Port of Long Beach CEQA/NEPA Process Rick Cameron 2010 Tenant Orientation.

Slides:



Advertisements
Similar presentations
Update on the Port of Long Beach Doug Thiessen, P.E. ACEC LA
Advertisements

LESSONS LEARNED HURRICANE “MICHELLE” STORY THE CAYMAN ISLANDS HEALTH SERVICE AUTHORITY.
Identify source area and COCs Determine nature and extent of discharge Evaluate potential risks to public health and the environment Develop Investigation.
PUBLIC SCOPING MEETING Draft Environmental Impact Report for the SEWER AUTHORITY MID-COASTSIDE (SAM) WET WEATHER FLOW MANAGEMENT PROJECT August 28, 2007.
1 GOODS MOVEMENT IN CALIFORNIA. 2 California is facing a significant transportation infrastructure shortfall. California is using innovative approaches.
US Army Corps of Engineers BUILDING STRONG ® FOLSOM DAM MODIFICATIONS APPROACH CHANNEL EIS/EIR Major Robert Dion and Cameron Sessions Project Managers.
1 Great Lakes Maritime Task Force 14th Annual Informational Briefing for the Great Lakes Delegation Tom Buck, C.E.O. Carmeuse Lime and Stone April 2, 2009.
Stephanie Jones Stebbins Seaport Environmental Programs
Doug Sereno, PE, ENV-SP, F.ASCE Director of Program Management Port of Long Beach Initiatives of a Sustainable Seaport 2015 SUSTAINABILITY CONSTRUCTION.
PORT OF NEW YORK/NEW JERSEY
THE 1 ST EASTERN AND SOUTHERN AFRICA PORTS ENVIRONMENTAL MANAGERS WORKING CONFERENCE PORT SUSTAINABILITY AND ENVIRONMENTAL CHALLENGES (A South African.
America’s Port Future Ports – Annual Conference San Pedro, California June 23, 2014 Port of Los Angeles.
1 Improving the Efficiency of Moving Goods from Ports to Market Good Jobs – Green Jobs Conference February 10, 2014 American Association of Port Authorities.
BORDER ENVIRONMENT COOPERATION COMMISSION Mitigating Impacts on Water Resources: Environmental Infrastructure Investment.
Port of Long Beach Development Projects Al Moro, P.E. Chief Harbor Engineer ACEC January 18, 2012.
Department of Transportation Consideration of Potential City of Pasadena Position Related to SR710 Extension Alternatives Being Considered By Metro City.
A Premier Gateway for International Trade Gina Barro Business Development.
CA Regional Water Quality Control Board San Diego Region CEQA SCOPING MEETING: TENTATIVE CLEANUP AND ABATMEMENT ORDER (CAO) NO. R January 21,
Senate Select Committee on Climate Change and AB 32 Implementation December 3, 2013.
PUBLIC MEETING November 19, 2003 Lower Manhattan Redevelopment D015183, PIN NYCD NYSDOT, REGION 11 Route 9A Project.
2014 Project Updates Building the Port of the Future Gina Barro Business Development Manager Trade Development Division.
Regional Transportation Investments: Alaskan Way Viaduct / Seawall Port of Seattle Commission Policy and Staff Briefing March 14, 2006 Item No. xx Supp.
Middle Harbor Redevelopment Project WEDA Conference November 5, 2009.
Port of Long Beach 76 Foot Main Channel Dredging Project Doug Thiessen, Port of Long Beach (POLB),Al Moro, Chief Harbor Engineer, POLB Emily Ueda, Program.
Personal reflections on implementing a new regulatory regime Canadian Nuclear Safety Commission Commission canadienne de sûreté nucléaire
California Air Pollution Officers Association September 20, 2007 James C. Hankla Long Beach Board of Harbor Commissioners “Building Bridges to Healthier,
Dr. Satoshi Inoue Professor, National Graduate Institute for Policy Studies Emeritus Secretary General, International Association of Ports & Harbors (IAPH)
California’s Efforts to Address Air Quality Impacts Related to Goods Movement Activities.
CALENDAR ITEM 101 FINAL ENVIRONMENTAL IMPACT REPORT (EIR) S A N F R A N C I S C O B A Y A N D D E L T A S A N D M I N I N G P R O J E C T STATE CLEARINGHOUSE.
Public Workshop UCLA March 4, 2005 Draft Air Quality and Land Use Handbook: A Community and Health Perspective.
Solar Energy Research Center Project CEQA Public Scoping Meeting May 26, 2010.
Texas Department of Transportation Corpus Christi District U.S. 181 Harbor Bridge Project Environmental Documentation and Schematic Development Public.
1. Freight Transport System Facilities: Seaports Airports Rail yards Distribution centers Warehouses High traffic roads Border crossings 2 Modes:
CEQA 101  CA Legislature passed CEQA in 1970; signed by Governor Reagan  CEQA statutes are found in Public Resources Code sections et seq.  The.
1 1 The Project Description: Framing the CEQA Analysis Terry Rivasplata.
AusRAIL 2004 Intermodalism - Rail’s role in the bigger picture A port’s perspective Stephen Bradford CEO, Port of Melbourne Corporation 10 November 2004.
2007 Emissions Inventory. Topics First emissions inventory under Clean Air Action Plan (CAAP) Emissions inventory methodology Cargo throughput changes.
Port of Everett MASTER PLAN UPDATE April 8, 2008.
Australian Road Federation November Meeting Our Transport Challenges (MOTC) Meeting Our Transport Challenges (MOTC) sets out a strategic, long term.
In-Delta Storage Program Environmental Evaluations Stakeholders Committee Meeting January 22, 2003 Leslie Pierce.
State of the Port 2009 International Business Assn. January 30, 2009 Richard D. Steinke, Executive Director Port of Long Beach.
2008 Air Emissions Inventory. Topics CAAP Initiatives Cargo throughput changes Comparison of emissions in 2008 vs Conclusion.
The Plaza at Santa Monica Project PUBLIC SCOPING MEETING
North Georgia Water Resources Partnership
CLEANING UP THE SHIPPING SECTOR
1828 Ocean Ave & 1921 Ocean Front Walk PUBLIC SCOPING MEETING
FAST Act Overview $305 billion 5 year bill – FY ‘16 – FY ’20
Scoping Meeting April 20th 6:00 pm
Commission for Environmental Cooperation (CEC)
NGTA Halton Planning and Public Works Committee
Personal reflections on implementing a new regulatory regime
Draft Transportation Element September 6, 2017
Health Risk Assessment (HRA): Workshop Guide
Engineering Projects Update Al Moro, P.E. Chief Harbor Engineer
Overview What is the CEQA environmental review process?
Building a Phase III WIP for Wastewater, Stormwater & Septic Systems
Stormwater Control Transfer Program Overview January 31, 2018
AAPA Environment Committee
Construction Management & Inspection
Capital Programming Committee South Coast Rail Phase 1 Service
Port of Long Beach DARRIN LAMBRIGGER, P.E., CCM
Capital Region Climate Readiness Quarterly Meeting February 24, 2015
Integrated Bilateral Agreement (IBA) 2018 to 2028
Recommended Methods for Assessing VMT
Proposed CEQA Guidelines
Final Environmental Impact Report
Chicago to Council Bluffs-Omaha
© 2017 Global Market Insights, Inc. USA. All Rights Reserved Port Equipment Market– Global Industry Forecast & Analysis over
I Street Bridge Replacement Project
Preliminary “DRAFT” 2019 Projected Year End Highlights
Presentation transcript:

