Needham Town Hall Feasibility Study Cover & Credits Prepared for: Needham Town Hall Feasibility Study Committee Permanent Public Building Committee John.

Slides:



Advertisements
Similar presentations
Historic Preservation Tax Credits The Process and Avoiding Common Problems National Park Service, Technical Preservation Services.
Advertisements

Carriage house expansion at the Grover Cleveland birthplace
F. A. Day Middle School Newton, MA Site Plan & Entry Plaza 1 st, 2 nd & 3 rd Floor Classrooms Cafeteria Administration and Student Services Suites West.
Tewksbury Town Hall Rehabilitation CPA Fund Project Special Town Meeting October 5, 2010.
Front view of coach house (photographer facing west) Front view of coach house (facing north-west)Side view of coach house (facing south) Rear view of.
Greece is a country with a very specific geophysical landscape and a very different climate from place to place. So the traditional architecture in several.
Upper Level Copy Room Office Sanctuary Pastor’s Study To Epworth House Kitchen-Acolyte Lobby Courtyard Wesley Room Prayer Room Janitor Storage Nursery.
Campus signage – Internal
MONSON TOWN HALL / MONSON POLICE BUILDING UPDATE 5/21/2014.
UPSTAIRS DOWNTOWN North Walnut Case Study for Reuse Anna Margaret Barris Project Designer Illinois Historic Preservation Agency.
S E R R A M O N T E V I S T A DALY CITY, CAMARCH 16, Presentation to: City of Daly City Design Review Committee.
Perspective View 5420 Grosvenor Lane RENEWABLE NATURAL RESOURCES CENTER Bethesda, Maryland.
Summary of Proposed Improvements to Town Office Building Carl F. Valente, Town Manager Linda Vine, Deputy Town Manager Mark Barrett, Department of Public.
ARCHITECTURAL HERITAGE REVIEW North Toronto Collegiate Institute Prepared for the Toronto District School Board – Facilities Services / Executive Office.
DRAFT Madison Valley Stormwater Project Phase 2 Seattle Design Commission June 4, 2009 Seattle City Hall Boards and Commissions Room, L2-80.
Town Hall Renovations Board of Selectmen Update October 1, 2013 Town Hall Renovation Committee.
Church Renovation/ Expansion Proposals Willowdale.
Site Survey UCSC -Engineering 2 Linda Rosewood – Lynne Sheehan – Bob Vitale Equipment: WinXP Laptop with Netstumbler MacOSX Laptop with KisMAC Cisco 1200.
GATEWAY CENTER SPACE UTILIZATION STUDY September 17, 2007.
University of Minnesota Molecular & Cellular Biology Building June 1999 PROJECT DESCRIPTION l Molecular & Cellular Biology Building (MCBB) for 70 principal.
Old Mankato Railroad Station By: Ryan Carlson Adam Otto.
Elevations.
Site Survey UCSC -Engineering 2 Linda Rosewood – Lynne Sheehan – Bob Vitale.
Stoughton Public Library Feasibility & Design Study Report by CBT January 28, 2011 Current Library Built in 1969Proposed Library for the Future.
Scholarship Needham Public Schools Proposed Needham High School Cafeteria & Classroom Expansion Presented to Board of Selectmen April 15, 2015.
Town Meeting Presentation October 29, 2012 Randall Library Building Committee.
UC Santa Cruz Engineering Building 2 69,000 ASF ~$47M.
John F. Kennedy High School – Science Wing, Richmond, CA Progress Report POWELL & PARTNERS, ARCHITECTS WCCUSD FACILITY SUB-COMMITTEE MEETING March 12,
NEW MEDICAL FACILITY BUILDING By: Vincent Cannatella and Shelbi Remy Advisor: Edward Rode Instructor: Cris Koutsougeras ET Senior Design 1.
Building Plans.
Property: Block of Norzagaray-San Justo-San Sebastian Exact address: #251 Calle San Sebastian Viejo San Juan, PR.
Williamson County Expo Center: Site Plan Warmup Arena Renovated Arena Expo Hall and Space.
Co-Housing Design Project in Point St. Charles Krys Wodzicki # Design Project I Professor P. Sijpkes April 18th, 2000.
J&J CONTRACTORS’ MAJOR PHASE DRAWING GUIDE HAFB 1305 HVAC Repair Solicitation # MXRD /8/09 1. Chiller line-horizontal work 2 weeks (2 dn shift)
A PLAN TO BUILD AN ELEVATOR October 15, Long-Range Plan –Office-size Elevator –New Fireproof Stairs –Handicap-Accessible Restrooms –Large Multi-purpose.
This question speaks to primary ownership of the room décor. Will the space be designed for contemporary worship that youth will be allowed to occupy.
BUILDING UPDATE AUGUST 23,2014. BUILDING “A” NORTHEAST VIEW.
Elevations McMillan Villas May 30th 2015.
PUBLIC MEETING Application for Zoning Amendment 60 – 80 9 th Street East Ontario Inc. in accordance with Section 34 of the Planning Act 6 May 2013.
Buckingham Palace.
POV Renovations November 14,2014. Repairing the East Wall.
North Augusta High School Design Development Presentation.
I n t e g r i t y - S e r v i c e - E x c e l l e n c e 1 Building 185 Orientation Briefing 101 Nelson Drive Offutt AFB,
c One North Pavilion Ave MLS # Listed $1,500, Riverside, Burlington County, N.J Acres Cellular Leases Excluded.
POTENTIAL SLIDES TO INCLUDE WITH CPC APPLICATION Concord Housing Development Corporation.
Park Side Elementary West Side Elementary Marshall Middle School Marshall High School Proposed Security/Safety Improvements.
UNIVERSITY OF KENTUCKY ALUMNI CENTER STUDY 10 March 2015.
Justice Planners and Designers 212 North 25 th Street, Milwaukee, Wisconsin / Door County Architectural and Engineering.
Sauriol Bohde Wagner architects and associates, inc Garfield Road Macomb, Michigan ph fx.
SMITH SCOTT MULLAN ASSOCIATES 1 KING’S PARK PRIMARY SCHOOL FEASIBILITY STUDY STAKEHOLDER ENGAGEMENT 03 February 2016.
Downtown Feasibility Study Catalyst Roundtable Summary Themes Town Board Work Session March 22, 2016.
Signage Upgrade Project 2016
253 South Los Robles Avenue Predevelopment Plan Review
UPDATE ON DOE RUN ELEMENTARY CONSTRUCTION PROGRESS
40..Murphy Hall.
Cohasset Town Hall THRAC August 29th, 2017.
Cohasset Town Hall Renovation Advisory Committee (THRAC)
City of Ocala Leadership Group Meeting January 28, 2016
City of Ocala Leadership Group Meeting August 27, 2015
Roslin Primary School.
Application for Zoning Amendment
FOLSOM HOUSE 528 East 14th Avenue
KOMPLEX Investors Report – Q
South 6th Street 6th Avenue 5th Avenue
Cohasset Town Hall THRAC August 29th, 2017.
Mathematics Unit 45: Twisted Building
North Augusta High School – Phase 2A and 2B
N Learning Resources Center To Sim Lab Interior--- Office 115 ELEVATOR
Special Mention: Institute of the Americas Building and Addition Lower Level West: Inaccessible Element.
Presentation transcript:

Needham Town Hall Feasibility Study Cover & Credits Prepared for: Needham Town Hall Feasibility Study Committee Permanent Public Building Committee John P. Connelly, Chairman PPBC Kate Fitzpatrick, Town Manager Jack Cogswell, Board of Selectmen Steven Popper, Director of Construction

Needham Town Hall Feasibility Study South Elevation

Needham Town Hall Feasibility Study 1907 Historic Postcard - South Elevation

Needham Town Hall Feasibility Study Historic Fabric - Lower Level Plan

Needham Town Hall Feasibility Study Historic Fabric - First Floor Plan

Needham Town Hall Feasibility Study Historic Fabric - Second Floor Plan

Needham Town Hall Feasibility Study Top Half of Auditorium Current Appearance of Second Floor Offices which Occupy the Auditorium Second Floor Copy Room 1911 Needham Bicentennial Banquet

Needham Town Hall Feasibility Study Balcony Level Storage Room Board of Selectmen’s Meeting Room, Looking East to New Wall Entrance to Board of Selectmen’s Meeting Room Stairway from Second Floor to Balcony

Needham Town Hall Feasibility Study Lower Level Main Corridor Training Room and Town Clerk Storag Room First Floor Main Corridor

Needham Town Hall Feasibility Study Existing South Entrance

Needham Town Hall Feasibility Study Existing East Entrance

Needham Town Hall Feasibility Study Existing West Entrance

Needham Town Hall Feasibility Study Existing Service Entrance

Needham Town Hall Feasibility Study Existing Site Plan

Needham Town Hall Feasibility Study Existing Lower Level Plan

Needham Town Hall Feasibility Study Existing First Floor Plan

Needham Town Hall Feasibility Study Existing Second Floor Plan

Needham Town Hall Feasibility Study Existing Balcony Floor Plan

Needham Town Hall Feasibility Study Description of Preliminary Design Alternates

Needham Town Hall Feasibility Study Existing South Elevation Proposed South Elevation

Needham Town Hall Feasibility Study Newburyport City Hall

Needham Town Hall Feasibility Study Groton Town Hall

Needham Town Hall Feasibility Study Alternate One - Site Plan

Needham Town Hall Feasibility Study Alternate One - Lower Level Plan

Needham Town Hall Feasibility Study Alternate One - First Floor Plan

Needham Town Hall Feasibility Study Alternate One - Second Floor Plan

Needham Town Hall Feasibility Study Alternate One - Balcony Floor Plan

Needham Town Hall Feasibility Study Alternate Two - Site Plan

Needham Town Hall Feasibility Study Alternate Two - Lower Level Plan

Needham Town Hall Feasibility Study Alternate Two - First Floor Plan

Needham Town Hall Feasibility Study Alternate Two - Second Floor Plan

Needham Town Hall Feasibility Study Alternate Two - Third Floor Plan

Needham Town Hall Feasibility Study Alternate Three - Site Plan

Needham Town Hall Feasibility Study Alternate Three - Lower Level Plan

Needham Town Hall Feasibility Study Alternate Three - First Floor Plan

Needham Town Hall Feasibility Study Alternate Three - Second Floor Plan

Needham Town Hall Feasibility Study Alternate Three - Balcony Floor Plan

Needham Town Hall Feasibility Study Town Hall Decorated for Needham Bicentennial

Needham Town Hall Feasibility Study Cover & Credits Prepared for: Needham Town Hall Feasibility Study Committee Permanent Public Building Committee John P. Connelly, Chairman PPBC Kate Fitzpatrick, Town Manager Jack Cogswell, Board of Selectmen Steven Popper, Director of Construction