Sauriol Bohde Wagner architects and associates, inc. 46869 Garfield Road Macomb, Michigan 48044 586-532-9388 ph. 586-532-9377 fx. www.sbwarchitects.com.

Slides:



Advertisements
Similar presentations
Development Strategy nd Consultation. Our Mission To proclaim Gods kingdom and call people to worship God in Streatham To seek to serve our community.
Advertisements

Presents. Clubhouse lower level Renovation December 2013.
Oakwood Presbyterian Church Feasibility Study 10/02/2012Copyright Hoffman Architecture The Trellis and the Vine Oakwood Presbyterian Church.
Bronze Award: Library/Media Center
Forever Young Activity and Multi-Service Center
Welcome To The New Ebenezer Baptist Church Located at 1200 & 1236 Gregg Street & 1921 Lady Street.
Park School Modernization Summer New paint, new glass, new landscape, new flagpole, and new paving Before After Entry.
Mission: Helping each other follow Jesus’ way. (John 14:6) Vision: That through Him all might be saved. (John 3:17) MARCH 2014 Miracle Sunday May 18, 2014.
Upper Level Copy Room Office Sanctuary Pastor’s Study To Epworth House Kitchen-Acolyte Lobby Courtyard Wesley Room Prayer Room Janitor Storage Nursery.
Congregation Survey Summary & Program Statement KATY first united methodist church August 30, 2009.
September 21 Update. Future Main Entrance (looking south)
Unit 11 Drawing Reading Part ⅠIllustrated Words and Concepts
Smoke Alarm Placement Example #1 Single story house Laundry Garage Living Dining Kitchen Bedroom Bathroom.
NEW MERCY CENTER. Dramatic 35 foot tall Bright Silver Building entrance cross. Recognition by custom engraved plaque. This Cross will be up lit at night.
Building Plan Presentation The Evangelical Lutheran Church of The Holy Trinity.
Center Grove High School Addition & Remodeling Schematic Design Phase Faculty Presentation August 27, 2008.
SCHEMATIC DESIGN PRESENTATION
Logo. PRELIMINARY SITE PLAN PROGRAM GOALS Embrace & live out our Mission Grow in commitment to Christian living through: Education, Worship, Stewardship,
Church Renovation/ Expansion Proposals Willowdale.
4900 S ROUTE 31 CRYSTAL LAKE 1. AERIAL 2 PROPERTY HISTORY 3 Constructed by Sherman Hospital in 1978 Now Owned by Advocate Group.
MICHIGAN STATE UNIVERSITY OWEN HALL REFURBISHMENT RE-ENERGIZING OWEN HALL.
Schacht aslani architects P ENINSULA C OLLEGE library media center faculty administration building 100% Design Development 28 February 2006.
ADDITION & REMODEL Eugene Field Elementary School.
A LL D ULLES A REA M USLIM S OCIETY. ADAMS CORE VALUES.
Property: Block of Norzagaray-San Justo-San Sebastian Exact address: #251 Calle San Sebastian Viejo San Juan, PR.
1. 1 3/14/11 Church Conference 14-Mar-11 Welcome and Introduction Opening Prayer Presentation of Building Project Motion to Approve Project Vote on Proceeding.
Master Plan Committee Report to Church Council August 26, 2008.
Schematic design presentation School of Business South Hall Renovation.
©2009 Strang, Inc. Orchard Ridge United Church of Christ September 20, 2009.
ENERGY EFFICIENT HOUSE DESIGN UDC, Van Ness Campus Student Architects: Sarah Alexander and Roberto Martin.
Casey Middle School Boulder, Colorado Middle School, Unbuilt Category RB+B Architects, Inc Exhibition of School Planning and Architecture.
This question speaks to primary ownership of the room décor. Will the space be designed for contemporary worship that youth will be allowed to occupy.
HOUSING AUTHORITY Kathleen Millar. Floor Plan- level 1.
Seating Room for lighting, recording etc. Area behind Stage Wings Stairs Orchestra Pit Wall for Backdrops.
Phase III Design Development Finalization December 23, 2008 apcosigns.com.
March 12, 2015 Ss. John & Paul Catholic Church Feasibility Study.
Houston TranStar Building Expansion 2009 Status. Aerial of Existing Building.
BRANDON BAPTIST CHURCH MASTER PLAN 8/31/2015 BRANDON BAPTIST MASTER PLAN BRANDON BAPTIST CHURCH MASTER PLAN 1.
October 15, 2012 Oakwood Presbyterian Church Feasibility Study Design Meeting 2 Copyright Hoffman Architecture /02/20121.
Greater Mt. Zion Baptist Church 26 January 2014 Jackson Galloway Associates, PLLC.
` riddle design 25 January 2009 Emmanuel Episcopal Church Formation Addition and Renovations.
Family Life Center / Youth Center 201 Music Office 216 – 217 Children’s Classroom 202 – 203 future use 218 Kid’s Klub 204 old sanctuary 219 – 220 Storage.
Learning, Health, and Safety Capital Project Alternates and Change Order
Counter & Cabinets Counter Cabinet Office Women Men Kitchen Area Dining Entrance ~30 FT ~80 FT Approximate Sizes – Not to Scale.
Master Plan SODERSTROM ARCHITECTS Site Aerial Grade School High School Middle School Athletics Dining.
Out Patient Entrance Before Construction. Out Patient Entrance After Construction.
Unity Hall HOLY FAMILY CATHOLIC CHURCH DAVIDSONVILLE, MD.
The Campus 2.06 Acres or 89,734 sq ft of Land 25,058 sq ft Church Building 4,239 sq ft Sanctuary 497 sq ft Balcony 20,322 sq ft Multipurpose.
Wilson Addition. Wilson Addition.
St. Luke Lutheran Church
UPDATE ON DOE RUN ELEMENTARY CONSTRUCTION PROGRESS
Diocese of Northampton Scott Tallon Walker Architects
Building Committee April 20th, 2016.
Penn Medicine Chester County Hospital
All Saints Church proposal
Fire Department Truth or Consequences Fire Department built a new complex in 2001 at 310 East 9th Street. This complex was setup to house an EOC/Dispatch.
THE PROPOSED EXHIBITION CENTRE PERADENIYA UNIVERSITY
Mary Queen of Apostles Facilities Master Plan Update
1 Building 178 – Aug Rosecrans St. Truxtun Rd.
APPROXIMATE SIZES NOT TO SCALE
1 Semester Project Design A Multi Story Office Building
Education Building.
PHASE I NEW SANCTUARY BUILDING COMPLETE WORSHIP SPACE FOR 350
Cafeteria exit exit Entrance to media lobby 12
Concept Features Bus entry, exit and drive are separate from visitor and parent entry and drive Additional area behind building for bus traffic and turn-around;
WES Renovation Update Photo Gallery
N Learning Resources Center To Sim Lab Interior--- Office 115 ELEVATOR
250 Catalonia Building Remarks:
250 Catalonia Building Remarks:
Presentation transcript:

Sauriol Bohde Wagner architects and associates, inc Garfield Road Macomb, Michigan ph fx. Hope Lutheran Church Warren, Michigan Preliminary Schematic Design New Entry Lobby/Gathering Space and Support Functions November 18, 2015

Proposed Grade Level Floor Plan Existing Family Life Center Furnace Room (serving Gathering Space) Existin g Narthex Ramp Down to Lower Level Existing Choir Room NORTH Existing Kitchen Ramp Down to Lower Level Entry Lobby/ Gathering Space 39’ x 33’ Passive Seating Area Covered Exterior Gathering Space Existing Stair Existing Storage Room New Glass and Siding Closures in Existing Masonry Openings Entry from South Parking Entry from North Parking Main FLC Entrance Existing Drop-Off Line of Overhan g Above Existing Parking Vest. Entry Lobby Base Bid 1,485 s.f. Covered Entry Alternate 576 s.f.

Proposed Grade Level Floor Plan Existing Family Life Center Furnace Room (serving Gathering Space) Existin g Narthex Ramp Down to Lower Level Existing Choir Room NORTH Existing Kitchen Ramp Down to Lower Level Entry Lobby/ Gathering Space 39’ x 33’ Passive Seating Area Covered Exterior Gathering Space Existing Stair Existing Storage Room New Glass and Siding Closures in Existing Masonry Openings Entry from South Parking Entry from North Parking Main FLC Entrance Existing Drop-Off Line of Overhan g Above Existing Parking Vest. Entry Lobby Base Bid 1,485 s.f. Covered Entry Alternate 576 s.f. Pastor’s Office 24’ x 12’ Office 18’ x 11’ General Office 17’ x 14’ Copy Center 6’ x 14’ Furnace Room Reception Counter with folding partition closure Office Wing Alternate 975 s.f.

Proposed Grade Level Floor Plan Multi-Use Room 30’ x 14’ Existing Family Life Center Furnace Room (serving Gathering Space and Restroom Wing) Existin g Narthex Ramp Down to Lower Level Existing Choir Room NORTH Pastor’s Office 24’ x 12’ Office 18’ x 11’ General Office 17’ x 14’ Existing Kitchen Ramp Down to Lower Level Copy Center 6’ x 14’ Furnace Room Entry Lobby/ Gathering Space 39’ x 33’ Reception Counter with folding partition closure Passive Seating Area Covered Exterior Gathering Space Existing Stair Existing Storage Room Men 9’ x 14’ Women 9’ x 14’ Coats 19’ x 7’ New Glass and Siding Closures in Existing Masonry Openings Entry from South Parking Entry from North Parking Main FLC Entrance Existing Drop-Off Coffee Servic e Office Wing Alternate 975 s.f. Restroom Wing Alternate 1,147 s.f. Line of Overhan g Above Kitchenette Existing Parking Vest. Entry Lobby Base Bid 1,485 s.f. Covered Entry Alternate 576 s.f.

Existin g Family Life Center Below Hospitality Service (kitchenette ) 6’ x 6’ New Meeting Room 1 21’ x 20’ New Meeting Room 2 16’ x 19’ Existing Stair New Meetin g Room 3 12’ x 24’ Proposed Upper Level Floor Plan NORTH Existing Narthex Below Existing Ramp to Lower Level Below Proposed Modifications to Existing Office Suite 1,161 s.f.

Sauriol Bohde Wagner architects and associates, inc Garfield Road Macomb, Michigan ph fx. Hope Lutheran Church Warren, Michigan Thank You!