Port of Long Beach CEQA/NEPA Process Rick Cameron 2010 Tenant Orientation

“Remember When…”

Present Day

CEQA Process Why Does it Take so Long! Establishing a project baseline Coordination with other agencies Agency standards and “thresholds” Studies, reports, model runs ─ Terminal Capacity Modeling ─ Transportation Study (Local and Regional) ─ Health Risk Assessments Alternatives Analysis Mitigation Measures – How Much and When? Responding to Public Comments Political CEQA – Not Defined in the Guidelines

Future CEQA Challenges Cumulative Impacts ─ Extent of analysis ─ Feasible mitigation measures (project vs. program) More Mitigation – Beyond CAAP? Green House Gases – How Far? AQ Conformity Project vs. Regional System Improvements Environmental Justice

CEQA Project Status

On-Dock Rail Support Facility EIR/EA Cemera Aggregate EIR Gerald Desmond Bridge EIR/EA Middle Harbor EIR/EIS Pier G Rail Yard Enhancement Pier G Redevelopment Project Phase II Turning Basin Dredge Project Terminal Island Rail Projects EIR IR Site 7 Remedial Dredge Project New Cerritos Rail Bridge MSC/SSAT Rail Yard Redevelopment Reconfiguration of CP Mole Grade Separation for Reeves Crossing and Closure POLB Projects Pier S Development Project EIR/EIS

IR Site 7 (West Basin)Dredge Project ─ Approved New POLB Administration Building ─ Approved Middle Harbor Terminal Redevelopment ─ Approved in May 2009 ─ First project to participate in the cumulative mitigation program ($15 million) Success

Gerald Desmond Bridge Replacement ─ Release Draft EIS/EIR in early February 2010 Pier S Terminal Development ─ Release Draft EIS/EIR in late Spring 2010 Rail Improvement Projects (various) ─ On Dock Support Facility Project (EIR) ─ Terminal Island Rail Improvements (EIR) Pier G Railyard Improvements POLB CEQA Projects

Thanks! Overall Industry Support Green Flag Program Cleaner Vessel Fuels Clean Trucks Program Terminal Equipment Upgrades Overall Terminal Efficiency Improvements This helps get EIR’s through the process!