PXIE Ion Source & LEBT Commissioning Update Lionel Prost on behalf of A. Shemyakin, R. Andrews, B. Brooker, K. Carlson, J. Czajkowski, R. D’Arcy, B. Hanna,

Slides:



Advertisements
Similar presentations
Introduction to Plasma-Surface Interactions Lecture 6 Divertors.
Advertisements

Diagnostics and commissioning on ERLP Yuri Saveliev ASTeC CONFORM Project: EMMA Design Review Workshop February 2007, Daresbury Laboratory.
Specific latent heat and radiation What is specific latent heat????? This is the energy absorbed or released when a substance changes state or phase.
Technical studies for the HIE- ISOLDE Frontend upgrade Jacobo Montaño Marie Curie Fellow; CATHI Project * The research project has been supported by a.
GRD - Collimation Simulation with SIXTRACK - MIB WG - October 2005 LHC COLLIMATION SYSTEM STUDIES USING SIXTRACK Ralph Assmann, Stefano Redaelli, Guillaume.
Ion Source Update. We now have 2 running sources Source B has been running since the first part of June Both sources have been modified extensively since.
09/13/20111 Status of high intensity polarized electron gun project at MIT-Bates Evgeni Tsentalovich MIT.
1 Status of EMMA Shinji Machida CCLRC/RAL/ASTeC 23 April, ffag/machida_ ppt & pdf.
NUMI NuMI Internal Review July 12, 2001 Infrastructure: Radiation Safety Page 1 Technical Components NuMI Beamline Radiation Safety Issues Radiation Safety.
HINS 6-Cavity Test 3 Month Plan Jan 12, Current Schedule 2-3 day shutdown scheduled to start Jan 18 (Wednesday) to upgrade BPM system and reinstall.
BROOKHAVEN SCIENCE ASSOCIATES 0 Top-Off Safety Yongjun Li ASAC Meeting October 22, 2009.
Experience from the Spallation Neutron Source Commissioning Dong-o Jeon Accelerator Physics Group Oak Ridge National Laboratory May 9, 2007.
Machine status – December 28  Machine status - overview  Blue ring: ramp development  Yellow ring: obstruction update  Set-up and ramp-up.
Low Energy RHIC e - Cooling Meeting Minutes – 11/19/14 1. Cooling Section Magnets and Power Supplies –Most of power supplies will be from ERL (R. Lambiase).
Results of the argon beam test at Linac3 D. Küchler BE/ABP/HSL Including feedback from R. Scrivens and M. Bodendorfer.
Low Energy RHIC e - Cooling Meeting Minutes – 11/5/14 1.J. Tuozzolo will schedule a visit to NSLS next week to evaluate available magnets, power supplies,
Status and schedule for the H - source upgrade at HINS beam line HINS Meson meeting January 5 th, 2012 L. Prost (most inputs from Steve Hays & Alex Chen)
March 18, 2008 TJRMICE Beamline Status1 MICE Beamline Status (March 18, 2008) Tom Roberts Muons, Inc. Illinois Institute of Technology.
RF source, volume and caesiated extraction simulations (e-dump)
Developments of the FETS Ion Source Scott Lawrie.
Recycler Flying Wires Martin Hu Recycler Department.
Low Energy RHIC e - Cooling Meeting Minutes – 12/23/ Cooling Section: –LF Solenoids:  At PPM, G. Woods has assigned buyer, SOW will be revised,
Commissioning of REX Jose Alberto Rodriguez, BE-OP-PSB (167538) on behalf of the ISOLDE operations team.
LINAC3 UPGRADE Source and LEBT modifications for YETS and recommissioning timetable 28/10/2015 Ville Toivanen.
H4F Physics Day 2014 C.Ullmann Proton injector status for FAIR and measurements at BETSI test bench (CEA/Saclay) 2014.
LINAC4 emittance measurements BI Day Divonne, 24 th November 11/24/2011 B.Cheymol, E. Bravin, D. Gerard, U. Raich, F. Roncarolo BE/BI 1.
