Loft Conversions Bringing you the latest in sprayfoam insulation technology.

Slides:



Advertisements
Similar presentations
Durra Eco-Form Cabins Build your own home and move in within a week Fast, Simple and Affordable.
Advertisements

Presents 2012 Revisions to the NC Energy Code For Residential Building started after March 1, 2012.
Project management services We do offer to our clients management skills, tools, and required techniques to a broad range of activities in order to meet.
Gable Roof BCGCA3007B.
Leaving Certificate Social and Scientific Home Design and Management Elective ©PDST Home Economics.
Cleaning out the stable for the girls. Bathroom window – we have to leave the stained glass and sash and install the new window on the outside of them.
Improving Energy Efficiency in Traditional Buildings Moses Jenkins Technical Conservation Group.
Building Australia’s Future Energy Efficiency Introductory Awareness Training AUSTRALIAN Greenhouse Office Supported by: Step by Step Application of BCA.
House Construction. Learning Standard 5. Construction Technologies Construction technology involves building structures in order to contain, shelter,
Sapphire INTERIOR DESIGN – PROJECT MANAGEMENT – MAIN CONTRACTORS COMPANY PROFILE Head Office:- Sapphire House, 18 Gladstone Road, Croydon, Surrey, CR0.
An Introduction to the NIA and Insulation Neil Marshall.
IET 120 CONSTRUCTION PROJECT Name: David Marcum. Dwelling  Number of Floors 2 Place image of your floor plan in this space.
Your House as a Healthy System Bruce Stahlberg. Improvements / Remodeling When one has finished building one's house, one suddenly realizes that in the.
IET 120 CONSTRUCTION PROJECT Name: Clarence Hunt.
Dave Brake, Darren Adams, Sean Tobin Charmaine Dean, Jessie MacDonald.
Summary of Energy Star Site Inspection July 11, 2007
‘Market Leaders in Rendered Building Products’ The Poly-Tek Cabin.
Housing Associations A way to improve the inner city.
Building Plans.
EDT Elevations1 Weekend Cabin Retreat Project Elevations Sacramento City College EDT 300/ENGR 306.
EDT Cabin Design Project - Elevations1 Weekend Cabin Retreat Project Elevations Sacramento City College EDT 300 Kenneth Fitzpatrick, P.E.
Planning Construction Chapter 15. Private Sector  Most buildings and other structures are built for ordinary people. These people make up the private.
Unit 6/P6 – Timber Frame Construction Name ________________
THE CRANBEL COURT CITIVIEW AREPO. We are pleased to announce the launch of our new and elegant product, the Cranbel Courts Apartment, Citiview, Arepo.
Professional Roofing Contractors “Using PowerPoint On Your Laptop Computer”
CP Energy Ltd Working for a sustainable lining earth Applied Thermography.
Partners with the worlds leading Insulation manufacturer.
Energy Seminar A prefabricated, non-disruptive approach to whole house energy retrofit. Stock assessment, appropriate properties and implementation. John.
Outcome 2 Requirements for installing sanitary appliances Unit 207: Sanitation.
Drafting 2 (Arch) Quiz Review #6 Quiz Review. 1.To anchor a stud wall to the subfloor, carpenters nail through the: Sole plate Header Jamb Joists Quiz.
When drawing your plan, try and add as much detail as you can, labelling different features, such as double glazed windows and cavity walls. Draw two.
Level 1 Diploma in Plumbing Studies © 2013 City and Guilds of London Institute. All rights reserved. 1 of 23 PowerPoint presentation Preparation techniques.
APPLICATIONS OF TECHNOLOGY
GCSE ENERGY; THERMAL ENERGY TRANSFER 2
Learning Outcome Lesson Objective
Click Once to Begin JEOPARDY! Template created by Bill Arcuri. Edited & Enhanced by Stafford County Public Schools TRTs.
CARPENTRY By: Jason Burkhart. The installation of your floor system will depend on the design of your house. The guidelines we will use are 24ft wide.
Warm-up 9/20/16 What is the underlayment called below the shingles?
Category 2 Small Renovation Project
HEEPS EQUITY LOAN 5th May 2017 Neil Leckie Care & Repair Conference.
OBJ: SWBAT create a CAD Rendering of a Utility shed.
APPLICATIONS OF TECHNOLOGY
Ryan Thurston | Duncan McLennan
Truss Heel Heights and Energy Code Requirements
Superstructures - Roofs
EDENSVILLE ESTATE SIMAWA.
Blueprint Reading and Care
Resale Property Resale Property
Craft Occupations in the Construction Industry
Basement Renovations - Solutions and Ideas
Prepared by Frank Cooney B.Arch MRIA
Warm-up 9/19/16 What template are we using?
Energy Efficiency Standard for Social Housing (EESSH)
Design A Healthy finished basement
Basement Finishing Guide
(façade choice dependent)
The Beehive House, Castledine Street, Loughborough
(façade choice dependent)
Ayazmobg Furniture Systems.
C.M. Scullion Associates Ltd
Common Components of a Traditional Wood Framed Building
Insert Render Image Here
Introduction The Gamma Bracing System
Insert Render Image Here
When all the first fix electrical and plumbing is finished the roofers return to fix the ceiling sheeting in place so the plasterers can arrive on site.
Building standards Mr. Da Silva.
PLASTERBOARD CATEGORY
© OnCourse Learning.
All Africa Housing (PTY) LTD
Introduction The Gamma Bracing System
Presentation transcript:

