notcher In the fabrication process may not be ready when scheduled for the first week of the shutdown Booster –Anode supplies Testing underway on the first Anode supply Second should be built by the start shutdown –Installed by middle/end shutdown –RF cavities Work in progress: we should have 20 cavities in place at the end of the shutdown* Currently at 17: –1 cavity will be ready end of May –2 cavities should be ready by the end of the shutdown 11/4/14C. Gattuso| AD Shutdown Manager5

Main Injector/Recycler Shutdown Readiness RR TSP to Ion pump conversion –Cable shipment (~120K ft) Will receive first shipment this week, Will have all the cable in hand by first week in June –Ion pump shipment First 100 pumps will be delivered by end of June Remaining 72 pumps will by delivered by end of July –Misc components all here by end of June Stands/Seals/bolts/ect. –Drill base assemble 1 of 2 done –Acquired all of the Tevatron 30 l/s power supply Power supplies have been relocated into new rack locations –CIA create modification are underway RR 307 Beam Pipe replacement –Spool piece is fabricated and ready to go. MI 307 Duplex Pipe replacement –Design is underway RR Beam loss issues –Investigation continues 11/4/14C. Gattuso| AD Shutdown Manager6

Muon Campus Shutdown Readiness RR to P1 line –Vacuum system Design ~90% Component Fabrication: 2 magnet spools, 2 of the 3 spools are completed, Beam box fabrication is underway –Stands/girders Design ~90% Component Fabrication ~ 85% F0 Region Reconfiguration –Vacuum system Design ~ 95% Component Fabrication 1 of the 4 major spools, 2 out the 4 minor is complete –Stands/girders Design ~ 95% Component Fabrication ~underway will arrive Mid/later May F17 Region Reconfiguration –Vacuum system Design ~ 95% Component Fabrication -underway will arrive early/Mid June –Stands/girders Design ~ 95% Component Fabrication ~underway will arrive later May early June 11/4/14C. Gattuso| AD Shutdown Manager7

SY Shutdown Readiness F32-3 water leak –Brazing the leak should fix it May need magnet replacement will be determined first week of the shutdown NS2 LCW System modernization ~ 3 weeks –Components/Electronics on hand MS2 LCW System modernization ~ 4 weeks –Components/Electronics on hand 11/4/14C. Gattuso| AD Shutdown Manager8

BNB Shutdown Readiness Cable pulls for MI12 Instrumentation Interlock system modification –Cables for Safety System Gates We have in hand in hand –Gates system Waiting on Safety to verify gate positions We have the Safety System Interlock boxes/Keytree/misc We have a gate design and its ready to go out to vender –Procedure changes need to be made/reviewed –Software changes to the Safety System need to be done/tested 11/4/14C. Gattuso| AD Shutdown Manager9

What's Left to Schedule Local and global power outages –Potential impact on the order of 3-4 days to overall schedule FESS Maintenance work –Minimal impact to accelerator work NuMI Horn/Target Inspection –Alignment resource already over booked Need to access level of impact to upstream machines/jobs Safety System Test –Semi-Annual test potential impact on the order of 1-2 days to overall schedule RR Loss issue –Looks to be an alignment issue Will require Alignment and possibly mechanical modifications 11/4/14C. Gattuso| AD Shutdown Manager10

Competing for Resources Magnet storage –Having difficulty getting storage space for the magnets being pulled from current beam line. Magnet Removal List: –MI ILAM (4) –CMags (3) –EPB trims 20 inch(1) –EPB trims 35 inch(3) –EPB trim 40 inch(1) –EPB (8) Will be stored in A0 Transfer Hall –3Q120s (4) Machine shop –We are starting to get our requests complete that were submitted prior to the LCLS-2 work beginning, ~ 1.5 months late Remaining request are being submitted to outside sources Without a increase in priority, it not clear what we do during the shutdown… 11/4/14C. Gattuso| AD Shutdown Manager11

Man Power Needs AIP Crews –RR to P1 Line Crew leader 4 Mech/vac techs 3 Iron workers TSP to IP Crew Mechanical Crew –Crew leader –7 Mech techs (3 tech with lift restrictions) – Short 3 techs Vacuum Crew –Crew leader –5 Vac techs (1 tech with lift restrictions) 11/4/14C. Gattuso| AD Shutdown Manager12 –F0/F17/M1 line Crew leader 4 Mech/vac techs (1 tech with lift restrictions) 3 Iron workers Water System Crew Crew Leader 12 Techs Trades –7 Iron Workers (counted above + 1 foreman) –12 Electricians (not optimized) –2 Pipe Fitters Lab Man Power Break Down AD28 PPD6 ESH1 TD5 Need 3 techs

Preparing For The Shutdown 11/4/14C. Gattuso| AD Shutdown Manager13 Access Opportunities Staging equipment/components Preparing areas for reconfiguration Crew meetings Check and verify training Acquire and outfit crew appropriate with PPE Review Jobs Step through major jobs Write/Review ALARA planning Write/Review HA’s for Task Machine preparation Cool off times Re-Coring Deal with anything else that pops up

Shutdown.fnal.gov Shutdown Coordination Web Page 11/4/14C. Gattuso| AD Shutdown Manager14