PXIE Ion Source and LEBT Installation Status L. Prost, B. Hanna, R. Andrews Project X Technical Meeting October 29 th, 2013.
PXIE Beam Instrumentation Status Update – Preparing for MEBT 1.1 Beam Vic Scarpine Feb. 9, 2016.
ESS wire scanner Benjamin Cheymol
PXIE LEBT Status Update Lionel Prost PIP-II “Friday” Meeting January 16 th, 2015.
PIP-II R&D Program PXIE Ion source and LEBT Lionel Prost PIP-II Machine Advisory Committee Meeting March 2016.
SL_THOMSON C. Vaccarezza on behalf of the SL_Thomson team.
H - ion source at the pre-acc R&D lab Update HINS Meson meeting January 20 th, 2011 L. Prost, C. Schmidt, D. Bollinger, R. Tomlin.
PXIE absorber test bench A. Shemyakin, C. Baffes, K. Carlson, B. Hanna, L. Prost, J. Walton November 6, 2012 Project X meeting Test bench description Difficulties:
PXIE warm front end status A. Shemyakin PIP-II technical meeting 3 May 2016.
RFQ Installation Plan PIP-II Meeting, 14-July-2015 C. Baffes for R. Andrews, A. Chen, Y. Czajkowski, S. Kazakov, R. Pasquinelli, D. Peterson, O. Pronitchev,
PXIE Beam Instrumentation Status Update Vic Scarpine Weekly PIP-II Meeting June 7, 2016.
Warm Front End Concept A. Shemyakin PIP-II Machine Advisory Committee 9-11 March 2015.
Programme for the Physics Start-up Stable and radioactive beams Jose Alberto Rodriguez, BE-OP-PSB (167538)
PIP-II Beam Instrumentation Vic Scarpine PIP-II Machine Advisory Committee Meeting March 2016.
D. Li, Project X Collaboration Meeting, Fermilab (October 25-27, 2011) Overview of Project X Frond-End R&D at LBNL Derun Li Project X Collaboration Meeting.
ESS Front End diagnostic
Pelletron status update Main Injector Departmental Meeting November 11 th, 2009 L. Prost.
0 Ion Beam Facilities at KOMAC Chan Young Lee on behalf of KOMAC Chan Young Lee on behalf of KOMAC ICABU2014, November 12~14,
Status of Mechanical Design of LEBT Rich Andrews, Matt Alvarez, Tim Hamerla, Danny Snee.
Space-Charge Compensation in the PXIE LEBT C. Wiesner, J.-P. Carneiro, A. Chen, B. Hanna, L. Prost, V. Scarpine, A. Shemyakin April 21, 2015.
Ion Source and LEBT Statuses L. Prost (with many contributions from others) Project X Technical Meeting July 3, 2012.
S A Griffiths CM42 June 2015 Electrical & Control.
Dmitry Kayran on behalf of LEReC team Brookhaven National Laboratory
Feng Zhou LCLS-II AP meeting 02/23/2017
HIE-ISOLDE Report Jose Alberto Rodriguez on behalf of Yacine Kadi and the HIE-ISOLDE project team.
by P. Musumeci and F.Tazzioli
LINAC 4 source & LEBT measurement results
Target and Horn status report
Proton Source and LEBT Luigi Celona & Lorenzo Neri
Part 2: Comparison of measurements and simulations for OBLA-500keV
Spherical Measuring Device of Secondary Electron Emission Coefficient Based on Pulsed Electron Beam Kaile Wen Shulin Liu Baojun Yan Yuzhen Yang Yang.
Parameters of the NF Target
Advanced Research Electron Accelerator Laboratory
November 14, 2008 The meeting on RIKEN AVF Cyclotron Upgrade Progress report on activity plan Sergey Vorozhtsov.
commissioning and measurements
November 7, 2008 The meeting on RIKEN AVF Cyclotron Upgrade Progress report on activity plan Sergey Vorozhtsov.
Ion Source and LEBT control system topology, Interlock strategy
ISRC and LEBT Vacuum System Design
Positive Ion Current – Hot Coulomb Explosion?
LEBT water cooling system
Linac Diagnostics Commissioning Experience
Ion Source and LEBT Beam Diagnostics
(Beam) Commissioning Plan
Isotope Readiness Review Run Plans
Presentation transcript:

PXIE Ion Source & LEBT Commissioning Update Lionel Prost on behalf of A. Shemyakin, R. Andrews, B. Brooker, K. Carlson, J. Czajkowski, R. D’Arcy, B. Hanna, S. Hays, D. Heikkinen, W. Johnson, M. Kucera, G. Saewert, V. Scarpine, D. Snee, J. Steimel, T. Zuchnik, mechanical, electrical and other technical support PIP-II Technical Meeting May 13 th, 2014

Content Highlights of main measurements  Beam size  Pulse mode  Neutrals Operation/hardware remarks Shutdown 2

Setup before shutdown 3 Solenoid DCCT Faraday Cup ‘New’ isolated diaphragm a.k.a. donut a.k.a. TID Isolated diaphragm connectors Bellow

Beam size measurements Beam size is obtained by moving the beam across the donut aperture  Beam current in FC vs. Solenoid corrector current B. Marsh wrote a Java application to speed up data acquisition and improve reproducibility of the measurements  Helped a lot !  Next step is to implement the computation of the beam size within the program 4 25-Apr-2014 Current to FC as a function of the solenoid correctors (moved by (1,1) MULT) for 6 solenoid currents, from 168 to 148A. Data were taken with B. Marsh’s program. Beam Donut aperture

Refined beam size measurements analysis procedure Fit entire curves assuming a Gaussian distribution being sampled across an aperture  Four (4) fitting parameters  Beam current  Correctors calibration coefficient (i.e. mm/A)  Center position  Rms beam size  For small beam sizes, this fitting gives the same result as “95%-to-95%” procedure used previously  Recent data is being analyzed 5 Example of fitting of the curves for the solenoid current of 168 A. Solenoid corrector current, A

Solenoid scans in pulse mode 6 Carried out scans at various times within the pulse  Beam size changes quite significantly between the beginning and the end of the pulse (i.e. DC-like)  Likely effect from neutralization 5 mA, 200  s pulse, 10 Hz 05/02/14 Beam size as a function of the solenoid current at 10, 30, 50 and 100  s after the start of the pulse Dashed lines are arbitrary fits to guide the eye

Neutrals (H 0 ) 7 With the beam well centered in the donut, its temperature still rises significantly  Indicates particles loss Neutrals Donut DCCT Red and blue lines: Primary beam envelope (simulation) Constant current from FC and donut when doing beam size measurements  Temperature rise very unlikely due to primary beam halo

Estimation of the amount of neutrals Thermal characteristic of the donut inferred from heating and cooling measurements  Calculate the average deposited power for 5 mA beam = 6.3W  If energy is 30keV, it corresponds to 4% of the beam “current” From measurements with the solenoid on and off, we find that ~60% of the neutrals bombard the donut  Amount of energetic neutrals produce at the ion source: 4%/0.6 = 7% of the total beam current Assuming neutrals distribution to be Gaussian only 10% of these pass through the donut and propagate downstream 8 04/11/14 Current to TID, FC, and TID temperature vs time. TID bias=+40V. Solenoid=160A. The beam is centered in TID. Example of heating measurement (5 mA beam, ~no loss)

Operation Approved for remote operation yesterday  i.e. don’t have to stand by the machine  Warning light indicating ‘HV enabled’ will be installed  Not a requirement from ES&H 9

Solenoid current lag (i.e. temperature dependence) When changing the solenoid current settings, it takes quite a long time to reach a constant value  As much as 5 minutes at turn on i.e. large setting change  A couple of minutes for several amps changes Present PS are voltage regulated  Need Current regulation = $$$ (next fiscal year?) 10 Solenoid current was changed from 0 A to 160 A Known, large difference between set point and read back in ACNET  Somewhat fixed now 4/24/14 Stability requirement: 0.1%

Temperature distribution at the bellow Installed ‘shield’ on the IS vacuum chamber downstream aperture to prevent the bellow to be irradiated by primary beam 11 03/25/14 5 mA I Sol = 160 A I CorrX = -1 A I CorrY = -2 A 04/11/14 5 mA I Sol = 160 A I CorrX = -1.2 A I CorrY = -2.1 A With shieldWithout shield

Last week’s shutdown Driven by the installation of the emittance scanner Other activities in parallel  Replace bellow shield with one with a smaller aperture (38.1 mm ID  34 mm ID)  Flip DCCT 12

Current setup in picture 13 DCCT Faraday Cup ‘donut’ a.k.a. TID Emittance scanner probe Gate valve Turbo pump

Plan Finish characterization of the beam through ~1m of the LEBT (including beam dynamics through one solenoid)  Emittance scanner commissioning Installation of the remaining of the LEBT all at once  Goal is to start commissioning mid- to late July  All solenoids have been delivered and are being measured  A lot of the infrastructure is ready or nearly ready (e.g.: water distribution system)  Current ‘push’ on the design of the chopper 14