Loft Conversions Bringing you the latest in sprayfoam insulation technology

Organisation structure for project delivery; NMU4 Ltd are overseeing management contractor LH Architecture are developing each design proposal and the relevant drawings Bright Home Renewables Ltd are the building contractor who installing the package into customers homes

The project; Aimed at the market who cannot afford a full loft conversion Also for those where Building Regulations will not allow a compliant room or stair to be created in loft because of headroom Specifically designed to not need any Local Authority approvals Ideally suited for; Games rooms Hobby rooms Store rooms Spaces void of roof insulation Maximising dry warm space in the home for resale

Customer expectation; The customer will often envision using the space as; The customer can use the space how they like in the future, however we CANNOT sell the product like this because; A home office A children's bedroom A guest bedroom After install the loft is not a legally habitable room because of; Insufficient ventilation (CO 2 issues) Insufficient headroom and access to the Loft Non compliant for Building Regulations as a room

The existing condition; Ideal existing situation pictured left Positioning of timber does not require modification Reasonable access for construction work Existing poor quality insulation All roofing materials can be accommodated by our package (tiles, slate, etc)

Materials delivered The procedure;Day 1 Lay protective coverings throughout working and access areas Cut out and then bridle opening for loft ladder Strap floor (if reqd.) & fit chipboard Lift remaining materials into attic Cover loft hatch Leave all areas tidy

Arrive on site and heat up product The procedure;Day 2 Lay protective coverings Spray foam at approx 100mm from eaves to apex both sides Spray both gable walls Check customer is satisfied and all areas are fully sprayed Cover loft hatch Sign off and tidy work area

Lay protective coverings The procedure;Day 3 Strap ceilings and hanging post using distance screws Fit dwangs to catch edge of plasterboard Fit plasterboard to ceiling areas. Install stud framework to both gable walls Fit plasterboard to gable walls Install loft ladder Clean all areas Remove all debris from site Show client how to operate completed works.

Fully internally lined in plasterboard The finished product Heat retained inside house Creation of more useable, warm space RIBA Architect designed solution Complete design and build process No approvals required Up to 50% reduction in heating costs Experienced local building contractor Fixed price package 3-Day install process

The proposal can be sold as RIBA architect designed Sales notes It is a criminal offence for a non architect to allude or suggest being an architect Bright Home Renewables will be the ‘single point of contact’ for the customer 2 weeks from signature to install Extra cost will be incurred if area of sprayfoam is more than 70sqm Latest technology ‘green’ sprayfoam Customer can increase property resale value with our package

Skirtings and door facings Optional extras (additional fees / costs will apply) Access hatch to access eaves Velux window* *Velux may require planning approval if site is within conservation area, best avoided if possible

Precedent study