26 October 2010IIFC meeting, RRCAT Indian Institutions and Fermilab Collaboration Activities at IUAC Presented by D. Kanjilal Inter-University Accelerator.

Slides:



Advertisements
Similar presentations
Overview of SMTF RF Systems Brian Chase. Overview Scope of RF Systems RF & LLRF Collaboration LLRF Specifications for SMTF Progress So Far Status of progress.
Advertisements

Indian Plan for Contribution in Superconducting Cavity & Cryomodule Technology Prashant Khare Avinash Puntambekar RRCAT,India.
Accelerator Science and Technology Centre Prospects of Compact Crab Cavities for LHC Peter McIntosh LHC-CC Workshop, CERN 21 st August 2008.
FNAL Superconducting RF Program Sergei Nagaitsev.
Status of the SPL cavities at CERN I.Aviles & N. Valverde on behalf of SPL team 1I. Aviles & N. ValverdeLund, 11 December 2013.
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
Dr. Michael Peiniger Superconducting RF activities at RI Research Instruments with a focus on EXFEL cavity production.
Progress of SRF and ERL at Peking University Lu Xiangyang Institute of Heavy Ion Physics Peking University.
Linac Front-End R&D --- Systems Integration and Meson Lab Setup
SRF Linac Development for Indian Energy Program
Activities of Superconducting RF Accelerators at Nanjing University Sun An Proton Linear Accelerator Institute Institute of Energy Sciences, Nanjing University.
THE COCKCROFT INSTITUTE of ACCELERATOR SCIENCE and TECHNOLOGY UKNF RF: Status Cockcroft Institute (Dept. Engineering, Lancaster University, UK) January.
Summary of WG 2 - cavities W. Weingarten 15th SPL Collaboration Meeting CERN - 25/26 Nov Cavity WG.
Status of cavity fabrication facility at KEK H. Hayano, KEK Cavity Industrialization Study at KEK Superconducting RF Cavity Technology and Industrialization.
SRF Plans at ANL & FNAL Bob Kephart ILC Program Director, Fermilab ANL-FNAL-U of C Collaboration Meeting Oct 12, 2009.
FNAL Visit to Century Metal Spinning Current P.O. for: 2 - Titanium Helium Vessel Tubes (20” I.D. x 3/16” Wall x 14.5” Long) MHz β=0.9 Nb Beam Tubes.
Advanced Energy Systems, Inc. Prototype Cavity Fabrication & Test Presented by Ilan Ben-Zvi, BNL for Michael Cole, AES.
Status of U.S. Cavity & Cryomodule Industrialization Bob Kephart LCWS10/GDE Beijing, March, 2010.
Mid Term Review Meeting, 26 September 2012N. SURNAME1 * The research project has been supported by a Marie Curie Early Initial Training Network Fellowship.
1 Spoke cavities for ESS and MYRRHA G. Olry, P. Duchesne (IPN Orsay) SLHiPP-2, 3-4 May 2012, Catania.
PIP-II: Why a new accelerator? Paul Derwent Fermilab Community Advisory Board 23 July 2015.
Accelerator/ Medium Beta Cavities Paolo Michelato INFN Milano - LASA April 21, 2015.
ANL CRAB CAVITY JEFFERSON LAB LHC-CC08 BROOKHAVEN FEBRUARY 25, 2008 LARRY TURLINGTON.
U.S. Plan for Cavity Production Bob Kephart ALCPG09/GDE Sep 30, 2009.
Performance analysis of cryogenic system and cryomodules for the complete superconducting linear accelerator at IUAC, New Delhi. T S Datta ( On behalf.
A Four Rod Compact Crab Cavity for LHC Dr G Burt Lancaster University / Cockcroft Institute.
2 nd Workshop of the IHEP 1.3 GHz SRF R&D Project and 2nd IHEP-KEK 1.3 GHz SRF Meeting Opening Remark J. Gao December 2-3, 2009, IHEP, Beijing, China.
ALCPG2011, 3/19- 23, SRF Group Institute of Heavy Ion Physics, Peking University ALCPG /3/19-23, Eugene, Oregon, USA RF superconducting Cavity.
Satish Chandra Joshi Raja Ramanna Centre for Advanced Technology, Indore, India Presentation in Web Meeting with Fermilab April 20, 2009.
SSR1 Summary Harry Carter & Tom Peterson 19 November 2010.
Development of Infrastructure Facilities for Superconducting RF Cavity Fabrication, Processing and 2 K Characterization at RRCAT Satish Chandra Joshi,
650 MHz Beta = 0.61 Cavity Design, Fabrication and Testing R. Rimmer for F. Marhauser Jefferson Lab, Newport News, Virginia 23606, USA Project-X Collaboration.
Cavity and Cryomodule Progress at RRCAT Satish Joshi Raja Ramanna Centre for Advanced Technology, Indore, India.
1 Project X Workshop November 21-22, 2008 Richard York Chris Compton Walter Hartung Xiaoyu Wu Michigan State University.
7th SRF Materials Workshop FRIB SRF Cavities 7/16/12 Chris Compton.
Indian Institutions and Fermilab Collaboration on Accelerator for Indian Nuclear Energy Program P. Singh Bhabha Atomic Research Centre Mumbai January.
Andrew BurrillFall 2011 Project X Collaboration Meeting 650 MHz Developments at JLAB Andrew Burrill for the JLab Team.
SRF Collaboration Shekhar Mishra Fermilab. Overview Charge: Does the laboratory make effective use of collaboration and existing SRF capabilities at other.
International Collaborations: DAE-DOE Discovery Science Collaboration Shekhar Mishra, PIP-II MAC Review March 9-11, 2012.
Engineering of the power prototype of the ESRF HOM damped cavity* V. Serrière, J. Jacob, A. Triantafyllou, A.K. Bandyopadhyay, L. Goirand, B. Ogier * This.
FNAL Superconducting RF Program Bob Kephart. Goals of the Fermilab SRF Program Support the strategic goals of the U.S. HEP program  Energy frontier:
ESS SC cavities development G. Devanz TTC meeting, march 1st 2011, Milano.
Fermilab-India Agreements and Collaboration Shekhar Mishra Project-X, International Collaboration Coodinator Fermi National Accelerator Laboratory Batavia,
Cavities, Cryomodules, and Cryogenics Working Group 2 Summary Report Mark Champion, Sang-ho Kim Project X Collaboration Meeting April 12-14, 2011.
Single Spoke Resonator SSR1 Construction Status P.N.Prakash Inter-University Accelerator Centre, New Delhi, INDIA.
650MHz Cavity, Helium Vessel, and Tuner Status at Fermilab Chuck Grimm IIFC POC 650MHz Cavities Fermilab (Avinash Puntambekar RRCAT)
SRF Advances for ATLAS and Other 
650 MHz, Beta = 0.9, 11 April 2012Page 1650 MHz, Beta = 0.9, 11 April 2012Page 1 Project X Beta = 0.9, 650 MHz Cavity and Cryomodule Status Tom Peterson.
Beam Dynamics Studies of the HIE-ISOLDE Superconducting LINAC at CERN
Bunching system for SPES project
Leonardo Ristori Crab Cavities L2 Manager
(4 areas/website front)
Crab Cavities Contribution from the U.S.
Cavity Test Results for PIP-II
Energy (ILC) and Intensity (Project X) SRF Cavity Needs
T5.2: Harmonization - Material and Component Reference
Complementary ISTC Projects #3888, 3889p
Progress and Issues with VTS Upgrade
Peng Sha Institute of High Energy Physics, CAS
TTC - JLab - Bob Laxdal - TRIUMF
Activities of Cavity Fabrication Facility at KEK
SRF Industrialization American Region Laboratory Plans
SC spoke cavity for China-ADS 3~10MeV injector
Progress in Asia Hitoshi Hayano,KEK,
Operation experience of cryogenic system and cryomodules for the superconducting linear accelerator at IUAC, New Delhi. T S Datta ( On behalf of Cryogenics.
High Intensity Neutrino Source R&D Overview
ADS Accelerator Program in China
Daresbury ESS In-Kind Contributions
Crab – RFD prototype: Fabrication Status Update
JLEIC SRF update SRF team
Presentation transcript:

26 October 2010IIFC meeting, RRCAT Indian Institutions and Fermilab Collaboration Activities at IUAC Presented by D. Kanjilal Inter-University Accelerator Centre

26 October 2010IIFC meeting, RRCAT Introduction SSR1 Present Status 1.3 GHz Single Cell Other Cavity development

26 October 2010IIFC meeting, RRCAT Under an MoU between IUAC and FNAL, two Niobium Single Spoke Resonators - SSR1 (  =0.22, f=325MHz) are being built by IUAC. The Outer SS vessel would be built and jacketed around the niobium resonators at FNAL. Fabrication of two Single Spoke Resonators, SSR1

26 October 2010IIFC meeting, RRCAT Niobium material received from FNAL ~ Sept Technical discussions & negotiations with vendor started in January - March Work started by the vendor in October Expected to be completed by 31 st March 2011

26 October 2010IIFC meeting, RRCAT Dies (using mild steel) made and components made in Copper Dies fine tuned and corrected to reduce variations. Subsequently Nb components were formed.

26 October 2010IIFC meeting, RRCAT Die for spoke Spoke-to-collar End Wall dies Rib donut

26 October 2010IIFC meeting, RRCAT Half-Spoke in Cu Half-Spoke in Nb Spoke welded

26 October 2010IIFC meeting, RRCAT Rolled Nb shells Set-up for EBW of Shell

26 October 2010IIFC meeting, RRCAT End Wall in Cu End Wall in Nb

26 October 2010IIFC meeting, RRCAT 1.3 GHZ Single Cell

26 October 2010IIFC meeting, RRCAT Future Plans Complete 2 SSR1 cavities Take up fabrication of 4 SSR1s Nb part SS jacket (He Vessel) in collaboration with VECC EB Weld two more single-Cell 1.3 GHz cavities EB Weld 7 - Cell 1.3 GHz Cavity. For 9-Cell cavity modification of EBW table required. Develop parameters for EB Weld of 650 MHz,  = 0.9 cavity and EBW of single cell and 5-Cell

26 October 2010IIFC meeting, RRCAT Other SRF Activities at IUAC Develop prototype  = 0.05 new QWR cavity for HCI Fabricate 8 low beta cavities Make additional 6  = 0.08 QWR cavities Renovate Surface treatment Laboratory and upgrade EBW facility.

26 October 2010IIFC meeting, RRCAT DAE-BRNS Indian Particle Accelerator Conference, 2011 (InPAC2011) Accelerator Conference, 2 Inter-University Accelerator Centre Aruna Asaf Ali Marg New Delhi

26 October 2010IIFC meeting, RRCAT Thank You

26 October 2010IIFC meeting, RRCAT

26 October 2010IIFC meeting, RRCAT

26 October 2010IIFC meeting, RRCAT Electron Beam welding facility 60 kV, 15 kW, CNC controlled. Chamber size:2.5 m x 1.0 m x 1.0 m